|
|
PREPARING ROW
|
STA
|
321.000
|
$2,000.000
|
$650.000
|
$950.000
|
$1,600.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
30,136.000
|
$10.000
|
$15.500
|
$17.500
|
$30.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
45.000
|
$10.000
|
$42.000
|
$55.000
|
$150.000
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
1,145.000
|
$40.000
|
$30.000
|
$30.000
|
$100.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY A)
|
CY
|
12,337.000
|
$15.000
|
$15.500
|
$18.500
|
$30.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
82,800.000
|
$0.500
|
$0.230
|
$0.220
|
$0.300
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
41,400.000
|
$0.500
|
$0.190
|
$0.170
|
$0.300
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
41,400.000
|
$0.500
|
$0.190
|
$0.170
|
$0.300
|
|
|
VEGETATIVE WATERING
|
MG
|
1,859.000
|
$10.000
|
$17.000
|
$10.000
|
$20.000
|
|
|
PROOF ROLLING
|
HR
|
40.000
|
$200.000
|
$135.000
|
$80.000
|
$100.000
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
39,266.000
|
$48.000
|
$57.000
|
$73.000
|
$90.000
|
|
|
CM TRT(PT MX)(CL L)(TY C)(GR 3)(FN POS)
|
CY
|
103.000
|
$50.000
|
$200.000
|
$380.000
|
$400.000
|
|
|
EMULS ASPH (BS OR SUBGR TRT)(AE-P)
|
GAL
|
32,012.000
|
$5.000
|
$4.850
|
$4.000
|
$4.600
|
|
|
AGGR(TY-B GR-3 SAC-B)
|
CY
|
1,256.000
|
$150.000
|
$123.500
|
$130.000
|
$140.000
|
|
|
ASPH (CRS-2 OR CRS-2H OR CRS2P)
|
GAL
|
55,486.000
|
$4.000
|
$4.750
|
$4.700
|
$5.000
|
|
|
HMCL ACP TY-F SAC-B AC-1.5
|
TON
|
44.000
|
$500.000
|
$230.000
|
$700.000
|
$200.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
199.000
|
$175.000
|
$210.000
|
$380.000
|
$325.000
|
|
|
CL C CONC (CULV)
|
CY
|
19.700
|
$2,200.000
|
$2,695.000
|
$1,356.000
|
$1,000.000
|
|
|
CL C CONC (WINGWALLS)
|
CY
|
57.900
|
$2,200.000
|
$2,695.000
|
$1,552.000
|
$1,000.000
|
|
|
CL C CONC (CURB)
|
CY
|
1.300
|
$2,200.000
|
$2,695.000
|
$1,569.000
|
$1,000.000
|
|
|
CL C CONC (CULV)(EXTEND)
|
CY
|
19.300
|
$2,200.000
|
$2,695.000
|
$1,346.000
|
$1,000.000
|
|
|
CL S CONC (CULV)(EXTEND)
|
CY
|
9.900
|
$2,750.000
|
$2,887.500
|
$1,120.000
|
$1,000.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
24.100
|
$650.000
|
$764.500
|
$836.000
|
$1,400.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
53.000
|
$300.000
|
$115.000
|
$289.000
|
$250.000
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
74.000
|
$300.000
|
$115.000
|
$350.000
|
$275.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
40.000
|
$650.000
|
$770.000
|
$800.000
|
$850.000
|
|
|
RAIL (TY T631)
|
LF
|
144.000
|
$150.000
|
$89.100
|
$116.000
|
$200.000
|
|
|
WATERPROOFING (TY 10)
|
SY
|
20.000
|
$150.000
|
$165.000
|
$218.000
|
$200.000
|
|
|
GABIONS (3' X 3')(GALV)
|
CY
|
100.000
|
$220.000
|
$495.000
|
$397.000
|
$500.000
|
|
|
CMP AR (GAL STL DES 3)
|
LF
|
1,209.000
|
$100.000
|
$76.000
|
$125.000
|
$100.000
|
|
|
CMP AR (GAL STL DES 4)
|
LF
|
71.000
|
$125.000
|
$83.000
|
$153.000
|
$125.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
135.000
|
$275.000
|
$96.000
|
$188.000
|
$225.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
144.000
|
$230.000
|
$125.000
|
$226.000
|
$235.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
208.000
|
$300.000
|
$185.000
|
$280.000
|
$275.000
|
|
|
SET (TY I)(S=3 FT)(HW= 4 FT)(3:1)(C)
|
EA
|
3.000
|
$6,000.000
|
$17,930.000
|
$14,300.000
|
$19,000.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
2.000
|
$10,000.000
|
$18,590.000
|
$41,000.000
|
$14,500.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
2.000
|
$13,000.000
|
$19,250.000
|
$13,500.000
|
$17,000.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 5 FT)(3:1) (C)
|
EA
|
2.000
|
$13,000.000
|
$20,570.000
|
$13,500.000
|
$20,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 5 FT)(3:1) (C)
|
EA
|
5.000
|
$17,500.000
|
$23,540.000
|
$17,500.000
|
$18,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 6 FT)(3:1) (C)
|
EA
|
3.000
|
$17,500.000
|
$28,930.000
|
$22,000.000
|
$21,000.000
|
|
|
SET (TY I)(S= 7 FT)(HW= 7 FT)(3:1) (C)
|
EA
|
2.000
|
$18,000.000
|
$34,540.000
|
$24,000.000
|
$20,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$3,000.000
|
$1,900.000
|
$2,070.000
|
$1,600.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$3,000.000
|
$2,100.000
|
$2,445.000
|
$1,600.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$4,500.000
|
$2,500.000
|
$3,800.000
|
$2,300.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
5.000
|
$4,500.000
|
$2,800.000
|
$3,055.000
|
$3,500.000
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
5.000
|
$4,500.000
|
$2,950.000
|
$3,600.000
|
$3,500.000
|
|
|
SET (TY II) (DES 3) (CMP) (6: 1) (P)
|
EA
|
68.000
|
$2,000.000
|
$2,750.000
|
$2,340.000
|
$2,300.000
|
|
|
SET (TY II) (DES 4) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$3,200.000
|
$3,000.000
|
$3,815.000
|
$3,200.000
|
|
|
REMOV STR (PIPE)
|
EA
|
23.000
|
$300.000
|
$775.000
|
$680.000
|
$850.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$688,270.700
|
$725,000.000
|
$970,000.000
|
$1,050,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
13.000
|
$10,000.000
|
$19,050.000
|
$19,000.000
|
$10,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
220.000
|
$75.000
|
$52.000
|
$52.000
|
$45.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
400.000
|
$75.000
|
$54.500
|
$56.000
|
$50.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
620.000
|
$22.000
|
$16.400
|
$16.000
|
$22.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
7,056.000
|
$6.000
|
$4.600
|
$7.000
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
7,056.000
|
$1.500
|
$1.150
|
$1.100
|
$0.550
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
2,672.000
|
$6.000
|
$7.300
|
$7.500
|
$7.500
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,672.000
|
$1.500
|
$1.120
|
$1.100
|
$1.250
|
|
|
ONE-WAY TRAFFIC CONTROL (PORT TRAF SIG)
|
DAY
|
70.000
|
$900.000
|
$240.000
|
$300.000
|
$350.000
|
|
|
CONC CURB (MOD) (TYPE I)
|
LF
|
737.000
|
$28.000
|
$56.500
|
$70.000
|
$50.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
2,649.000
|
$40.000
|
$25.000
|
$35.000
|
$45.000
|
|
|
TURNOUTS (ACP)
|
SY
|
104.000
|
$60.000
|
$60.500
|
$150.000
|
$45.000
|
|
|
INTERSECTIONS (ACP) (TYPE 1)
|
SY
|
1,553.000
|
$40.000
|
$53.250
|
$70.000
|
$55.000
|
|
|
INTERSECTIONS (ACP) (TYPE 2)
|
SY
|
3,665.000
|
$75.000
|
$91.000
|
$82.000
|
$60.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
62,670.000
|
$0.400
|
$0.130
|
$0.280
|
$0.250
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
30,980.000
|
$0.400
|
$0.130
|
$0.280
|
$0.250
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
400.000
|
$42.000
|
$27.500
|
$25.000
|
$30.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,500.000
|
$3,245.000
|
$3,350.000
|
$3,800.000
|
|
|
WIRE FENCE (TY C)
|
LF
|
75.000
|
$50.000
|
$52.000
|
$100.000
|
$25.000
|
|
|
PIPE UNDERDRAINS (TY 7) (6")
|
LF
|
1,000.000
|
$90.000
|
$45.000
|
$55.000
|
$70.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
7.000
|
$300.000
|
$275.000
|
$285.000
|
$275.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
7.000
|
$1,000.000
|
$748.000
|
$775.000
|
$750.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$1,000.000
|
$1,210.000
|
$1,250.000
|
$1,200.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
|
EA
|
2.000
|
$1,000.000
|
$1,210.000
|
$1,250.000
|
$1,200.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
48.000
|
$700.000
|
$605.000
|
$625.000
|
$600.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
10.000
|
$900.000
|
$676.500
|
$700.000
|
$675.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
68.000
|
$100.000
|
$110.000
|
$110.000
|
$110.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
15.000
|
$50.000
|
$26.400
|
$60.000
|
$35.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
|
EA
|
32.000
|
$75.000
|
$99.000
|
$100.000
|
$100.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
1,320.000
|
$1.700
|
$1.210
|
$1.250
|
$1.200
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
24.000
|
$10.000
|
$13.200
|
$13.500
|
$12.500
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
3,200.000
|
$1.700
|
$1.210
|
$1.250
|
$1.200
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
80.000
|
$10.000
|
$6.600
|
$6.800
|
$7.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
6,416.000
|
$1.500
|
$1.500
|
$1.750
|
$1.500
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
134.000
|
$12.000
|
$15.400
|
$16.000
|
$15.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
63,270.000
|
$0.500
|
$0.680
|
$0.700
|
$0.700
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
4,768.000
|
$0.500
|
$0.700
|
$0.730
|
$0.700
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
41,648.000
|
$0.500
|
$0.690
|
$0.720
|
$0.700
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
760.000
|
$7.000
|
$5.340
|
$5.500
|
$5.250
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
860.000
|
$2.000
|
$2.530
|
$2.600
|
$2.500
|
|
|
RELOCT RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
1.000
|
$8,000.000
|
$7,600.000
|
$9,700.000
|
$7,500.000
|
|
|
SP MIXES SP-D SAC-B PG76-22
|
TON
|
9,671.000
|
$100.000
|
$163.000
|
$155.000
|
$150.000
|
|
|
BONDING COURSE
|
GAL
|
14,939.000
|
$5.000
|
$0.010
|
$4.000
|
$6.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
442.000
|
$100.000
|
$93.500
|
$110.000
|
$125.000
|
|
|
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
|
LF
|
440.000
|
$10.000
|
$9.500
|
$9.000
|
$10.000
|
|
|
TMA (STATIONARY)
|
DAY
|
150.000
|
$200.000
|
$203.500
|
$100.000
|
$300.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
160.000
|
$50.000
|
$22.000
|
$50.000
|
$100.000
|
|
Totals: |
$7,845,147.700
|
$8,679,973.300
|
$9,768,319.800
|
$11,100,640.700
|