COOKE FM 1306 (0195-05-013)

Items: 90

County: COOKE
Length: 0.0000 MILES
Highway: FM 1306
District: WICHITA FALLS
Control Number: 0195-05-013
DBE Goal: 0.0%
Project: STP 2025(223)TAPS
Guaranty: $62,000.00
Time: 192 WORKING DAYS
Engineer's Estimate: $2,835,173.67
Date: 03/04/2026 (3 months ago)
Contract Number: 3263023
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Project ID: A00207039
Contract Type: Federal
Project Description: THE PROJECT WILL INSTALL A 6-FOOT-WIDE SIDEWALK TO CONNECT THE CITY CENTER TO GAINESVILLE HIGH SCHOOL, NORTH CENTRAL TEXAS COLLEGE, MOFFET PARK AND LEONARD PARK.
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
COLBY SHELTON
AARON BLOOM
MADISON HAVERKAMP
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (12)
E
Engineer's Estimate
$2,835,173.67
Over/Under Est: -22.65% -$642,201.92
$2,231,704.00
Over/Under Est: -21.29% -$603,469.67
Amt Left: 1.77% $38,732.25
Over/Under Est: -18.99% -$538,428.17
Amt Left: 4.73% $103,773.75
Delta: -2.91% -$65,041.50
$2,365,287.80
Over/Under Est: -16.57% -$469,885.87
Amt Left: 7.86% $172,316.05
Delta: -2.98% -$68,542.30
$2,470,594.75
Over/Under Est: -12.86% -$364,578.92
Amt Left: 12.66% $277,623.00
Delta: -4.45% -$105,306.95
Over/Under Est: -11.17% -$316,586.80
Amt Left: 14.85% $325,615.12
Delta: -1.94% -$47,992.12
Over/Under Est: -5.56% -$157,648.52
Amt Left: 22.1% $484,553.40
Delta: -6.31% -$158,938.28
$2,791,150.74
Over/Under Est: -1.55% -$44,022.93
Amt Left: 27.28% $598,178.99
Delta: -4.24% -$113,625.59
$2,828,006.45
Over/Under Est: -0.25% -$7,167.22
Amt Left: 28.96% $635,034.70
Delta: -1.32% -$36,855.71
Over/Under Est: 15.29% $433,551.18
Amt Left: 49.05% $1,075,753.10
Delta: -15.58% -$440,718.40
Over/Under Est: 23.34% $661,761.38
Amt Left: 59.46% $1,303,963.30
Delta: -6.98% -$228,210.20
Over/Under Est: 30.49% $864,306.13
Amt Left: 68.7% $1,506,508.05
Delta: -5.79% -$202,544.75

Bid Items & Bid Tabulations

90 Total 0 of 90
COOKE  |  FM 1306  |  WICHITA FALLS  |  0195-05-013  |  03/04/2026  |  $2,835,173.67  |  STP 2025(223)TAPS  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  192 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS STEEL INDUSTRIAL PLACING, LLC
STX CIVIL
XIT PAVING AND CONSTRUCTION INC.
TI-ZACK CONCRETE, LLC
ALTUS CONSTRUCTION LLC
PROFESSIONAL TRAFFIC CONTROL LLC
GARRET SHIELDS INFRASTRUCTURE
TUCAN CONTRACTING, LLC
JAGOE-PUBLIC COMPANY
ED BELL CONSTRUCTION COMPANY
BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC
O. TREVINO CONSTRUCTION, LLC
REMOV CONC (RIPRAP)
SY 13.000 $33.390 $120.000 $9.000 $60.000 $35.080 $29.526 $12.350 $40.000 $33.000 $50.000 $63.210 $65.000 $88.000
REMOV CONC (DRIVEWAYS)
SY 503.000 $30.000 $50.000 $15.500 $41.000 $36.260 $25.839 $17.540 $40.000 $22.000 $40.000 $21.770 $15.000 $72.000
REMOV CONC (CURB OR CURB & GUTTER)
LF 99.000 $14.000 $20.000 $6.500 $35.000 $9.210 $11.332 $16.370 $10.000 $16.500 $35.000 $11.000 $15.000 $22.000
RMV (0"-8") TRT/UNTRT BASE & ASPH PAV
SY 1,042.000 $17.000 $15.000 $13.000 $16.000 $35.010 $11.289 $5.700 $10.000 $16.500 $10.000 $29.600 $22.000 $37.000
EXCAV (ROADWAY)
CY 1,172.000 $20.000 $25.000 $28.000 $60.000 $19.450 $28.733 $28.500 $40.000 $27.500 $80.000 $19.760 $25.000 $35.000
EMBANK (FNL)(OC)(TY B)
CY 1,707.600 $33.000 $45.000 $25.000 $50.000 $13.350 $42.227 $65.860 $40.000 $33.000 $70.000 $56.670 $40.000 $118.000
BLOCK SODDING
SY 7,074.000 $7.000 $4.750 $7.000 $7.000 $6.600 $5.488 $7.860 $10.000 $5.230 $5.000 $4.960 $7.500 $5.000
VEGETATIVE WATERING
TGL 635.000 $30.000 $1.000 $20.000 $15.000 $1.100 $29.960 $28.300 $40.000 $25.520 $1.000 $1.000 $60.000 $75.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 140.000 $90.000 $160.000 $85.000 $180.000 $137.500 $402.785 $83.000 $120.000 $93.500 $250.000 $266.670 $85.000 $400.000
DRILL SHAFT (TRF SIG POLE) (30 IN)
LF 32.000 $500.000 $234.920 $308.000 $271.000 $257.400 $272.014 $450.000 $300.000 $481.800 $280.000 $456.970 $285.000 $275.000
CL A CONC (COLLAR)
EA 1.000 $1,500.000 $1,500.000 $1,500.000 $1,300.000 $1,984.520 $1,476.327 $1,596.000 $1,000.000 $2,750.000 $3,000.000 $3,025.340 $2,500.000 $3,115.000
CL C CONC (MISC)
CY 22.600 $1,100.000 $550.000 $800.000 $950.000 $798.630 $415.574 $1,500.000 $1,000.000 $1,100.000 $565.000 $2,432.780 $1,500.000 $1,380.000
RETAINING WALL (SPREAD FOOTING)
SF 2,520.000 $140.000 $95.000 $72.000 $76.000 $104.410 $98.202 $105.800 $150.000 $165.000 $135.000 $134.280 $110.000 $175.000
RIPRAP (CONC)(5 IN)
CY 150.500 $600.000 $550.000 $720.000 $705.000 $798.630 $683.183 $665.500 $900.000 $715.000 $575.000 $901.850 $800.000 $930.000
RIPRAP (CONC)(FLUME)
CY 19.500 $1,000.000 $550.000 $850.000 $696.000 $798.630 $659.571 $670.000 $800.000 $742.500 $850.000 $1,208.140 $1,000.000 $1,260.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 30.000 $840.000 $550.000 $800.000 $696.000 $798.630 $517.191 $650.000 $1,000.000 $605.000 $485.000 $1,202.830 $600.000 $985.000
RAIL (HANDRAIL)(TY B)
LF 804.000 $200.000 $99.280 $130.000 $110.000 $110.000 $87.771 $135.400 $125.000 $165.000 $115.000 $103.580 $250.000 $165.000
CONC BOX CULV (5 FT X 3 FT)
LF 27.000 $535.000 $650.000 $721.000 $515.000 $1,068.100 $583.540 $530.000 $500.000 $990.000 $985.000 $836.370 $850.000 $1,020.000
RC PIPE (CL III)(18 IN)
LF 16.000 $135.700 $120.000 $200.000 $147.000 $172.700 $148.139 $92.720 $200.000 $104.500 $200.000 $449.320 $125.000 $520.000
WINGWALL (SW - 0) (HW=6 FT)
EA 2.000 $15,250.000 $15,000.000 $20,000.000 $11,500.000 $9,772.400 $14,268.274 $17,500.000 $8,000.000 $14,300.000 $10,000.000 $19,437.650 $9,000.000 $15,290.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 1.000 $1,300.000 $2,000.000 $2,300.000 $3,000.000 $2,502.500 $2,541.599 $1,737.000 $2,000.000 $1,650.000 $2,500.000 $1,618.750 $2,500.000 $3,600.000
GRATE & FRAME
EA 66.000 $1,475.000 $1,600.000 $1,500.000 $1,200.000 $1,266.250 $1,484.924 $2,250.000 $1,500.000 $1,650.000 $1,500.000 $1,468.670 $1,750.000 $950.000
REMOV STR (SET)
EA 1.000 $500.000 $500.000 $500.000 $809.000 $982.300 $679.545 $670.000 $500.000 $550.000 $350.000 $766.910 $1,000.000 $1,250.000
REMOV STR (PIPE)
LF 16.000 $20.000 $25.000 $15.000 $62.000 $59.400 $27.268 $33.750 $20.000 $22.000 $50.000 $75.570 $20.000 $180.000
MOBILIZATION
LS 1.000 $99,400.600 $219,277.440 $174,000.000 $150,000.000 $173,218.500 $245,825.960 $100,000.000 $200,000.000 $275,000.000 $310,000.000 $333,333.000 $350,000.000 $370,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $10,000.000 $3,250.000 $2,000.000 $4,000.000 $1,650.000 $20,588.438 $3,000.000 $5,000.000 $3,300.000 $26,000.000 $16,859.120 $3,000.000 $17,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $10,000.000 $20,000.000 $8,500.000 $5,089.000 $1.100 $6,252.682 $1,000.000 $1,000.000 $9,900.000 $25,500.000 $15,000.000 $2,500.000 $32,000.000
TMA (STATIONARY)
DAY 231.000 $275.000 $100.000 $195.000 $282.000 $1.100 $173.685 $200.000 $300.000 $275.000 $285.000 $100.000 $235.000 $150.000
TMA (MOBILE OPERATION)
DAY 20.000 $350.000 $1.000 $200.000 $1,800.000 $1.100 $130.264 $250.000 $300.000 $220.000 $325.000 $800.000 $300.000 $425.000
CONC CURB (TY II)
LF 344.000 $70.000 $40.000 $30.000 $15.000 $50.180 $42.770 $19.500 $40.000 $33.000 $25.000 $33.740 $75.000 $35.000
CONC CURB & GUTTER (TY II)
LF 6,661.000 $50.000 $40.000 $38.000 $43.000 $39.170 $32.798 $38.500 $40.000 $33.000 $40.000 $53.480 $85.000 $50.000
CONC CURB (SLOTTED)
LF 22.000 $70.000 $60.000 $50.000 $51.000 $47.600 $65.071 $38.500 $50.000 $49.500 $240.000 $88.920 $85.000 $155.000
CONC CURB & GUTTER (ARMOR CURB)
LF 84.000 $215.000 $300.000 $700.000 $272.000 $301.460 $374.219 $40.300 $200.000 $330.000 $400.000 $426.240 $250.000 $275.000
CONC CURB (RIBBON)
LF 8.000 $50.000 $150.000 $55.000 $98.000 $40.770 $78.158 $72.000 $50.000 $44.000 $200.000 $384.630 $85.000 $420.000
DRIVEWAYS (CONC)
SY 784.000 $125.000 $100.000 $110.000 $95.000 $118.390 $123.563 $145.250 $120.000 $121.000 $110.000 $126.740 $190.000 $160.000
CONC SIDEWALKS (4")
SY 4,834.000 $119.000 $70.000 $75.000 $73.000 $117.640 $64.800 $119.500 $100.000 $104.500 $55.000 $119.270 $170.000 $120.000
CURB RAMPS (TY 1)
SY 52.000 $275.000 $125.000 $120.000 $120.000 $167.480 $303.566 $160.000 $300.000 $330.000 $350.000 $214.970 $190.000 $400.000
CURB RAMPS (TY 3)
SY 11.000 $300.000 $125.000 $120.000 $191.000 $167.480 $123.316 $170.000 $300.000 $330.000 $300.000 $237.330 $190.000 $550.000
CURB RAMPS (TY 6)
SY 39.000 $275.000 $125.000 $120.000 $189.000 $167.480 $129.395 $180.000 $300.000 $330.000 $250.000 $256.410 $190.000 $400.000
CURB RAMPS (TY 7)
SY 142.000 $275.000 $125.000 $120.000 $149.000 $167.480 $216.440 $196.000 $300.000 $330.000 $150.000 $198.710 $190.000 $400.000
CURB RAMPS (TY 21)
SY 32.000 $275.000 $125.000 $120.000 $139.000 $129.800 $231.870 $220.000 $300.000 $605.000 $215.000 $245.370 $190.000 $400.000
CONC SIDEWALKS (SPECIAL)
SY 416.000 $170.000 $215.000 $230.000 $170.000 $272.260 $208.783 $296.600 $150.000 $330.000 $130.000 $532.490 $190.000 $350.000
IN RD IL (TY SA) 30S-8 (250W EQ) LED
EA 4.000 $3,400.000 $6,546.310 $8,579.500 $7,571.000 $7,200.600 $7,580.000 $5,000.000 $7,500.000 $4,345.000 $7,275.000 $4,121.040 $7,850.000 $7,600.000
CONDT (PVC) (SCH 40) (2")
LF 140.000 $19.500 $19.830 $26.000 $23.000 $21.810 $22.961 $12.500 $25.000 $11.540 $22.000 $10.940 $25.000 $24.000
CONDUIT (PREPARE)
LF 330.000 $4.000 $17.630 $23.000 $20.000 $19.390 $20.413 $7.100 $22.000 $5.730 $19.500 $5.440 $23.000 $21.000
ELEC CONDR (NO.6) BARE
LF 40.000 $4.000 $3.620 $4.500 $4.000 $3.980 $4.191 $1.700 $4.500 $2.890 $4.000 $2.740 $4.500 $4.500
ELEC CONDR (NO.6) INSULATED
LF 360.000 $4.000 $4.050 $5.500 $5.000 $4.460 $4.689 $2.500 $5.000 $2.510 $4.500 $2.380 $5.000 $4.750
GROUND BOX TY D (162922)W/APRON
EA 2.000 $2,000.000 $2,941.840 $3,855.500 $3,402.000 $3,235.100 $3,406.368 $1,320.000 $3,500.000 $1,650.000 $3,268.710 $1,564.950 $3,700.000 $3,455.000
REMOVE GROUND BOX
EA 1.000 $570.000 $264.450 $346.500 $306.000 $290.400 $306.207 $354.000 $330.000 $330.000 $293.830 $312.990 $325.000 $311.000
ALUMINUM SIGNS (TY A)
SF 63.000 $45.000 $18.750 $164.000 $46.000 $42.900 $45.644 $30.000 $18.000 $36.970 $25.000 $35.070 $50.000 $47.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 2.000 $950.000 $586.740 $989.500 $868.000 $495.000 $805.467 $900.000 $570.000 $758.560 $1,040.000 $719.460 $1,000.000 $1,000.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 14.000 $740.000 $322.600 $590.000 $462.000 $165.000 $542.767 $600.000 $280.000 $534.600 $694.750 $507.040 $1,000.000 $1,000.000
REMOVE SM RD SN SUP&AM
EA 2.000 $100.000 $99.000 $327.500 $578.000 $165.000 $99.869 $115.000 $100.000 $137.500 $116.000 $130.420 $125.000 $120.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 4.000 $80.000 $34.370 $150.000 $289.000 $137.500 $93.356 $162.000 $38.000 $100.050 $68.500 $208.660 $100.000 $90.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 564.000 $14.000 $9.500 $12.500 $6.000 $8.750 $11.000 $8.500 $13.000 $10.450 $10.000 $8.290 $12.000 $11.500
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 1.000 $220.000 $250.000 $327.500 $289.000 $275.000 $289.476 $200.000 $350.000 $275.000 $263.250 $260.830 $300.000 $300.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 8.000 $60.000 $37.500 $49.000 $289.000 $66.000 $43.421 $37.500 $120.000 $41.250 $39.500 $62.600 $47.000 $45.000
PAVEMENT SLER 24"
LF 564.000 $2.000 $1.000 $1.500 $6.000 $3.300 $1.157 $2.280 $1.100 $1.100 $1.000 $3.130 $1.250 $1.500
PAVEMENT SLER (ARROW)
EA 1.000 $40.000 $25.000 $33.000 $289.000 $88.000 $28.947 $38.000 $12.000 $27.500 $26.250 $83.460 $31.000 $30.000
PAVEMENT SLER (YLD TRI)
EA 8.000 $25.000 $5.000 $6.500 $289.000 $33.000 $5.789 $20.000 $6.000 $5.500 $5.250 $31.300 $6.500 $6.000
ELIM EXT PM & MRKS (ARROW)
EA 1.000 $50.000 $65.000 $85.000 $578.000 $137.500 $75.263 $65.000 $40.000 $71.500 $68.500 $130.410 $80.000 $77.000
ELIM EXT PM & MRKS (WORD)
EA 1.000 $65.000 $65.000 $85.000 $578.000 $137.500 $75.263 $60.000 $60.000 $71.500 $68.500 $130.410 $80.000 $77.000
PAV SURF PREP FOR MRK (24")
LF 564.000 $1.000 $0.550 $0.500 $6.000 $2.750 $0.636 $0.550 $5.000 $0.610 $0.550 $2.610 $0.700 $1.000
PAV SURF PREP FOR MRK (ARROW)
EA 1.000 $17.000 $10.000 $13.000 $578.000 $66.000 $11.579 $15.300 $18.000 $11.000 $10.500 $62.600 $12.000 $12.000
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 8.000 $20.000 $5.000 $6.500 $289.000 $22.000 $5.789 $15.000 $12.000 $5.500 $5.250 $20.870 $6.500 $6.000
INSTALL HWY TRF SIG (ISOLATED)
EA 1.000 $43,000.000 $47,586.060 $62,364.500 $55,039.000 $52,344.600 $55,100.100 $52,650.000 $55,000.000 $56,207.800 $52,875.000 $53,310.540 $57,000.000 $55,900.000
REMOVING TRAFFIC SIGNALS
EA 1.000 $8,700.000 $4,374.080 $5,732.500 $5,059.000 $4,811.400 $5,064.765 $6,600.000 $5,000.000 $11,000.000 $4,860.000 $10,433.000 $5,500.000 $5,200.000
VEH SIG SEC (12")LED(GRN)
EA 8.000 $370.000 $429.100 $562.500 $496.000 $473.000 $496.868 $296.000 $550.000 $421.300 $475.000 $399.580 $510.000 $505.000
VEH SIG SEC (12")LED(GRN ARW)
EA 2.000 $370.000 $436.170 $571.500 $504.000 $473.000 $505.043 $298.000 $550.000 $426.800 $485.000 $399.590 $510.000 $513.000
VEH SIG SEC (12")LED(YEL)
EA 10.000 $370.000 $429.110 $562.500 $496.000 $473.000 $496.868 $296.000 $550.000 $421.300 $475.000 $399.580 $510.000 $505.000
VEH SIG SEC (12")LED(YEL ARW)
EA 2.000 $370.000 $436.170 $571.500 $504.000 $473.000 $505.043 $310.000 $550.000 $426.800 $485.000 $399.590 $510.000 $513.000
VEH SIG SEC (12")LED(RED)
EA 8.000 $370.000 $429.100 $562.500 $496.000 $473.000 $496.856 $300.000 $550.000 $421.300 $475.000 $399.580 $510.000 $505.000
VEH SIG SEC (12")LED(RED ARW)
EA 1.000 $370.000 $437.110 $573.000 $506.000 $473.000 $506.131 $300.000 $550.000 $426.800 $485.000 $399.580 $510.000 $513.000
PED SIG SEC (LED)(COUNTDOWN)
EA 2.000 $1,150.000 $935.210 $1,225.500 $1,082.000 $104.500 $1,082.883 $808.000 $1,100.000 $1,002.100 $1,040.000 $950.450 $1,200.000 $1,100.000
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 7.000 $220.000 $246.520 $323.000 $285.000 $270.600 $285.446 $200.000 $300.000 $206.800 $275.000 $196.140 $300.000 $290.000
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
EA 2.000 $275.000 $260.650 $341.500 $301.000 $286.000 $301.807 $255.000 $325.000 $235.400 $290.000 $223.270 $300.000 $306.000
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 285.000 $3.200 $3.200 $4.000 $4.000 $3.520 $3.705 $1.800 $4.000 $2.430 $3.500 $2.310 $4.000 $4.000
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
LF 215.000 $4.500 $5.010 $6.500 $6.000 $5.510 $5.801 $2.620 $6.000 $3.180 $5.500 $3.020 $6.000 $6.000
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 395.000 $2.500 $6.490 $8.500 $8.000 $7.140 $7.514 $3.140 $8.000 $3.910 $7.250 $3.700 $7.500 $8.000
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 1.000 $8,300.000 $10,587.840 $13,876.000 $12,247.000 $11,645.700 $12,259.704 $9,285.000 $13,000.000 $6,248.000 $11,764.000 $5,925.940 $13,000.000 $12,432.000
PED POLE ASSEMBLY
EA 1.000 $2,000.000 $2,083.830 $2,731.000 $2,410.000 $2,291.300 $2,412.875 $2,974.000 $2,500.000 $4,277.900 $2,315.000 $4,057.390 $2,500.000 $2,450.000
PED DETECT PUSH BUTTON (APS)
EA 2.000 $1,600.000 $1,350.500 $1,770.000 $1,562.000 $1,485.000 $1,563.749 $1,033.000 $1,500.000 $990.000 $1,500.000 $938.970 $1,750.000 $1,560.000
PED DETECTOR CONTROLLER UNIT
EA 1.000 $4,670.000 $4,017.570 $5,265.500 $4,646.000 $4,418.700 $4,651.961 $3,810.000 $5,000.000 $5,005.000 $4,464.000 $4,747.020 $5,000.000 $4,720.000
INSTL VID IMAGE VEH DET SYS (VIVDS)
EA 1.000 $24,500.000 $20,963.790 $27,474.500 $24,247.000 $23,059.300 $24,274.061 $6,358.000 $25,000.000 $18,832.000 $23,500.000 $17,861.300 $26,000.000 $24,620.000
VIVDS CABLE (INSTALL)
LF 705.000 $0.500 $3.800 $5.000 $5.000 $4.180 $4.400 $1.500 $4.750 $1.300 $4.250 $1.230 $4.750 $5.000
VIVDS CAMERA (INSTALL)
EA 3.000 $31,500.000 $1,458.030 $1,911.000 $1,686.000 $1,603.800 $1,688.259 $429.900 $1,800.000 $2,079.000 $1,620.000 $1,971.840 $1,900.000 $1,712.000
REMOVE ROADWAY ILLUM ASSEMBLY (LED)
EA 4.000 $1,000.000 $546.770 $716.500 $632.000 $602.800 $633.107 $1,151.400 $650.000 $1,292.500 $600.000 $1,225.880 $675.000 $642.000
SPOT TREE TRIMMING / BRUSH REMOVAL
LF 510.000 $31.850 $6.000 $12.500 $77.000 $1.100 $11.255 $55.500 $9.000 $9.080 $12.000 $8.610 $15.000 $11.000
TREE REMOVAL (4" - 12" DIA)
EA 8.000 $300.000 $300.000 $14.000 $420.000 $60.500 $1,042.113 $225.000 $1,000.000 $990.000 $2,000.000 $938.970 $900.000 $1,200.000
GROUND BOX (PREPARE)
EA 4.000 $1,000.000 $352.570 $462.000 $408.000 $387.200 $408.242 $305.000 $400.000 $605.000 $390.000 $312.990 $450.000 $415.000
Totals: $2,835,173.670 $2,192,971.750 $2,231,704.000 $2,296,745.500 $2,365,287.788 $2,470,594.699 $2,518,586.866 $2,677,525.150 $2,791,150.740 $2,828,006.450 $3,268,724.845 $3,496,935.050 $3,699,479.800
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $4,200.00
Total: $5,200.00