COMAL IH0035 (6411-87-001)

Items: 153

County: COMAL
Length: N/A
Highway: IH0035
District: SAN ANTONIO
Control Number: 6411-87-001
DBE Goal: N/A
Project: RMC - 641187001
Guaranty: N/A
Time: 730 CALENDAR DAYS
Engineer's Estimate: $7,117,007.00
Date: 01/05/2023 (3 years ago)
Contract Number: N/A
Type: BUNDLED BID
Mail/Deliver Bids To: N/A
HENRY FOJTIK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (2)
E
Engineer's Estimate
$7,117,007.00
Over/Under Est: -18.76% -$1,334,926.00
Over/Under Est: -5.25% -$373,411.46
Amt Left: 16.63% $961,514.54

Bid Items & Bid Tabulations

153 Total 0 of 153
COMAL  |  IH0035  |  SAN ANTONIO  |  6411-87-001  |  01/05/2023  |  $7,117,007.00  |  RMC - 641187001  |  BUNDLED BID  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
ROY JORGENSEN ASSOCIATES, INC.
REMOVING CONC (MEDIANS)
SY 100.000 $15.000 $20.000 $71.125
REMOVING CONC (FOUNDATIONS)
CY 20.000 $350.000 $350.000 $117.250
REMOVING CONC (CURB)
LF 100.000 $10.000 $6.000 $17.650
REMOVING CONC (MISC)
SY 100.000 $30.000 $45.000 $115.313
FLOWABLE BACKFILL
CY 100.000 $300.000 $100.000 $54.731
CL K CONC (MISC)
CY 100.000 $800.000 $100.000 $150.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 50.000 $250.000 $100.000 $21.250
RIPRAP (CONC)(CL B)
CY 50.000 $550.000 $100.000 $158.514
RIPRAP (MOW STRIP)(4 IN)
CY 50.000 $575.000 $300.000 $450.000
MOBILIZATION (CALLOUT)
EA 200.000 $900.000 $1,500.000 $1,050.000
MOBILIZATION (EMERGENCY)
EA 50.000 $450.000 $500.000 $500.000
CONC CURB (TY II)
LF 50.000 $30.000 $100.000 $31.653
CONC SIDEWALKS (4")
SY 100.000 $125.000 $50.000 $36.653
MTL W-BEAM GD FEN (TIM POST)
LF 1,000.000 $35.000 $40.000 $17.027
MTL W-BEAM GD FEN (STEEL POST)
LF 100.000 $33.000 $110.000 $23.957
MTL THRIE-BEAM GD FEN (TIM POST)
LF 75.000 $85.000 $140.000 $65.807
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 25.000 $1,400.000 $1,500.000 $1,505.179
MTL BM GD FEN TRANS (NON - SYM)
EA 10.000 $1,000.000 $1,200.000 $955.179
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 10.000 $600.000 $500.000 $560.090
REMOVE METAL BEAM GUARD FENCE
LF 500.000 $5.000 $20.000 $14.000
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $566.000 $500.000 $288.450
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 10.000 $510.000 $300.000 $144.225
GUARDRAIL END TREATMENT (INSTALL)
EA 15.000 $2,800.000 $4,000.000 $4,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 15.000 $575.000 $500.000 $360.563
CHAIN LINK FENCE (INSTALL) (6')
LF 200.000 $30.000 $20.000 $14.278
CHAIN LINK FENCE (REPAIR) (6')
LF 100.000 $15.000 $20.000 $14.280
CHAIN LINK FENCE (REMOVE)
LF 1,000.000 $6.000 $10.000 $6.277
CHAIN LINK FENCE (REPAIR) (4')
LF 200.000 $12.000 $15.000 $19.250
CHN LNK FNCE GATE(PVC CTD)(INSTL)6'X4'
EA 4.000 $775.000 $715.000 $787.231
CHAIN LINK FENCE (INSTALL) (4')
LF 200.000 $20.000 $25.000 $28.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 50.000 $12.000 $30.000 $24.563
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
EA 100.000 $35.000 $30.000 $14.000
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
EA 50.000 $30.000 $35.000 $14.000
POTHOLE REPAIR (STANDARD)
SY 250.000 $140.000 $150.000 $200.000
EMERGENCY MOBILIZATION
EA 50.000 $250.000 $250.000 $500.000
FULL - WIDTH MOWING
AC 3,408.000 $57.000 $55.000 $80.750
SPOT MOWING
AC 150.000 $50.000 $55.000 $100.000
LITTER REMOVAL
AC 23,376.000 $14.000 $10.000 $21.000
LITTER REMOVAL (SPOT)
AC 100.000 $50.000 $100.000 $25.000
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
MI 2,024.000 $55.000 $150.000 $149.150
DEBRIS REMOVAL (ENTRANCE/EXIT RAMPS)
MI 712.000 $55.000 $150.000 $149.150
DEBRIS REMOVAL (SPOT DEBRIS)
MI 200.000 $35.000 $200.000 $20.000
CLEANING / SWEEPING (CENTER MEDIAN)
MI 607.200 $210.000 $190.000 $247.000
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
MI 607.200 $210.000 $190.000 $247.000
CLEANING / SWEEPING (FRONTAGE ROAD)
MI 607.200 $210.000 $190.000 $247.000
CLEANING / SWEEPING(ENTRANCE/EXIT RAMP)
MI 213.600 $210.000 $210.000 $247.000
CLEANING / SWEEPING (AGGREGATE REMOVAL)
MI 100.000 $200.000 $150.000 $275.000
CLEANING / SWEEPING (SPOT)
MI 50.000 $200.000 $210.000 $247.000
CLEANING / SWEEPING (HANDWORK)
SY 10,000.000 $3.000 $4.000 $7.500
GRAFFITI REMOVAL (PAINTING)
SF 2,500.000 $2.500 $3.000 $2.750
TREE TRIMMING AND BRUSH REMOVAL
LF 5,000.000 $16.000 $20.000 $25.000
DRAIN INLET CLEANING
EA 100.000 $170.000 $200.000 $36.630
SLOTTED DRAIN CLEANING
LF 1,000.000 $11.000 $10.000 $7.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 2,000.000 $20.000 $21.000 $24.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 20.000 $40.000 $100.000 $25.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 15.000 $45.000 $100.000 $35.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 200.000 $40.000 $30.000 $55.000
REALIGN EXISTING RAIL
LF 200.000 $13.500 $8.000 $15.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 500.000 $48.000 $50.000 $35.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 20.000 $60.000 $150.000 $70.000
REPAIR STEEL POST WITH BASE PLATE
EA 10.000 $250.000 $300.000 $550.000
REALIGN POSTS
EA 500.000 $7.500 $25.000 $8.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 1,000.000 $50.000 $26.000 $19.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 500.000 $75.000 $1.000 $30.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 5.000 $110.000 $125.000 $500.000
REPLACE TERMINAL ANCHOR POSTS
EA 5.000 $150.000 $125.000 $500.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 20.000 $4,000.000 $3,500.000 $4,500.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 20.000 $1,000.000 $1,500.000 $1,500.000
REM & RESET SGT IMPACT HEAD
EA 20.000 $230.000 $400.000 $250.000
REMOVE AND REPLACE DAT
EA 50.000 $1,350.000 $1,600.000 $1,700.000
REPAIR MTL BM GD FEN(LONG SPAN SYS)
LF 200.000 $35.000 $31.000 $15.000
REPLACE SINGLE GDRAIL TERM POST(WOOD)
EA 50.000 $150.000 $250.000 $71.750
REPLACE SINGLE GDRAIL TERM POST(STEEL)
EA 50.000 $165.000 $250.000 $350.000
REPLACE NON-SYMMETRICAL TRANSITION
EA 5.000 $350.000 $600.000 $335.000
POST AND CABLE FENCE (REMOVAL)
LF 400.000 $150.000 $3.000 $1.000
POST AND CABLE FENCE (REMV CONC ANCHOR)
EA 5.000 $185.000 $150.000 $1.000
POST AND CABLE FENCE (NEW INSTALLATION)
LF 500.000 $250.000 $25.000 $5.000
POST AND CABLE FENCE (NEW CONC ANCHOR)
EA 15.000 $200.000 $250.000 $150.000
POST AND CABLE FENCE(REMV / REPL POSTS)
EA 100.000 $300.000 $70.000 $20.000
POST AND CABLE FENCE(RMV/REPL CNC ANCH)
EA 10.000 $250.000 $250.000 $150.000
POST AND CABLE FENCE (REMV/ REPL CABLE)
LF 250.000 $2,300.000 $20.000 $1.000
POST AND CABLE FENCE (REPAIR)
LF 500.000 $4.000 $11.000 $15.000
REMOVE AND REPLACE (TRACC)
EA 2.000 $15,000.000 $1.000 $5,000.000
REMOVE AND REPLACE (WIDE TRACC)
EA 2.000 $24,000.000 $25,000.000 $5,000.000
REMOVE AND REPLACE (NARROW REACT 350)
EA 2.000 $24,000.000 $1.000 $24,657.000
REMOVE AND REPLACE (WIDE REACT 350)
EA 2.000 $40,000.000 $100.000 $38,243.750
REPAIR (TRACC)
LF 500.000 $600.000 $1.000 $450.000
REPAIR (WIDE TRACC)
LF 500.000 $300.000 $1.000 $650.000
REPAIR (REACT)
EA 5.000 $2,500.000 $5,000.000 $1,250.000
REMOVE AND REPLACE (NARROW QUAD)
EA 1.000 $22,000.000 $1.000 $5,500.000
REMOVE AND REPLACE (WIDE QUAD)
EA 2.000 $25,000.000 $32,000.000 $26,255.000
REPAIR (WIDE QUAD)
EA 5.000 $2,500.000 $1,000.000 $5,292.500
REPAIR REACT (N) (CYLINDERS)
EA 15.000 $5,600.000 $4,500.000 $3,100.000
REPAIR (QUAD) (N) (BAY)
EA 50.000 $2,000.000 $2,000.000 $2,400.000
REPAIR (QUAD) (W) (BAY)
EA 50.000 $1,500.000 $2,000.000 $1,300.000
REMOVE AND REPLACE (FASTRACC)
EA 2.000 $23,000.000 $100.000 $2,500.000
REMOVE AND REPLACE (SMTC) (W)
EA 2.000 $55,000.000 $100.000 $55,800.000
REPAIR (SMTC) (W)
EA 5.000 $3,500.000 $1,000.000 $750.000
REPAIR (VIA -SAND FILL PLASTIC BARRELS)
EA 150.000 $575.000 $500.000 $335.000
REMOVE AND REPLACE (SHORTRACC)
EA 2.000 $12,000.000 $1.000 $1,500.000
REPAIR (FASTRACC)
LF 500.000 $500.000 $1.000 $350.000
REPAIR (SHORTRACC)
LF 500.000 $500.000 $1.000 $50.000
REPAIR TAU II (W)
LF 500.000 $225.000 $1.000 $50.000
REMOVE AND REPLACE TAU II (W)
EA 2.000 $34,000.000 $1.000 $25,000.000
REMOVE AND REPLACE (QUADGUARD)(MASH)(N)
EA 2.000 $28,000.000 $1.000 $28,000.000
REPAIR (QUADGUARD)(MASH)(N)
LF 500.000 $225.000 $1.000 $600.000
REMOVE AND REPLACE (TAU)(MASH)(N)
EA 2.000 $25,000.000 $32,000.000 $28,000.000
REPAIR (TAU)(MASH)(N)
LF 500.000 $260.000 $1.000 $825.000
REPAIR (STL PIPE PEDESTRIAN RAIL - PR1)
LF 200.000 $100.000 $1.000 $94.023
REPAIR (EXISTING METAL PED. RAIL)
LF 200.000 $85.000 $150.000 $94.023
REPLACE (STEEL RAIL)
LF 100.000 $150.000 $50.000 $20.000
CONCRETE RAIL REPAIR (IN-KIND)
LF 150.000 $450.000 $100.000 $300.000
CONCRETE RAIL REPLACEMENT (IN-KIND)
LF 150.000 $175.000 $100.000 $50.000
REM/REPLACE CURB GUIDANCE SYSTEM
EA 100.000 $225.000 $300.000 $150.000
REM/REPLACE CURB
EA 100.000 $150.000 $230.000 $100.000
REM/REPLACE VISION STRIP
EA 100.000 $225.000 $10.000 $150.000
REM/REPLACE CURB TRANS END SECTION
EA 10.000 $215.000 $100.000 $150.000
REM/REPLACE DELINEATOR POST ASSEMBLY
EA 200.000 $65.000 $200.000 $50.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 75.000 $110.000 $10.000 $25.000
REPAIR SMALL RDSD SIGN SUPT & ASSEM
EA 200.000 $405.000 $300.000 $25.000
RELOC SMALL RDSD SIGN SUPT & ASSEM
EA 25.000 $200.000 $150.000 $100.000
REPLACE SMALL RDSD SIGN SUPP & ASSEM
EA 150.000 $420.000 $300.000 $475.000
REMV SMALL RDSD SIGN SUPP & ASSEM
EA 25.000 $100.000 $120.000 $20.000
TMA (STATIONARY)
DAY 500.000 $100.000 $1.000 $75.000
TMA (MOBILE OPERATION)
HR 2,000.000 $50.000 $1.000 $85.000
REPAIR LG RDSD SIGN SUPT & ASSEMBLIES
EA 30.000 $950.000 $300.000 $1,676.500
RELOC LG RDSD SIGN SUPT & ASSEMBLIES
EA 20.000 $75.000 $65.000 $100.000
REPL LARGE RDSD SIGN SUPP & ASSEM
EA 125.000 $1,200.000 $500.000 $1,000.000
REMV LARGE RDSD SIGN SUPP & ASSEM
EA 125.000 $60.000 $50.000 $1.000
INCIDENT MANAGEMENT (TYPE A)
HR 100.000 $142.000 $100.000 $180.000
INCIDENT MANAGEMENT (TYPE B)
HR 100.000 $170.000 $100.000 $150.000
INCIDENT MANAGEMENT (TYPE C)
HR 100.000 $160.000 $100.000 $225.000
INCIDENT MANAGEMENT (TYPE D)
HR 100.000 $212.000 $100.000 $50.000
INCIDENT MANAGEMENT (TYPE E)
HR 100.000 $340.000 $100.000 $225.000
INCIDENT MANAGEMENT (TYPE F)
HR 80.000 $175.000 $100.000 $150.000
INCIDENT MANAGEMENT (TYPE G)
HR 80.000 $84.000 $100.000 $100.000
INCIDENT MANAGEMENT (TYPE H)
HR 80.000 $105.000 $100.000 $225.000
INCIDENT MANAGEMENT (TYPE I)
HR 80.000 $220.000 $100.000 $50.000
INCIDENT MANAGEMENT (TYPE J)
HR 80.000 $43.000 $50.000 $50.000
REML & DISPL DRIFTWOOD & DEBRIS
CY 500.000 $100.000 $40.000 $75.000
SITE INSPECTION AND CLEANING
EA 200.000 $155.000 $120.000 $199.500
TRASH, DEBRIS, AND SEDIMENT REMOVAL
CYC 100.000 $290.000 $250.000 $304.500
REPLACING FILTER CARTRIDGES
EA 1,000.000 $45.000 $50.000 $40.950
ROTATION OF FILTER CARTRIDGES
EA 1,000.000 $20.000 $13.000 $13.650
MOWING AND TRIMMING
CYC 40.000 $255.000 $180.000 $181.650
REPLACE BLADDER VALVE
EA 15.000 $145.000 $150.000 $155.400
REPLACE BATTERY
EA 50.000 $85.000 $60.000 $60.900
SNOW AND ICE CONTROL (TRUCK)
HR 400.000 $95.000 $60.000 $80.000
SNOW AND ICE CONTROL (SHADOW VEHICLE)
HR 500.000 $60.000 $50.000 $105.000
SNOW AND ICE CONTROL (SPRAY RIG)
HR 400.000 $95.000 $60.000 $105.000
SNOW AND ICE CONTROL SEASON
MO 10.000 $50,000.000 $200,000.000 $45,500.000
PERM CONC TRAFF BARRIER REPAIR
LF 100.000 $115.000 $100.000 $250.000
PERM CONC TRAFF BARRIER REPLACE
LF 50.000 $225.000 $200.000 $350.000