Show Job Controls
Bid Cobra

CONCHO US 83 (0035-03-047)

Items: 124

County: CONCHO
Length: 0.7150 MILES
Highway: US 83
District: SAN ANGELO
Control Number: 0035-03-047
DBE Goal: 0.0%
Project: F 2B24(364)
Guaranty: $100,000.00
Time: 289 WORKING DAYS
Engineer's Estimate: $9,625,756.35
Date: 11/07/2024 (1 year ago)
Contract Number: 11243209
Type: GRADING, BASE, PAVING, STORM SEWER, TRAFFIC SIGNAL
Project ID: A00070553
Project Description: WIDENING NON-FREEWAY CONSISTING OF GRADING, BASE, PAVING STRUCTURES, SIGNALS, PAVEMENT MARKINGS
Mail/Deliver Bids To: N/A
JESUS GARCIA9
RANDY BAIZA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$9,625,756.35
1
$14,120,524.72
Over/Under Est: 46.7% $4,494,768.37
$14,822,635.30
Over/Under Est: 53.99% $5,196,878.95
Amt Left: 4.97% $702,110.58
$16,913,435.61
Over/Under Est: 75.71% $7,287,679.26
Amt Left: 19.78% $2,792,910.89
Delta: -14.11% -$2,090,800.31
Subcontractor Percentage Amount
REXCON ENTERPRISES, LLC 25.51% $3,823,270.64
ALLEN KELLER COMPANY 13.45% $2,015,797.34
TEXAS EROSION CONTROL SERVICES 2.04% $305,741.75
DORAN STEEL, INC. 1.67% $250,288.59
VACA UNDERGROUND UTILITIES INC 1.67% $250,288.59
D. I. J. CONSTRUCTION, INC. 1.44% $215,817.71
SPS ENERGY SERVICES, LLC 0.92% $137,883.54
AWP SAFETY 0.31% $46,460.76
TRITEX FENCE 0.22% $32,972.15
FC TRAFFIC CONTROL, INC. 0.22% $32,972.15
BUYERS BARRICADES AUSTIN, LLC 0.17% $25,478.48
WEST TEXAS ROCK RESOURCES, LLC 0.05% $7,493.67
TEX-SAFE SOLUTIONS 0.02% $2,997.47
Total: 47.69% $7,147,462.84

Bid Items & Bid Tabulations

124 Total 0 of 124
CONCHO  |  US 83  |  SAN ANGELO  |  0035-03-047  |  11/07/2024  |  $9,625,756.35  |  F 2B24(364)  |  GRADING, BASE, PAVING, STORM SEWER,...  |  289 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
3LW CIVIL LLC
CK NEWBERRY, LLC
REECE ALBERT, INC.
PREPARING ROW
STA 38.900 $1,500.000 $8,852.080 $1,500.000 $775.670
REMOVING CONC (FOUNDATIONS)
SY 9.000 $50.000 $485.640 $245.000 $812.460
REMOVING CONC (SIDEWALKS)
SY 456.200 $25.000 $36.750 $40.000 $48.730
REMOVING CONC (DRIVEWAYS)
SY 945.200 $35.000 $32.200 $40.000 $48.890
REMOVING CONC (CURB)
LF 1,177.400 $12.000 $10.820 $20.000 $18.630
REMOVING CONC (CURB AND GUTTER)
LF 285.200 $20.000 $30.750 $45.000 $25.640
REMOVING CONC (MISC)
SY 237.300 $30.000 $54.120 $40.000 $97.370
REMOV STAB BASE AND ASPH PAV (10"-18")
SY 28,703.700 $4.000 $17.880 $20.000 $26.070
EXCAVATION (ROADWAY)
CY 10,977.200 $10.000 $41.280 $35.000 $28.300
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 50.300 $20.000 $108.900 $115.000 $101.340
FURNISH AND PLACE TOPSOIL (5")
SY 3,523.000 $4.000 $16.730 $10.000 $18.230
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 3,523.000 $0.550 $1.380 $2.250 $3.070
CELL FBR MLCH SEED(TEMP)(WARM)
SY 1,761.500 $0.600 $2.050 $2.000 $3.070
CELL FBR MLCH SEED(TEMP)(COOL)
SY 1,761.500 $0.700 $2.050 $2.000 $3.070
VEGETATIVE WATERING
MG 21.100 $15.000 $240.000 $85.000 $98.750
PROOF ROLLING
HR 39.500 $180.000 $97.240 $105.000 $201.720
PLANE ASPH CONC PAV(0" TO 2")
SY 4,274.300 $5.000 $7.080 $8.000 $9.340
CONC PVMT (CONT REINF-CRCP) (HES)(12")
SY 24,368.500 $160.000 $182.850 $200.000 $256.900
CEM STABIL BKFL
CY 290.000 $250.000 $303.600 $475.000 $453.710
FLOWABLE BACKFILL
CY 30.000 $250.000 $346.310 $325.000 $455.120
TRENCH EXCAVATION PROTECTION
LF 4,393.000 $5.000 $2.840 $35.000 $18.530
DRILL SHAFT (24 IN)
LF 30.000 $150.000 $360.000 $575.000 $567.620
DRILL SHAFT (TRF SIG POLE) (30 IN)
LF 11.000 $300.000 $420.000 $800.000 $794.670
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 36.000 $250.000 $480.000 $900.000 $908.200
CL A CONC (PLUG)
EA 2.000 $660.000 $610.520 $2,500.000 $5,892.260
RIPRAP (CONC)(5 IN)
CY 52.700 $450.000 $690.650 $1,000.000 $1,066.080
CONC BOX CULV (5 FT X 2 FT)
LF 725.000 $700.000 $1,095.790 $650.000 $722.440
RC PIPE (CL III)(24 IN)
LF 1,269.000 $100.000 $381.080 $205.000 $476.410
RC PIPE (CL III)(36 IN)
LF 642.000 $190.000 $643.520 $340.000 $553.590
RC PIPE (CL III)(42 IN)
LF 1,755.000 $220.000 $686.530 $415.000 $474.020
MANH (COMPL)(PRM)(72IN)
EA 25.000 $15,000.000 $11,774.240 $8,750.000 $15,132.430
INLET (COMPL)(PCO)(5FT)(NONE)
EA 5.000 $8,200.000 $8,286.320 $9,500.000 $16,944.570
INLET (COMPL)(PCO)(5FT)(LEFT)
EA 6.000 $9,000.000 $9,375.050 $10,000.000 $16,619.140
INLET (COMPL)(PCO)(5FT)(RIGHT)
EA 5.000 $9,000.000 $9,408.320 $9,500.000 $17,107.700
INLET (COMPL)(PCO)(5FT)(BOTH)
EA 11.000 $14,000.000 $10,521.010 $15,000.000 $18,383.470
INLET (COMPL)(PSL)(SH)(8FTX8FT-3FTX3FT)
EA 4.000 $25,000.000 $28,132.500 $25,000.000 $31,863.290
INLET (COMPL)(PSL)(FG)(5FTX5FT-3FTX5FT)
EA 2.000 $13,500.000 $13,859.770 $15,000.000 $19,364.490
INLET(COMPL)(PAZD)(FG)(4FTX4FT-4FTX4FT)
EA 2.000 $11,500.000 $9,986.240 $15,000.000 $17,993.290
ADJUSTING MANHOLES
EA 1.000 $800.000 $2,667.720 $5,000.000 $14,694.600
ADJUSTING MANHOLES (SANITARY)
EA 3.000 $900.000 $2,123.100 $2,000.000 $6,499.570
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 2.000 $500.000 $1,442.320 $2,500.000 $1,922.550
REMOV STR (INLET)
EA 1.000 $1,500.000 $1,273.860 $2,000.000 $5,464.670
REMOV STR (SMALL FENCE)
LF 54.000 $8.000 $18.000 $40.000 $100.940
MOBILIZATION
LS 1.000 $877,396.490 $1,165,931.030 $1,400,000.000 $1,437,570.380
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 16.000 $9,000.000 $2,720.110 $45,000.000 $20,928.440
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 888.000 $75.000 $21.600 $20.000 $38.580
CONSTRUCTION EXITS (REMOVE)
SY 888.000 $10.000 $10.800 $12.000 $23.820
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,123.000 $6.000 $2.520 $7.000 $2.380
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,123.000 $2.000 $1.200 $2.000 $1.140
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 549.000 $2.000 $6.000 $10.000 $5.680
BIODEG EROSN CONT LOGS (REMOVE)
LF 549.000 $0.500 $1.440 $2.000 $1.360
CONSTRUCTING DETOURS
SY 200.000 $150.000 $255.940 $225.000 $319.750
CONC CURB (TY II)
LF 104.100 $50.000 $30.000 $70.000 $128.180
CONC CURB (MONO) (TY II)
LF 6,110.900 $30.000 $13.200 $45.000 $13.290
DRIVEWAYS (CONC)
SY 3,387.700 $100.000 $87.680 $145.000 $170.630
CONC SIDEWALKS (5")
SY 2,287.700 $65.000 $85.850 $125.000 $182.130
CURB RAMPS (TY 1)
EA 10.000 $2,000.000 $2,410.370 $3,000.000 $3,325.370
CURB RAMPS (TY 5)
EA 3.000 $2,200.000 $3,031.550 $3,000.000 $4,458.800
CURB RAMPS (TY 10)
EA 79.000 $2,100.000 $2,131.580 $3,000.000 $2,448.630
CURB RAMPS (TY 21)
EA 8.000 $2,050.000 $2,111.750 $3,000.000 $3,133.300
RUMBLE STRIPS (CENTERLINE) CONCRETE
LF 434.000 $5.000 $20.750 $20.000 $19.620
CHAIN LINK FENCE (REMOVE)
LF 92.000 $12.000 $14.400 $25.000 $13.620
MAILBOX INSTALL-S (TWG-POST) TY 1
EA 3.000 $120.000 $342.000 $325.000 $300.840
MAILBOX INSTALL-D (TWG-POST) TY 1
EA 2.000 $150.000 $378.000 $375.000 $385.990
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 1.000 $250.000 $594.000 $550.000 $810.570
CONDT (PVC) (SCH 80) (3")
LF 325.000 $36.000 $30.000 $45.000 $45.410
CONDT (PVC) (SCH 80) (4") (BORE)
LF 240.000 $45.000 $48.000 $75.000 $73.790
ELEC CONDR (NO.8) BARE
LF 665.000 $1.500 $3.500 $3.000 $2.840
ELEC CONDR (NO.8) INSULATED
LF 30.000 $1.600 $3.600 $3.000 $3.410
TRAY CABLE (4 CONDR) (12 AWG)
LF 945.000 $2.000 $4.800 $7.000 $6.810
GROUND BOX TY D (162922)
EA 9.000 $1,000.000 $1,800.000 $3,000.000 $2,838.110
REMOVE ELECTRICAL SERVICES
EA 1.000 $500.000 $1,080.000 $1,200.000 $1,135.250
ELC SRV TY D 120/240 060(NS)SS(E)PS(U)
EA 1.000 $4,000.000 $12,000.000 $15,000.000 $14,758.200
ALUMINUM SIGNS (TY A)
SF 40.000 $25.000 $28.200 $25.000 $45.410
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 49.000 $500.000 $846.000 $805.000 $909.330
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 4.000 $700.000 $960.000 $915.000 $1,080.760
REMOVE SM RD SN SUP&AM
EA 67.000 $80.000 $132.000 $125.000 $129.670
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 6,126.000 $0.450 $1.200 $1.150 $0.790
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 57,613.000 $0.500 $0.840 $0.750 $0.740
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 144.000 $10.000 $18.000 $20.000 $17.030
WK ZN PAV MRK REMOV (Y)6"(BRK)
LF 2,213.000 $0.450 $1.200 $1.250 $0.790
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 76,637.000 $0.500 $0.840 $0.750 $0.740
PAVEMENT SEALER 6"
LF 48,693.000 $0.300 $0.360 $0.400 $0.510
PAVEMENT SEALER 24"
LF 545.000 $1.000 $4.800 $5.000 $4.540
PAVEMENT SEALER (DBL ARROW)
EA 8.000 $20.000 $150.000 $145.000 $28.380
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
LF 6,126.000 $0.750 $0.960 $1.000 $0.930
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 20,687.000 $0.780 $0.920 $0.800 $0.850
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
LF 1,380.000 $0.760 $0.960 $1.000 $0.930
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 20,500.000 $0.800 $0.920 $0.800 $0.850
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 545.000 $15.000 $18.000 $20.000 $28.380
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 8.000 $260.000 $600.000 $575.000 $510.860
REFL PAV MRKR TY I-C
EA 307.000 $4.000 $7.200 $7.000 $7.380
REFL PAV MRKR TY II-A-A
EA 328.000 $5.000 $7.200 $7.000 $7.380
ELIM EXT PAV MRK & MRKS (4")
LF 38,738.000 $0.180 $0.900 $1.000 $0.510
ELIM EXT PAV MRK & MRKS (24")
LF 257.000 $0.800 $6.000 $7.000 $3.970
PAV SURF PREP FOR MRK (6")
LF 48,693.000 $0.200 $0.360 $0.400 $0.510
PAV SURF PREP FOR MRK (24")
LF 545.000 $2.000 $4.800 $5.000 $2.270
PAV SURF PREP FOR MRK (DBL ARROW)
EA 8.000 $12.000 $150.000 $145.000 $22.710
REMOVING TRAFFIC SIGNALS
EA 1.000 $3,000.000 $9,000.000 $30,000.000 $28,381.150
INS HY TRF SIG (DPT SUP CNT & CAB)(ISO)
EA 1.000 $14,900.000 $30,000.000 $75,000.000 $68,114.750
VEH SIG SEC (12")LED(GRN)
EA 8.000 $300.000 $540.000 $550.000 $510.860
VEH SIG SEC (12")LED(YEL)
EA 8.000 $250.000 $540.000 $550.000 $510.860
VEH SIG SEC (12")LED(RED)
EA 8.000 $360.000 $540.000 $550.000 $510.860
PED SIG SEC (LED)(COUNTDOWN)
EA 8.000 $520.000 $1,140.000 $1,500.000 $1,646.110
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 8.000 $110.000 $390.000 $275.000 $283.810
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 3,481.000 $3.500 $5.700 $10.000 $8.800
INS TRF SIG PL AM(S)1 ARM(32')LUM
EA 1.000 $13,000.000 $15,600.000 $30,000.000 $27,245.900
INS TRF SIG PL AM(S)1 ARM(36')LUM
EA 1.000 $18,000.000 $18,000.000 $32,000.000 $28,381.150
INS TRF SIG PL AM(S)1 ARM(40')LUM
EA 1.000 $18,000.000 $19,200.000 $30,000.000 $30,084.020
INS TRF SIG PL AM(S)1 ARM(44')LUM
EA 1.000 $18,500.000 $21,000.000 $35,000.000 $32,354.510
PED POLE ASSEMBLY
EA 5.000 $2,200.000 $3,600.000 $4,000.000 $3,973.360
PED DETECT PUSH BUTTON (APS)
EA 8.000 $900.000 $1,320.000 $2,000.000 $1,702.870
PED DETECTOR CONTROLLER UNIT
EA 1.000 $2,600.000 $6,000.000 $7,500.000 $7,379.100
TREE REMOVAL (36" - 42" DIA)
EA 2.000 $1,400.000 $4,020.000 $25,000.000 $4,704.990
TREE PROTECTION
EA 6.000 $1,000.000 $250.030 $550.000 $967.630
D-GR HMA TY-B SAC-B PG70-22
TON 5,587.800 $110.000 $238.610 $220.000 $202.870
SP MIXES SP-C SAC-A PG70-22
TON 235.100 $130.000 $573.000 $425.000 $560.130
TACK COAT
GAL 342.500 $4.000 $18.780 $20.000 $6.910
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $5,000.000 $12,000.000 $15,000.000 $29,596.810
TMA (STATIONARY)
DAY 277.000 $400.000 $360.000 $375.000 $326.170
TMA (MOBILE OPERATION)
HR 304.000 $100.000 $90.000 $80.000 $142.070
VIVDS CABLING
LF 940.000 $3.500 $4.200 $7.000 $5.680
VIVDS PROSR SYS (RELOCATE)
EA 1.000 $1,600.000 $1,440.000 $2,500.000 $2,270.490
VIVDS CAM ASSY (RELOCATE)
EA 5.000 $800.000 $300.000 $2,500.000 $2,270.490
Totals: $9,625,756.340 $14,120,524.791 $14,822,635.300 $16,913,435.697