Show Job Controls
Bid Cobra

CONCHO US 83 (0035-04-035)

Items: 52

County: CONCHO
Length: N/A
Highway: US 83
District: SAN ANGELO
Control Number: 0035-04-035
DBE Goal: N/A
Project: STP 2018(066)HES
Guaranty: N/A
Time: 209 WORKING DAYS
Engineer's Estimate: $1,571,642.68
Date: 09/07/2017 (8 years ago)
Contract Number: N/A
Type: SAFETY TREAT FIXED OBJECTS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$1,571,642.68
$1,472,270.45
Over/Under Est: -6.32% -$99,372.23
$1,996,803.70
Over/Under Est: 27.05% $425,161.02
Amt Left: 35.63% $524,533.25
$2,076,325.40
Over/Under Est: 32.11% $504,682.72
Amt Left: 41.03% $604,054.95
Delta: -3.98% -$79,521.70
Over/Under Est: 32.81% $515,646.22
Amt Left: 41.77% $615,018.45
Delta: -0.53% -$10,963.50
$2,548,583.00
Over/Under Est: 62.16% $976,940.32
Amt Left: 73.11% $1,076,312.55
Delta: -22.10% -$461,294.10

Bid Items & Bid Tabulations

52 Total 0 of 52
CONCHO  |  US 83  |  SAN ANGELO  |  0035-04-035  |  09/07/2017  |  $1,571,642.68  |  STP 2018(066)HES  |  SAFETY TREAT FIXED OBJECTS  |  209 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
L.C. JORDAN & SON
GILVIN-TERRILL, LTD.
FNH CONSTRUCTION, LLC
CHAMPION INFRASTRUCTURE, LLC
CONTRACT PAVING CO.
REMOVING CONC (MISC)
SY 8.000 $425.000 $200.000 $50.000 $1,000.000 $260.000 $2,000.000
REMOVING CONCRETE(MOW STRIP)
LF 250.000 $10.000 $15.000 $50.000 $30.000 $20.000 $9.500
FURNISHING AND PLACING TOPSOIL (3")
SY 460.000 $1.250 $10.000 $40.000 $20.000 $20.000 $50.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 460.000 $0.200 $3.000 $40.000 $5.000 $4.000 $10.000
CL C CONC (RAIL FOUNDATION)
CY 5.600 $1,750.000 $2,500.000 $7,000.000 $2,000.000 $2,400.000 $2,000.000
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 16.000 $372.000 $1,000.000 $300.000 $1,500.000 $650.000 $5,000.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 66.000 $310.000 $190.000 $300.000 $1,500.000 $210.000 $1,000.000
RIPRAP (CONC)(5 IN)
CY 68.100 $1,086.310 $600.000 $2,500.000 $650.000 $900.000 $1,000.000
RIPRAP (MOW STRIP)(4 IN)
CY 12.200 $1,200.000 $1,200.000 $2,500.000 $750.000 $900.000 $937.500
RAIL (TY T221)
LF 20.000 $70.000 $220.000 $750.000 $210.000 $310.000 $1,800.000
RAIL (TY SSTR)
LF 20.000 $45.000 $220.000 $750.000 $210.000 $280.000 $1,000.000
RETROFIT RAIL (TY T221)
LF 193.340 $200.000 $275.000 $250.000 $210.000 $340.000 $2,000.000
RETROFIT RAIL (TY SSTR)
LF 674.660 $150.000 $275.000 $250.000 $210.000 $300.000 $5.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1) (C)
EA 26.000 $4,200.000 $4,250.000 $10,000.000 $5,000.000 $7,000.000 $725.000
SET (TY I)(S= 5 FT)(HW= 5 FT)(3:1) (C)
EA 8.000 $6,875.000 $6,200.000 $11,000.000 $6,500.000 $8,000.000 $1,272.500
SET (TY I)(S= 6 FT)(HW= 5 FT)(3:1) (C)
EA 6.000 $8,700.000 $6,500.000 $12,000.000 $13,000.000 $9,000.000 $1,725.000
SET (TY I)(S= 7 FT)(HW= 4 FT)(3:1) (C)
EA 6.000 $6,000.000 $5,500.000 $12,500.000 $20,000.000 $11,000.000 $50,000.000
SET (TY I)(S= 8 FT)(HW= 5 FT)(3:1) (C)
EA 4.000 $7,000.000 $10,500.000 $13,500.000 $25,000.000 $12,000.000 $70,000.000
REMOVE STR (RAIL)
LF 237.400 $50.000 $50.000 $50.000 $50.000 $60.000 $10.000
MOBILIZATION
LS 1.000 $143,000.000 $150,000.000 $125,000.000 $200,000.000 $180,000.000 $215,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $8,000.000 $7,500.000 $5,000.000 $12,500.000 $6,700.000 $7,000.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 844.000 $5.500 $12.000 $10.000 $20.000 $40.000 $20.000
PTB (FUR & INST)(STEEL)
LF 300.000 $225.000 $200.000 $75.000 $75.000 $390.000 $100.000
PTB (MOVE)(STEEL)
LF 1,500.000 $25.000 $25.000 $20.000 $25.000 $120.000 $50.000
PTB (STKPL)(STEEL)
LF 300.000 $37.500 $25.000 $20.000 $25.000 $120.000 $50.000
CONCRETE CURB (SPECIAL)
LF 170.240 $25.000 $30.000 $200.000 $55.000 $100.000 $100.000
MTL W-BEAM GD FEN (STEEL POST)
LF 9,141.050 $38.170 $22.000 $29.000 $40.000 $24.000 $21.200
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 14.000 $2,549.870 $2,000.000 $2,500.000 $2,100.000 $2,400.000 $1,951.350
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 8.000 $1,011.580 $1,000.000 $2,000.000 $1,850.000 $1,800.000 $1,106.300
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 87.500 $17.740 $22.000 $25.000 $45.000 $30.000 $21.270
MTL BM GD FEN TRANS (NON - SYM)
EA 2.000 $815.790 $1,000.000 $1,500.000 $1,850.000 $1,600.000 $927.200
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 297.250 $45.000 $65.000 $75.000 $70.000 $78.000 $58.400
REMOVE METAL BEAM GUARD FENCE
LF 2,561.200 $7.040 $2.000 $5.000 $3.500 $8.000 $2.400
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 2.000 $300.000 $220.000 $330.000 $500.000 $600.000 $265.000
GUARDRAIL END TREATMENT (INSTALL)
EA 44.000 $2,734.050 $2,200.000 $3,500.000 $3,000.000 $3,600.000 $2,486.250
CRASH CUSH ATTEN (MOVE & RESET)
EA 8.000 $2,583.910 $3,000.000 $1,000.000 $5,000.000 $3,800.000 $2,250.000
CRASH CUSH ATTEN (STKPL)
EA 2.000 $3,500.000 $3,500.000 $2,000.000 $2,500.000 $3,800.000 $9,500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $11,228.490 $12,000.000 $7,000.000 $13,500.000 $16,000.000 $54,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 40.000 $30.000 $30.000 $25.000 $100.000 $30.000 $23.930
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 18.000 $44.140 $30.000 $25.000 $100.000 $30.000 $21.430
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 362.000 $30.000 $30.000 $25.000 $100.000 $30.000 $21.430
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BR)
EA 32.000 $30.000 $30.000 $25.000 $100.000 $30.000 $21.330
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 52.000 $93.580 $150.000 $150.000 $150.000 $200.000 $183.090
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 6,980.000 $1.020 $0.850 $1.250 $1.500 $1.200 $4.250
WK ZN PAV MRK REMOV (W)36"(YLD TRI)
EA 16.000 $35.000 $60.500 $12.000 $250.000 $80.000 $231.250
RE PM W/RET REQ TY II (W) 4" (SLD)
LF 6,980.000 $0.250 $0.650 $0.480 $0.600 $1.000 $1.500
RE PM W/RET REQ TY II (Y) 4" (BRK)
LF 880.000 $0.250 $0.800 $0.480 $0.600 $1.200 $1.800
REFL PAV MRKR TY II-A-A
EA 45.000 $4.000 $27.500 $15.000 $20.000 $40.000 $10.000
ELIM EXT PAV MRK & MRKS (4")
LF 880.000 $0.450 $3.300 $0.890 $1.000 $6.000 $7.250
ELIM EXT PV MRK & MRKS (RUMBLE STRIP)
LF 80.000 $1.500 $5.500 $2.500 $5.000 $10.000 $12.500
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 126.000 $167.600 $150.000 $175.000 $150.000 $120.000 $1,250.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 80.000 $15.000 $25.000 $14.500 $30.000 $30.000 $125.000
Totals: $1,571,642.678 $1,472,270.450 $1,996,803.700 $2,076,325.400 $2,087,288.900 $2,548,583.005