Show Job Controls
Bid Cobra

COMANCHE CR (0923-17-079)

Items: 37

County: COMANCHE
Length: N/A
Highway: CR
District: BROWNWOOD
Control Number: 0923-17-079
DBE Goal: N/A
Project: BR 2020(699)
Guaranty: N/A
Time: 203 WORKING DAYS
Engineer's Estimate: $932,084.70
Date: 06/04/2020 (6 years ago)
Contract Number: N/A
Type: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$932,084.70
$939,512.41
Over/Under Est: 0.8% $7,427.71
Over/Under Est: 1.15% $10,733.10
Amt Left: 0.35% $3,305.39
$954,994.95
Over/Under Est: 2.46% $22,910.25
Amt Left: 1.65% $15,482.54
Delta: -1.29% -$12,177.15
Over/Under Est: 16.28% $151,720.69
Amt Left: 15.36% $144,292.98
Delta: -13.49% -$128,810.44
$1,191,762.20
Over/Under Est: 27.86% $259,677.50
Amt Left: 26.85% $252,249.79
Delta: -9.96% -$107,956.81
Over/Under Est: 44.39% $413,798.91
Amt Left: 43.25% $406,371.20
Delta: -12.93% -$154,121.41

Bid Items & Bid Tabulations

37 Total 0 of 37
COMANCHE  |  CR  |  BROWNWOOD  |  0923-17-079  |  06/04/2020  |  $932,084.70  |  BR 2020(699)  |  REPLACE BRIDGE AND APPROACHES  |  203 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
KNIFE RIVER CORPORATION - SOUTH
HODGES AND SON CONSTRUCTION COMPANY, INC.
PIERCE R & B LLC
PROJECT ALLIED RESOURCES, LLC
FNH CONSTRUCTION, LLC
JAMES CONSTRUCTION GROUP, L.L.C.
PREPARING ROW
STA 11.700 $3,000.000 $2,650.000 $3,800.000 $2,500.000 $2,070.000 $7,000.000 $11,000.000
EXCAVATION (ROADWAY)
CY 714.000 $15.000 $19.000 $15.000 $14.000 $32.500 $20.000 $6.290
EXCAVATION (CHANNEL)
CY 688.000 $15.000 $17.000 $15.000 $14.000 $39.100 $35.000 $4.420
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 191.000 $32.000 $16.000 $20.000 $26.000 $37.900 $35.000 $38.210
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 1,179.000 $1.500 $2.540 $3.000 $2.750 $4.650 $1.000 $1.450
BROADCAST SEED (TEMP) (WARM)
SY 589.000 $1.500 $1.000 $2.000 $2.250 $0.420 $1.000 $1.450
BROADCAST SEED (TEMP) (COOL)
SY 589.000 $1.500 $1.000 $2.000 $2.250 $0.420 $1.000 $1.450
VEGETATIVE WATERING
MG 53.000 $50.000 $25.000 $1.000 $25.000 $80.000 $50.000 $35.000
SOIL RETENTION BLANKETS (CL 2) (TY G)
SY 1,050.000 $5.000 $3.000 $4.000 $3.250 $5.300 $6.500 $1.500
FL BS (CMP IN PLC)(TY D GR 3)(FNAL POS)
CY 573.000 $80.000 $69.000 $90.000 $74.000 $125.000 $60.000 $78.710
CEM STABIL BKFL
CY 102.000 $215.000 $210.000 $250.000 $270.000 $249.000 $300.000 $238.180
DRILL SHAFT (24 IN)
LF 726.000 $220.000 $230.000 $180.000 $242.500 $263.000 $265.000 $284.020
CORE HOLE
EA 6.000 $200.000 $600.000 $400.000 $200.000 $1,350.000 $500.000 $400.000
CL C CONC (ABUT)
CY 60.800 $1,000.000 $1,250.000 $1,200.000 $1,300.000 $1,260.000 $900.000 $1,233.140
REINF CONC SLAB (SLAB BEAM)
SF 3,250.000 $20.000 $30.000 $25.000 $26.000 $23.000 $20.000 $50.000
PRESTR CONC SLAB BEAM (5SB12)
LF 394.910 $200.000 $200.000 $190.000 $178.000 $176.000 $185.000 $232.500
PRESTR CONC SLAB BEAM (5SB15)
LF 222.410 $220.000 $200.000 $190.000 $207.000 $176.000 $185.000 $246.650
RAIL (TY T223)
LF 322.000 $120.000 $119.000 $130.000 $125.000 $215.000 $150.000 $266.450
GABION MATTRESSES (GALV)(12 IN)
SY 168.000 $170.000 $125.000 $90.000 $195.000 $149.000 $185.000 $215.210
GABIONS (3' X 3')(GALV)
CY 238.000 $250.000 $235.000 $300.000 $305.000 $410.000 $300.000 $369.450
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 3.000 $15,000.000 $15,000.000 $15,000.000 $8,000.000 $19,000.000 $40,000.000 $29,600.000
MOBILIZATION
LS 1.000 $84,000.000 $93,000.000 $90,000.000 $90,000.000 $48,100.000 $120,000.000 $130,110.300
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $2,500.000 $1,000.000 $2,500.000 $2,250.000 $2,630.000 $5,000.000 $1,046.250
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 64.000 $60.000 $50.000 $5.000 $38.000 $69.000 $30.000 $41.880
ROCK FILTER DAMS (REMOVE)
LF 64.000 $15.000 $10.000 $1.000 $10.000 $14.300 $15.000 $9.740
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,801.000 $5.000 $4.750 $4.000 $3.750 $5.700 $4.000 $3.260
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,801.000 $2.000 $1.000 $1.000 $1.100 $1.660 $2.000 $1.680
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 300.000 $8.000 $6.000 $8.000 $6.000 $15.200 $18.000 $6.620
BIODEG EROSN CONT LOGS (REMOVE)
LF 300.000 $2.000 $1.000 $5.000 $1.100 $3.370 $9.000 $1.920
MTL W-BEAM GD FEN (STEEL POST)
LF 275.000 $32.000 $23.000 $30.000 $23.400 $26.900 $35.000 $28.000
MTL BEAM GD FEN TRANS (TL2)
EA 12.000 $1,500.000 $900.000 $1,200.000 $895.000 $1,450.000 $1,850.000 $1,500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $2,500.000 $2,600.000 $2,600.000 $2,600.000 $2,870.000 $2,850.000 $3,200.000
WIRE FENCE (TY C)
LF 668.000 $15.000 $13.500 $20.000 $15.000 $17.700 $20.000 $13.000
WIRE FENCE (WATER GAP)
LF 57.000 $20.000 $42.000 $90.000 $45.000 $76.000 $20.000 $40.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 18.000 $35.000 $25.000 $50.000 $29.000 $31.600 $100.000 $35.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 2.000 $24.000 $25.000 $1.000 $50.000 $28.600 $100.000 $150.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 36.000 $35.000 $35.000 $50.000 $37.000 $47.600 $100.000 $35.000
Totals: $932,084.700 $939,512.410 $942,817.800 $954,994.950 $1,083,805.390 $1,191,762.200 $1,345,883.604