CONCHO CS (0907-15-006)

Items: 44

County: CONCHO
Length: N/A
Highway: CS
District: SAN ANGELO
Control Number: 0907-15-006
DBE Goal: N/A
Project: STP 2017(287)TAPS
Guaranty: N/A
Time: 72 WORKING DAYS
Engineer's Estimate: $612,546.00
Date: 04/03/2019 (7 years ago)
Contract Number: N/A
Type: PEDESTRIAN IMPROVEMENTS-SIDEWALKS AND LIGHTING
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$612,546.00
$676,560.00
Over/Under Est: 10.45% $64,014.00
$688,305.50
Over/Under Est: 12.37% $75,759.50
Amt Left: 1.74% $11,745.50
Over/Under Est: 31.2% $191,104.00
Amt Left: 18.78% $127,090.00
Delta: -16.76% -$115,344.50

Bid Items & Bid Tabulations

44 Total 0 of 44
CONCHO  |  CS  |  SAN ANGELO  |  0907-15-006  |  04/03/2019  |  $612,546.00  |  STP 2017(287)TAPS  |  PEDESTRIAN IMPRVS-SIDEWALKS AND LIGH...  |  72 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ENCINO LANDSCAPE, INC.
RELMCO, INC.
FNH CONSTRUCTION, LLC
REMOVING CONC (PAV)
SY 245.000 $20.000 $20.000 $40.000 $30.000
REMOVING CONC (SIDEWALKS)
SY 930.000 $15.000 $20.000 $40.000 $30.000
REMOVING CONC (DRIVEWAYS)
SY 30.000 $15.000 $20.000 $40.000 $30.000
REMOVING CONC (CURB AND GUTTER)
LF 200.000 $5.000 $5.000 $40.000 $20.000
REMOVING CONC (MISC)
SY 15.000 $20.000 $20.000 $40.000 $30.000
REMOVING CONC (WHEELCHAIR RAMP)
SY 70.000 $15.000 $20.000 $40.000 $50.000
CONC PVMT (JOINTED - CPCD) (8")
SY 245.000 $200.000 $200.000 $110.000 $125.000
DRILL SHAFT (24 IN)
LF 120.000 $240.000 $280.000 $247.250 $185.000
RAIL (HANDRAIL)(TY A)
LF 160.000 $200.000 $200.000 $150.000 $185.000
RAIL (HANDRAIL)(TY W)
LF 10.000 $200.000 $200.000 $150.000 $250.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 5.000 $500.000 $500.000 $1,100.000 $750.000
MOBILIZATION
LS 1.000 $100,000.000 $100,000.000 $70,000.000 $75,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $4,000.000 $4,000.000 $5,500.000 $8,500.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 20.000 $5.000 $5.000 $30.000 $15.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 20.000 $1.000 $1.000 $30.000 $9.000
CONC CURB (TY II)
LF 30.000 $20.000 $20.000 $100.000 $25.000
CONC CURB & GUTTER (TY I)
LF 115.000 $35.000 $35.000 $45.000 $35.000
CONC CURB & GUTTER (TY II)
LF 1,035.000 $35.000 $35.000 $45.000 $35.000
DRIVEWAYS (CONC)
SY 35.000 $70.000 $100.000 $85.000 $85.000
CONC SIDEWALKS (4")
SY 140.000 $50.000 $70.000 $50.000 $65.000
CONC SIDEWALKS (6")
SY 980.000 $70.000 $80.000 $60.000 $85.000
CURB RAMPS (TY 2)
EA 2.000 $2,000.000 $2,000.000 $1,400.000 $2,000.000
CURB RAMPS (TY 5)
EA 2.000 $2,000.000 $2,000.000 $1,500.000 $2,000.000
CURB RAMPS (TY 21)
EA 1.000 $3,000.000 $3,000.000 $1,800.000 $2,000.000
CURB RAMPS (SPECIAL)
SY 56.000 $100.000 $150.000 $1,800.000 $200.000
CONDT (PVC) (SCH 40) (1")
LF 350.000 $20.000 $20.000 $19.550 $15.000
CONDT (PVC) (SCH 40) (2")
LF 1,100.000 $22.000 $25.000 $20.700 $18.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 215.000 $60.000 $60.000 $57.500 $40.000
ELEC CONDR (NO.12) BARE
LF 160.000 $1.000 $2.000 $1.150 $4.000
ELEC CONDR (NO.12) INSULATED
LF 3,320.000 $1.100 $2.000 $1.150 $3.000
ELEC CONDR (NO.10) INSULATED
LF 3,970.000 $1.200 $2.000 $1.200 $4.000
ELEC CONDR (NO.8) BARE
LF 1,500.000 $1.200 $2.000 $1.260 $4.000
GROUND BOX TY A (122311)
EA 2.000 $750.000 $1,500.000 $1,150.000 $950.000
ELC SRV TY D 120/240 150(NS)AL(E)SF(U)
EA 1.000 $7,500.000 $10,000.000 $8,050.000 $6,500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 9.000 $600.000 $600.000 $540.500 $850.000
PREFAB PAV MRK TY B (W)(4")(SLD)
LF 2,305.000 $10.000 $10.000 $9.200 $8.000
PRE PM TY B (ACC PRK)(BLU)(SYMBOL ONLY)
EA 7.000 $700.000 $700.000 $747.500 $1,000.000
REMOVAL OF CONCRETE FOUNDATIONS
EA 7.000 $840.000 $850.000 $805.000 $1,500.000
REMOVE LUMINAIRE POLE
EA 11.000 $600.000 $1,200.000 $977.500 $1,500.000
LANDSCAPE AMENITY (TY 1)
EA 15.000 $6,000.000 $7,000.000 $5,750.000 $15,000.000
LANDSCAPE AMENITY (TY 2)
EA 1.000 $2,500.000 $4,500.000 $4,485.000 $15,000.000
LANDSCAPE AMENITY (TY 3)
EA 1.000 $4,500.000 $1,600.000 $1,495.000 $7,500.000
PRECAST CONCRETE WHEEL STOPS
EA 58.000 $200.000 $200.000 $105.000 $200.000
REMOVE CONDUCTOR
LF 1,010.000 $7.000 $9.000 $6.900 $10.000
Totals: $612,546.000 $676,560.000 $688,305.500 $803,650.000