|
|
REMOV CONC (MEDIANS)
|
SY
|
100.000
|
$30.000
|
$30.000
|
$1.000
|
|
|
REMOV CONC (CURB)
|
LF
|
100.000
|
$17.000
|
$5.500
|
$1.000
|
|
|
REMOV CONC (FOUNDATIONS)
|
CY
|
20.000
|
$357.000
|
$275.000
|
$1.000
|
|
|
REMOV CONC (MISC)
|
SY
|
225.000
|
$60.000
|
$100.000
|
$50.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
100.000
|
$350.000
|
$110.000
|
$62.500
|
|
|
CLASS K CONCRETE (MISC)
|
CY
|
100.000
|
$500.000
|
$110.000
|
$140.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
100.000
|
$245.000
|
$330.000
|
$290.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
50.000
|
$425.000
|
$380.000
|
$290.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
50.000
|
$500.000
|
$550.000
|
$420.000
|
|
|
MOBILIZATION (CALLOUT)
|
EA
|
275.000
|
$1,500.000
|
$1.000
|
$2,000.000
|
|
|
MOBILIZATION (EMERGENCY)
|
EA
|
50.000
|
$500.000
|
$1.000
|
$500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
75.000
|
$200.000
|
$1.000
|
$1.000
|
|
|
TMA (STATIONARY)
|
DAY
|
2,000.000
|
$150.000
|
$1.000
|
$0.010
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
3,500.000
|
$25.000
|
$1.000
|
$80.000
|
|
|
CONC CURB (TY II)
|
LF
|
50.000
|
$45.000
|
$55.000
|
$6.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
100.000
|
$60.000
|
$55.000
|
$47.500
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
6,500.000
|
$32.000
|
$33.000
|
$13.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
100.000
|
$35.000
|
$1.000
|
$17.000
|
|
|
MTL THRIE-BEAM GD FEN (TIM POST)
|
LF
|
180.000
|
$70.000
|
$55.000
|
$55.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
25.000
|
$1,500.000
|
$1,560.000
|
$750.000
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
10.000
|
$1,100.000
|
$1.000
|
$1,100.000
|
|
|
MTL BM GD FEN TRANS (ANCHOR PLATE)
|
EA
|
10.000
|
$550.000
|
$1.000
|
$1,275.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
6,600.000
|
$6.000
|
$5.500
|
$5.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
6.000
|
$550.000
|
$555.000
|
$145.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
5.000
|
$450.000
|
$555.000
|
$150.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
15.000
|
$3,000.000
|
$4,500.000
|
$2,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
18.000
|
$400.000
|
$225.000
|
$1.000
|
|
|
CHAIN LINK FENCE (INSTALL) (6')
|
LF
|
200.000
|
$24.000
|
$1.000
|
$24.000
|
|
|
CHAIN LINK FENCE (REPAIR) (6')
|
LF
|
100.000
|
$16.000
|
$1.000
|
$16.000
|
|
|
CHAIN LINK FENCE (INSTALL) (4')
|
LF
|
425.000
|
$30.000
|
$1.000
|
$20.000
|
|
|
CHAIN LINK FENCE (REPAIR) (4')
|
LF
|
200.000
|
$20.000
|
$1.000
|
$13.500
|
|
|
CHAIN LINK FENCE (REMOVE)
|
LF
|
450.000
|
$6.500
|
$1.000
|
$1.000
|
|
|
GATE (INSTALL)(6'X4')
|
EA
|
4.000
|
$750.000
|
$1.000
|
$1.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
|
EA
|
50.000
|
$35.000
|
$28.000
|
$35.000
|
|
|
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
|
EA
|
55.000
|
$35.000
|
$28.000
|
$35.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
20.000
|
$35.000
|
$1.000
|
$35.000
|
|
|
POTHOLE REPAIR(STANDARD)(0"-5" DEEP)
|
SY
|
100.000
|
$150.000
|
$110.000
|
$300.000
|
|
|
POTHOLE REPAIR(STANDARD)(5"-10" DEEP)
|
SY
|
100.000
|
$160.000
|
$110.000
|
$1.000
|
|
|
POTHOLE REPAIR (SAW - CUT)
|
TON
|
50.000
|
$175.000
|
$550.000
|
$200.000
|
|
|
EMERGENCY MOBILIZATION
|
EA
|
50.000
|
$250.000
|
$100.000
|
$1.000
|
|
|
SPOT MOWING
|
AC
|
250.000
|
$65.000
|
$55.000
|
$55.000
|
|
|
FULL - WIDTH MOWING
|
AC
|
19,134.000
|
$57.000
|
$55.000
|
$55.500
|
|
|
LITTER REMOVAL
|
AC
|
42,624.000
|
$13.000
|
$10.000
|
$13.000
|
|
|
LITTER REMOVAL (SPOT)
|
AC
|
200.000
|
$70.000
|
$100.000
|
$13.000
|
|
|
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
|
MI
|
2,203.000
|
$65.000
|
$180.000
|
$150.000
|
|
|
DEBRIS REMOVAL (ENTRANCE/EXIT RAMPS)
|
MI
|
896.000
|
$65.000
|
$180.000
|
$150.000
|
|
|
DRIFTWOOD REMOVAL
|
CY
|
270.000
|
$50.000
|
$110.000
|
$80.500
|
|
|
DEBRIS REMOVAL (SPOT DEBRIS)
|
MI
|
300.000
|
$200.000
|
$200.000
|
$50.000
|
|
|
CLEANING / SWEEPING (CENTER MEDIAN)
|
MI
|
735.000
|
$200.000
|
$200.000
|
$210.000
|
|
|
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
|
MI
|
735.000
|
$200.000
|
$200.000
|
$210.000
|
|
|
CLEANING / SWEEPING (FRONTAGE ROAD)
|
MI
|
735.000
|
$200.000
|
$200.000
|
$210.000
|
|
|
CLEANING / SWEEPING(ENTRANCE/EXIT RAMP)
|
MI
|
299.000
|
$200.000
|
$200.000
|
$210.000
|
|
|
CLEANING / SWEEPING (AGGREGATE REMOVAL)
|
MI
|
100.000
|
$175.000
|
$150.000
|
$75.000
|
|
|
CLEANING / SWEEPING (SPOT)
|
MI
|
50.000
|
$200.000
|
$210.000
|
$310.000
|
|
|
CLEANING / SWEEPING (HANDWORK)
|
SY
|
10,000.000
|
$5.000
|
$5.500
|
$3.000
|
|
|
GRAFFITI REMOVAL (PAINTING)
|
SF
|
385.000
|
$2.500
|
$3.500
|
$3.000
|
|
|
SPOT TREE TRIMMING / BRUSH REMOVAL
|
LF
|
5,000.000
|
$25.000
|
$15.000
|
$13.000
|
|
|
DRAIN INLET CLEANING
|
EA
|
125.000
|
$220.000
|
$200.000
|
$180.000
|
|
|
STORM SEWER CLEANING (PIPE)(12"-18"DIA)
|
LF
|
500.000
|
$9.000
|
$6.000
|
$9.000
|
|
|
STORM SEWER CLEANING (PIPE)(19"-24"DIA)
|
LF
|
500.000
|
$8.000
|
$10.000
|
$12.000
|
|
|
SLOTTED DRAIN CLEANING
|
LF
|
1,000.000
|
$14.000
|
$20.000
|
$30.000
|
|
|
REPLACE RAIL ELEMENT (W-BEAM)
|
LF
|
2,000.000
|
$25.000
|
$45.000
|
$34.000
|
|
|
REPLACE RAIL ELEMENT (THRIE-BEAM)
|
LF
|
40.000
|
$50.000
|
$112.000
|
$20.000
|
|
|
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
|
EA
|
10.000
|
$42.000
|
$560.000
|
$40.000
|
|
|
REPLACE TIMBER POST W/O CONC FND
|
EA
|
50.000
|
$65.000
|
$330.000
|
$250.000
|
|
|
REPLACE STEEL POST W/O CONC FND
|
EA
|
75.000
|
$75.000
|
$110.000
|
$1.000
|
|
|
REPLACE TIMBER POST W/ CONC FND
|
EA
|
50.000
|
$82.000
|
$330.000
|
$1.000
|
|
|
REPLACE STEEL POST W/ CONC FND
|
EA
|
75.000
|
$92.000
|
$110.000
|
$1.000
|
|
|
REALIGN POSTS
|
EA
|
500.000
|
$30.000
|
$11.000
|
$5.000
|
|
|
REPAIR OF TERMINAL ANCHORS POSTS
|
EA
|
5.000
|
$80.000
|
$1.000
|
$250.000
|
|
|
REPLACE TERMINAL ANCHOR POSTS
|
EA
|
5.000
|
$100.000
|
$1.000
|
$200.000
|
|
|
REM OBSOLETE GET & REPL W/ SGT
|
EA
|
20.000
|
$4,000.000
|
$3,800.000
|
$4,000.000
|
|
|
REPL SINGLE GDRAIL TERM IMPACT HEAD
|
EA
|
10.000
|
$1,100.000
|
$1,300.000
|
$1,150.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL RAIL
|
LF
|
1,050.000
|
$30.000
|
$35.000
|
$80.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL POST
|
EA
|
500.000
|
$85.000
|
$1.000
|
$1.000
|
|
|
REPAIR STEEL POST WITH BASE PLATE
|
EA
|
10.000
|
$125.000
|
$280.000
|
$440.000
|
|
|
RESET SGT IMPACT HEAD
|
EA
|
10.000
|
$250.000
|
$550.000
|
$205.000
|
|
|
REPLACE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
20.000
|
$1,100.000
|
$1,300.000
|
$100.000
|
|
|
REPAIR RAIL ELEMENT (CURVED RAIL)
|
LF
|
800.000
|
$38.000
|
$28.000
|
$35.000
|
|
|
REALIGN EXISTING RAIL
|
LF
|
200.000
|
$9.000
|
$11.000
|
$7.000
|
|
|
REPLACE CRT POST (WOOD)
|
EA
|
200.000
|
$70.000
|
$1.000
|
$1.000
|
|
|
REPLACE SINGLE GDRAIL TERM POST (WOOD)
|
EA
|
10.000
|
$55.000
|
$350.000
|
$150.000
|
|
|
REPLACE SINGLE GDRAIL TERM POST (STEEL)
|
EA
|
60.000
|
$85.000
|
$350.000
|
$200.000
|
|
|
POST AND CABLE FENCE (REMOVAL)
|
LF
|
400.000
|
$5.000
|
$11.000
|
$1.000
|
|
|
POST AND CABLE FENCE (REMV CONC ANCHOR)
|
EA
|
5.000
|
$140.000
|
$1.000
|
$1.000
|
|
|
POST AND CABLE FENCE (NEW INSTALLATION)
|
LF
|
500.000
|
$28.000
|
$28.000
|
$1.000
|
|
|
POST AND CABLE FENCE (NEW CONC ANCHOR)
|
EA
|
15.000
|
$300.000
|
$1.000
|
$1.000
|
|
|
POST AND CABLE FENCE(REMV / REPL POSTS)
|
EA
|
100.000
|
$70.000
|
$112.000
|
$1.000
|
|
|
POST AND CABLE FENCE(RMV/REPL CNC ANCH)
|
EA
|
10.000
|
$120.000
|
$1.000
|
$1.000
|
|
|
POST AND CABLE FENCE (REMV/ REPL CABLE)
|
LF
|
150.000
|
$10.000
|
$28.000
|
$1.000
|
|
|
POST AND CABLE FENCE (REPAIR)
|
LF
|
3,000.000
|
$10.000
|
$12.000
|
$1.000
|
|
|
REPLACE (SMTC) WIDE
|
EA
|
3.000
|
$30,000.000
|
$20,000.000
|
$18,000.000
|
|
|
REPAIR (SMTC) WIDE
|
LF
|
130.000
|
$300.000
|
$330.000
|
$450.000
|
|
|
REPAIR (REACT)(M)
|
LF
|
50.000
|
$100.000
|
$445.000
|
$162.500
|
|
|
REPLACE (REACT) WIDE
|
EA
|
2.000
|
$30,000.000
|
$1.000
|
$1.000
|
|
|
REPAIR (NARROW QUAD)
|
LF
|
150.000
|
$450.000
|
$1.000
|
$120.000
|
|
|
REPAIR (WIDE QUAD)
|
LF
|
100.000
|
$500.000
|
$450.000
|
$500.000
|
|
|
REPLACE (TAU-M) NARROW
|
EA
|
4.000
|
$35,000.000
|
$30,000.000
|
$21,000.000
|
|
|
REPAIR (TAU-M) NARROW
|
LF
|
150.000
|
$400.000
|
$550.000
|
$500.000
|
|
|
REPLACE (TAU II) WIDE
|
EA
|
2.000
|
$35,000.000
|
$1.000
|
$1.000
|
|
|
REPAIR (TAU II) WIDE
|
LF
|
100.000
|
$400.000
|
$550.000
|
$1.000
|
|
|
REPLACE (INDIVIDUAL SAND BARREL)
|
EA
|
225.000
|
$525.000
|
$1.000
|
$300.000
|
|
|
REPAIR (REACT)(N)
|
LF
|
100.000
|
$300.000
|
$1.000
|
$50.000
|
|
|
REPAIR (REACT)(N)(CYLINDER ONLY)
|
EA
|
6.000
|
$5,000.000
|
$1.000
|
$100.000
|
|
|
REPAIR (REACT)(W)(CYLINDER ONLY)
|
EA
|
5.000
|
$5,000.000
|
$1.000
|
$1.000
|
|
|
REPAIR (REACT)(M)(CYLINDER ONLY)
|
EA
|
5.000
|
$5,000.000
|
$5,000.000
|
$1.000
|
|
|
REPAIR (QUAD)(N)(M)
|
LF
|
50.000
|
$400.000
|
$400.000
|
$225.000
|
|
|
REPLACE (QUAD)(N)(M)
|
EA
|
2.000
|
$30,000.000
|
$25,000.000
|
$12,500.000
|
|
|
REPLACE CRASH CUSH ATTEN (L)(N)(TL3)
|
EA
|
2.000
|
$28,000.000
|
$40,000.000
|
$27,000.000
|
|
|
REPLACE CRASH CUSH ATTEN (R)(N)(TL3)
|
EA
|
3.000
|
$35,000.000
|
$25,000.000
|
$22,500.000
|
|
|
REPLACE CRASH CUSH ATTEN (R)(W)(TL3)
|
EA
|
3.000
|
$38,000.000
|
$1.000
|
$1.000
|
|
|
REPLACE CRASH CUSH ATTEN (R)(N)(TL2)
|
EA
|
2.000
|
$26,000.000
|
$1.000
|
$22,000.000
|
|
|
REPAIR (STEEL PED. RAIL)
|
LF
|
200.000
|
$100.000
|
$1.000
|
$420.000
|
|
|
REPAIR (STL PIPE PED RAIL)(PR1)
|
LF
|
200.000
|
$104.000
|
$1.000
|
$345.000
|
|
|
REPLACE(STEEL RAIL)
|
LF
|
100.000
|
$75.000
|
$1.000
|
$1.000
|
|
|
PERM CONC TRF BARRIER REPAIR (F SHAPE)
|
LF
|
100.000
|
$150.000
|
$100.000
|
$400.000
|
|
|
PERM CONC TRF BARRIER REPLACE (F SHAPE)
|
LF
|
100.000
|
$225.000
|
$200.000
|
$1.000
|
|
|
PERM CONC TRF BARR REPAIR(SINGLE SLOPE)
|
LF
|
100.000
|
$150.000
|
$100.000
|
$195.000
|
|
|
PERM CONC TRF BARR REPL(SINGLE SLOPE)
|
LF
|
100.000
|
$225.000
|
$200.000
|
$1.000
|
|
|
CONCRETE RAIL REPAIR (IN-KIND)
|
LF
|
150.000
|
$200.000
|
$200.000
|
$300.000
|
|
|
CONCRETE RAIL REPLACEMENT (IN-KIND)
|
LF
|
150.000
|
$250.000
|
$1.000
|
$1.000
|
|
|
REM/REPLACE CURB GUIDANCE SYSTEM
|
EA
|
50.000
|
$250.000
|
$165.000
|
$200.000
|
|
|
REM REPLACE CURB
|
EA
|
50.000
|
$175.000
|
$1.000
|
$1.000
|
|
|
REM/REPLACE VISION STRIP
|
EA
|
50.000
|
$100.000
|
$1.000
|
$1.000
|
|
|
REM/REPLACE CURB TRANS END SECTION
|
EA
|
10.000
|
$140.000
|
$60.000
|
$1.000
|
|
|
REM/REPLACE DELINEATOR POST ASSEMBLY
|
EA
|
700.000
|
$55.000
|
$160.000
|
$40.000
|
|
|
INCIDENT MANAGEMENT (TYPE A)
|
HR
|
100.000
|
$150.000
|
$10.000
|
$1.000
|
|
|
INCIDENT MANAGEMENT (TYPE B)
|
HR
|
100.000
|
$150.000
|
$10.000
|
$1.000
|
|
|
INCIDENT MANAGEMENT (TYPE C)
|
HR
|
100.000
|
$1,150.000
|
$10.000
|
$1.000
|
|
|
INCIDENT MANAGEMENT (TYPE D)
|
HR
|
100.000
|
$175.000
|
$10.000
|
$1.000
|
|
|
INCIDENT MANAGEMENT (TYPE E)
|
HR
|
100.000
|
$250.000
|
$10.000
|
$1.000
|
|
|
INCIDENT MANAGEMENT (TYPE F)
|
HR
|
50.000
|
$150.000
|
$100.000
|
$1.000
|
|
|
INCIDENT MANAGEMENT (TYPE G)
|
HR
|
50.000
|
$100.000
|
$10.000
|
$1.000
|
|
|
INCIDENT MANAGEMENT (TYPE H)
|
HR
|
50.000
|
$100.000
|
$100.000
|
$1.000
|
|
|
INCIDENT MANAGEMENT (TYPE I)
|
HR
|
50.000
|
$175.000
|
$10.000
|
$1.000
|
|
|
INCIDENT MANAGMENT (TYPE J)
|
HR
|
50.000
|
$50.000
|
$10.000
|
$1.000
|
|
|
REPAIR LARGE RDSD SIGN SUPT & ASSEM
|
EA
|
25.000
|
$800.000
|
$1,700.000
|
$1,000.000
|
|
|
RELOCATE LARGE RDSD SIGN SUPT & ASSEM
|
EA
|
20.000
|
$100.000
|
$1.000
|
$1.000
|
|
|
REPLACE LARGE RDSD SIGN SUPT & ASSEM
|
EA
|
100.000
|
$1,100.000
|
$550.000
|
$1,200.000
|
|
|
REMOVE LARGE RDSD SIGN SUPT & ASSEM
|
EA
|
100.000
|
$65.000
|
$1.000
|
$1.000
|
|
|
REPAIR SMALL RDSD SIGN SUPT & ASSEM
|
EA
|
275.000
|
$350.000
|
$380.000
|
$500.000
|
|
|
RELOCATE SMALL RDSD SIGN SUPT & ASSEM
|
EA
|
25.000
|
$150.000
|
$1.000
|
$1.000
|
|
|
REPLACE SMALL RDSD SIGN SUPT & ASSEM
|
EA
|
150.000
|
$425.000
|
$600.000
|
$500.000
|
|
|
REMOVE SMALL RDSD SIGN SUPT & ASSEM
|
EA
|
25.000
|
$125.000
|
$1.000
|
$1.000
|
|
|
SNOW AND ICE CONTROL (TRUCK)
|
HR
|
500.000
|
$95.000
|
$80.000
|
$1.000
|
|
|
SNOW AND ICE CONTROL (SHADOW VEHICLE)
|
HR
|
500.000
|
$75.000
|
$80.000
|
$50.000
|
|
|
SNOW AND ICE CONTROL (SPRAY RIG)
|
HR
|
500.000
|
$85.000
|
$80.000
|
$125.000
|
|
|
SNOW AND ICE CONTROL SEASON
|
MO
|
15.000
|
$100,000.000
|
$50,000.000
|
$50,000.000
|
|
|
SITE INSPECTION AND CLEANING
|
EA
|
210.000
|
$140.000
|
$250.000
|
$250.000
|
|
|
TRASH, DEBRIS, ADN SEDIMENT REMOVAL
|
CYC
|
29.000
|
$260.000
|
$1,650.000
|
$1,650.000
|
|
|
REPLACING FILTER CARTRIDGES
|
EA
|
4,950.000
|
$65.000
|
$40.000
|
$37.000
|
|
|
ROTATION OF FILTER CARTRIDGES
|
EA
|
685.000
|
$15.000
|
$18.000
|
$25.000
|
|
|
MOWING AND TRIMMING
|
CYC
|
65.000
|
$190.000
|
$180.000
|
$315.000
|
|
|
REPLACE BLADDER VALVE
|
EA
|
15.000
|
$165.000
|
$150.000
|
$160.000
|
|
|
REPLACE BATTERY
|
EA
|
50.000
|
$75.000
|
$60.000
|
$140.000
|
|
Totals: |
$8,636,622.500
|
$6,284,856.500
|
$6,835,613.000
|