Bid Cobra

COMAL IH0035 (6372-52-001)

Items: 155

County: COMAL
Length: N/A
Highway: IH0035
District: SAN ANTONIO
Control Number: 6372-52-001
DBE Goal: N/A
Project: RMC - 637252001
Guaranty: N/A
Time: 730 WORKING DAYS
Engineer's Estimate: $7,733,990.00
Date: 01/08/2021 (5 years ago)
Contract Number: N/A
Type: ROUTINE MAINTENANCE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (4)
E
Engineer's Estimate
$7,733,990.00
$5,393,594.00
Over/Under Est: -30.26% -$2,340,396.00
Over/Under Est: -24.51% -$1,895,302.72
Amt Left: 8.25% $445,093.28
Over/Under Est: -22.39% -$1,731,788.00
Amt Left: 11.28% $608,608.00
Delta: -2.80% -$163,514.72
Over/Under Est: -18.26% -$1,412,471.00
Amt Left: 17.2% $927,925.00
Delta: -5.32% -$319,317.00

Bid Items & Bid Tabulations

155 Total 0 of 155
COMAL  |  IH0035  |  SAN ANTONIO  |  6372-52-001  |  01/08/2021  |  $7,733,990.00  |  RMC - 637252001  |  ROUTINE MAINT  |  730 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DBI SERVICES, LLC
CROSS PLUS CONSTRUCTION, LLC
ELITE CASTLE RESOURCES LLC
ROY JORGENSEN ASSOCIATES, INC.
REMOVING CONC (MEDIANS)
SY 200.000 $2,000.000 $20.000 $20.000 $50.000 $20.000
REMOVING CONC (FOUNDATIONS)
CY 20.000 $200.000 $350.000 $35.000 $50.000 $150.000
REMOVING CONC (CURB)
LF 100.000 $2.750 $6.000 $10.000 $25.000 $10.000
REMOVING CONC (MISC)
SY 100.000 $45.000 $45.000 $10.000 $50.000 $25.000
FLOWABLE BACKFILL
CY 100.000 $160.000 $245.000 $250.000 $250.000 $275.000
CL K CONC (MISC)
CY 100.000 $250.000 $500.000 $500.000 $500.000 $400.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 20.000 $175.000 $100.000 $200.000 $200.000 $250.000
RIPRAP (CONC)(CL B)
CY 50.000 $1,050.000 $300.000 $500.000 $500.000 $500.000
RIPRAP (MOW STRIP)(4 IN)
CY 10.000 $475.000 $600.000 $600.000 $500.000 $500.000
MOBILIZATION (CALLOUT)
EA 200.000 $1,400.000 $600.000 $400.000 $1,500.000 $2,000.000
MOBILIZATION (EMERGENCY)
EA 75.000 $325.000 $500.000 $500.000 $500.000 $250.000
CONC CURB (TY II)
LF 50.000 $25.000 $50.000 $25.000 $20.000 $35.000
CONC SIDEWALKS (4")
SY 200.000 $85.000 $70.000 $48.000 $50.000 $55.000
MTL W-BEAM GD FEN (TIM POST)
LF 200.000 $20.000 $32.000 $23.100 $25.000 $45.000
MTL W-BEAM GD FEN (STEEL POST)
LF 100.000 $20.000 $45.000 $23.100 $25.000 $55.000
MTL THRIE-BEAM GD FEN (TIM POST)
LF 100.000 $55.000 $90.000 $55.000 $100.000 $55.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 25.000 $1,350.000 $1,200.000 $1,320.000 $1,250.000 $1,100.000
MTL BM GD FEN TRANS (NON - SYM)
EA 10.000 $775.000 $750.000 $1,100.000 $600.000 $500.000
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 10.000 $520.000 $1,200.000 $550.000 $500.000 $350.000
REMOVE METAL BEAM GUARD FENCE
LF 100.000 $2.250 $4.000 $1.100 $8.000 $10.000
REMOVE TERMINAL ANCHOR SECTION
EA 3.000 $112.000 $500.000 $1.100 $500.000 $500.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 10.000 $21.000 $300.000 $110.000 $200.000 $500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 5.000 $2,800.000 $4,000.000 $3,300.000 $3,000.000 $2,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 5.000 $390.000 $540.000 $110.000 $500.000 $500.000
CHAIN LINK FENCE (INSTALL) (6')
LF 200.000 $29.000 $20.000 $35.000 $15.000 $14.500
CHAIN LINK FENCE (REPAIR) (6')
LF 100.000 $12.000 $20.000 $32.000 $15.000 $10.000
CHAIN LINK FENCE (REMOVE)
LF 1,000.000 $6.000 $10.000 $6.000 $5.000 $4.250
CHAIN LINK FENCE (REPAIR) (4')
LF 200.000 $12.000 $15.000 $25.000 $15.000 $10.000
CHN LNK FNCE GATE(PVC CTD)(INSTL)6'X4'
EA 4.000 $680.000 $715.000 $922.000 $700.000 $1,000.000
CHAIN LINK FENCE (INSTALL) (4')
LF 100.000 $20.000 $25.000 $29.000 $15.000 $12.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 50.000 $6.000 $30.000 $6.000 $20.000 $35.000
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
EA 100.000 $23.000 $30.000 $42.000 $25.000 $35.000
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
EA 50.000 $32.000 $30.000 $42.000 $25.000 $35.000
POTHOLE REPAIR (STANDARD)
SY 500.000 $65.000 $100.000 $100.000 $130.000 $100.000
EMERGENCY MOBILIZATION
EA 50.000 $65.000 $250.000 $500.000 $300.000 $100.000
FULL - WIDTH MOWING
AC 3,408.000 $30.000 $44.000 $60.000 $50.000 $63.000
SPOT MOWING
AC 150.000 $50.000 $44.000 $46.000 $50.000 $60.000
LITTER REMOVAL
AC 23,376.000 $10.000 $10.000 $11.480 $9.000 $20.000
LITTER REMOVAL (SPOT)
AC 100.000 $15.000 $100.000 $21.000 $100.000 $50.000
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
MI 2,024.000 $30.000 $40.000 $65.000 $46.000 $70.000
DEBRIS REMOVAL (ENTRANCE/EXIT RAMPS)
MI 712.000 $40.000 $40.000 $65.000 $46.000 $70.000
DEBRIS REMOVAL (SPOT DEBRIS)
MI 250.000 $100.000 $30.000 $65.000 $46.000 $60.000
CLEANING / SWEEPING (CENTER MEDIAN)
MI 607.200 $120.000 $180.000 $220.000 $185.000 $250.000
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
MI 607.200 $120.000 $180.000 $220.000 $185.000 $250.000
CLEANING / SWEEPING (FRONTAGE ROAD)
MI 607.200 $120.000 $180.000 $220.000 $185.000 $250.000
CLEANING / SWEEPING(ENTRANCE/EXIT RAMP)
MI 213.600 $120.000 $180.000 $220.000 $185.000 $250.000
CLEANING / SWEEPING (AGGREGATE REMOVAL)
MI 100.000 $200.000 $100.000 $300.000 $185.000 $225.000
CLEANING / SWEEPING (SPOT)
MI 50.000 $200.000 $150.000 $300.000 $200.000 $225.000
CLEANING / SWEEPING (HANDWORK)
SY 10,000.000 $1.250 $2.000 $2.000 $3.000 $2.000
GRAFFITI REMOVAL (PAINTING)
SF 5,000.000 $1.000 $1.000 $8.000 $2.000 $1.500
TREE TRIMMING AND BRUSH REMOVAL
LF 5,000.000 $25.000 $15.000 $5.000 $25.000 $20.000
DRAIN INLET CLEANING
EA 100.000 $120.000 $200.000 $100.000 $250.000 $150.000
SLOTTED DRAIN CLEANING
LF 1,000.000 $6.500 $10.000 $21.000 $25.000 $15.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 5,000.000 $15.000 $18.000 $33.000 $30.000 $20.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 30.000 $35.000 $90.000 $33.000 $50.000 $15.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 20.000 $30.000 $60.000 $33.000 $50.000 $24.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 100.000 $15.000 $26.000 $27.500 $30.000 $35.000
REALIGN EXISTING RAIL
LF 200.000 $8.000 $8.000 $2.200 $8.000 $5.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 1,000.000 $40.000 $50.000 $44.000 $100.000 $30.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 20.000 $60.000 $150.000 $55.000 $100.000 $50.000
REPAIR STEEL POST WITH BASE PLATE
EA 10.000 $110.000 $300.000 $220.000 $200.000 $100.000
REALIGN POSTS
EA 500.000 $15.000 $25.000 $11.000 $5.000 $5.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 1,500.000 $15.000 $25.000 $24.200 $20.000 $27.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 500.000 $55.000 $80.000 $66.000 $150.000 $80.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 5.000 $50.000 $125.000 $1.100 $100.000 $50.000
REPLACE TERMINAL ANCHOR POSTS
EA 5.000 $60.000 $125.000 $110.000 $100.000 $50.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 20.000 $3,000.000 $3,500.000 $3,300.000 $3,800.000 $4,000.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 20.000 $850.000 $1,000.000 $880.000 $1,000.000 $1,000.000
REM & RESET SGT IMPACT HEAD
EA 20.000 $250.000 $300.000 $220.000 $500.000 $200.000
REMOVE AND REPLACE DAT
EA 50.000 $550.000 $1,000.000 $1,320.000 $1,300.000 $950.000
REPAIR MTL BM GD FEN(LONG SPAN SYS)
LF 250.000 $25.000 $31.000 $27.500 $50.000 $100.000
REPLACE SINGLE GDRAIL TERM POST(WOOD)
EA 50.000 $150.000 $250.000 $82.500 $80.000 $100.000
REPLACE SINGLE GDRAIL TERM POST(STEEL)
EA 50.000 $150.000 $250.000 $82.500 $250.000 $150.000
REPLACE NON-SYMMETRICAL TRANSITION
EA 5.000 $1,000.000 $600.000 $1,100.000 $600.000 $299.000
POST AND CABLE FENCE (REMOVAL)
LF 400.000 $1.750 $3.000 $3.300 $5.000 $5.000
POST AND CABLE FENCE (REMV CONC ANCHOR)
EA 5.000 $110.000 $150.000 $55.000 $100.000 $100.000
POST AND CABLE FENCE (NEW INSTALLATION)
LF 500.000 $11.000 $18.000 $8.800 $15.000 $13.000
POST AND CABLE FENCE (NEW CONC ANCHOR)
EA 15.000 $115.000 $150.000 $55.000 $50.000 $150.000
POST AND CABLE FENCE(REMV / REPL POSTS)
EA 100.000 $50.000 $70.000 $55.000 $100.000 $70.000
POST AND CABLE FENCE(RMV/REPL CNC ANCH)
EA 10.000 $115.000 $225.000 $55.000 $100.000 $150.000
POST AND CABLE FENCE (REMV/ REPL CABLE)
LF 250.000 $12.000 $15.000 $3.300 $5.000 $12.000
POST AND CABLE FENCE (REPAIR)
LF 500.000 $6.000 $15.000 $3.300 $8.000 $6.000
REMOVE AND REPLACE (TRACC)
EA 2.000 $15,000.000 $22,000.000 $22,000.000 $15,000.000 $13,000.000
REMOVE AND REPLACE (WIDE TRACC)
EA 2.000 $20,000.000 $25,000.000 $31,900.000 $25,000.000 $21,000.000
REMOVE AND REPLACE (NARROW REACT 350)
EA 2.000 $22,000.000 $18,000.000 $20,900.000 $25,000.000 $19,000.000
REMOVE AND REPLACE (WIDE REACT 350)
EA 2.000 $22,000.000 $100.000 $33,000.000 $6,800.000 $30,000.000
REPAIR (TRACC)
EA 15.000 $2,500.000 $3,000.000 $2,750.000 $4,000.000 $3,000.000
REPAIR (TRACC)
LF 500.000 $75.000 $500.000 $275.000 $250.000 $275.000
REPAIR (WIDE TRACC)
LF 500.000 $165.000 $400.000 $330.000 $250.000 $275.000
REPAIR (REACT)
EA 5.000 $2,100.000 $2,200.000 $2,200.000 $3,900.000 $2,000.000
REMOVE AND REPLACE (NARROW QUAD)
EA 1.000 $22,000.000 $26,000.000 $22,000.000 $30,000.000 $20,000.000
REMOVE AND REPLACE (WIDE QUAD)
EA 2.000 $20,000.000 $35,000.000 $33,000.000 $30,000.000 $20,000.000
REPAIR (WIDE QUAD)
EA 10.000 $1,500.000 $2,500.000 $2,200.000 $3,800.000 $4,000.000
REPAIR REACT (N) (CYLINDERS)
EA 10.000 $3,000.000 $4,500.000 $3,850.000 $3,500.000 $5,000.000
REPAIR (QUAD) (N) (BAY)
EA 50.000 $1,700.000 $2,200.000 $1,650.000 $1,800.000 $2,000.000
REPAIR (QUAD) (W) (BAY)
EA 50.000 $1,600.000 $1,500.000 $1,650.000 $1,800.000 $2,000.000
REMOVE AND REPLACE (FASTRACC)
EA 2.000 $15,000.000 $31,200.000 $24,200.000 $25,000.000 $20,000.000
REMOVE AND REPLACE (SMTC) (W)
EA 2.000 $25,000.000 $32,448.000 $33,000.000 $35,000.000 $32,000.000
REPAIR (SMTC) (W)
EA 10.000 $2,200.000 $2,700.000 $2,750.000 $3,500.000 $3,500.000
REPAIR (VIA -SAND FILL PLASTIC BARRELS)
EA 150.000 $300.000 $500.000 $440.000 $400.000 $425.000
REMOVE AND REPLACE (SHORTRACC)
EA 2.000 $7,500.000 $10,000.000 $13,200.000 $9,000.000 $10,000.000
REPAIR (FASTRACC)
LF 500.000 $75.000 $500.000 $275.000 $250.000 $275.000
REPAIR (SHORTRACC)
LF 500.000 $500.000 $500.000 $275.000 $250.000 $275.000
REPAIR TAU II (W)
LF 500.000 $2,100.000 $125.000 $220.000 $250.000 $275.000
REMOVE AND REPLACE TAU II (W)
EA 2.000 $20,000.000 $2,500.000 $2,750.000 $25,000.000 $25,000.000
REMOVE AND REPLACE (QUADGUARD)(MASH)(N)
EA 2.000 $17,000.000 $30,000.000 $26,400.000 $25,000.000 $25,000.000
REPAIR (QUADGUARD)(MASH)(N)
LF 500.000 $200.000 $200.000 $220.000 $250.000 $225.000
REMOVE AND REPLACE (TAU)(MASH)(N)
EA 2.000 $20,000.000 $2,500.000 $23,100.000 $25,000.000 $20,000.000
REPAIR (TAU)(MASH)(N)
LF 500.000 $200.000 $100.000 $220.000 $250.000 $225.000
REPAIR (STL PIPE PEDESTRIAN RAIL - PR1)
LF 200.000 $125.000 $140.000 $89.000 $150.000 $54.000
REPAIR (EXISTING METAL PED. RAIL)
LF 200.000 $100.000 $140.000 $89.000 $150.000 $55.000
REPLACE (STEEL RAIL)
LF 100.000 $150.000 $160.000 $89.000 $50.000 $68.000
CONCRETE RAIL REPAIR (IN-KIND)
LF 200.000 $250.000 $130.000 $300.000 $250.000 $200.000
CONCRETE RAIL REPLACEMENT (IN-KIND)
LF 200.000 $350.000 $100.000 $300.000 $250.000 $150.000
REM/REPLACE CURB GUIDANCE SYSTEM
EA 100.000 $200.000 $150.000 $200.000 $250.000 $250.000
REM/REPLACE CURB
EA 100.000 $30.000 $150.000 $250.000 $250.000 $150.000
REM/REPLACE VISION STRIP
EA 200.000 $20.000 $35.000 $200.000 $100.000 $200.000
REM/REPLACE CURB TRANS END SECTION
EA 20.000 $525.000 $100.000 $500.000 $150.000 $200.000
REM/REPLACE DELINEATOR POST ASSEMBLY
EA 200.000 $130.000 $90.000 $75.000 $50.000 $50.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 100.000 $95.000 $120.000 $75.000 $85.000 $100.000
REPAIR SMALL RDSD SIGN SUPT & ASSEM
EA 500.000 $275.000 $200.000 $300.000 $400.000 $300.000
RELOC SMALL RDSD SIGN SUPT & ASSEM
EA 25.000 $140.000 $150.000 $200.000 $50.000 $50.000
REPLACE SMALL RDSD SIGN SUPP & ASSEM
EA 150.000 $350.000 $500.000 $451.000 $450.000 $400.000
REMV SMALL RDSD SIGN SUPP & ASSEM
EA 50.000 $22.000 $120.000 $23.000 $50.000 $50.000
TMA (STATIONARY)
DAY 500.000 $160.000 $1.000 $500.000 $1,000.000 $1.000
TMA (MOBILE OPERATION)
HR 16,000.000 $85.000 $1.000 $1.000 $1.000 $1.000
TMA (MOBILE OPERATION)
DAY 500.000 $170.000 $1.000 $1.000 $1.000 $1.000
REPAIR LG RDSD SIGN SUPT & ASSEMBLIES
EA 30.000 $525.000 $300.000 $900.000 $800.000 $750.000
RELOC LG RDSD SIGN SUPT & ASSEMBLIES
EA 20.000 $210.000 $65.000 $300.000 $50.000 $50.000
REPL LARGE RDSD SIGN SUPP & ASSEM
EA 125.000 $675.000 $850.000 $2,100.000 $800.000 $1,000.000
REMV LARGE RDSD SIGN SUPP & ASSEM
EA 125.000 $37.000 $300.000 $200.000 $50.000 $50.000
INCIDENT MANAGEMENT (TYPE A)
HR 100.000 $135.000 $100.000 $99.000 $100.000 $115.000
INCIDENT MANAGEMENT (TYPE B)
HR 100.000 $200.000 $100.000 $99.000 $100.000 $145.000
INCIDENT MANAGEMENT (TYPE C)
HR 200.000 $350.000 $100.000 $99.000 $100.000 $135.000
INCIDENT MANAGEMENT (TYPE D)
HR 300.000 $500.000 $100.000 $99.000 $100.000 $180.000
INCIDENT MANAGEMENT (TYPE E)
HR 300.000 $575.000 $100.000 $250.000 $100.000 $235.000
INCIDENT MANAGEMENT (TYPE F)
HR 80.000 $190.000 $100.000 $268.000 $100.000 $145.000
INCIDENT MANAGEMENT (TYPE G)
HR 80.000 $95.000 $100.000 $250.000 $100.000 $75.000
INCIDENT MANAGEMENT (TYPE H)
HR 80.000 $130.000 $100.000 $99.000 $100.000 $90.000
INCIDENT MANAGEMENT (TYPE I)
HR 80.000 $220.000 $100.000 $99.000 $100.000 $195.000
INCIDENT MANAGEMENT (TYPE J)
HR 80.000 $380.000 $100.000 $99.000 $100.000 $40.000
REML & DISPL DRIFTWOOD & DEBRIS
CY 500.000 $65.000 $60.000 $99.000 $50.000 $30.000
SITE INSPECTION AND CLEANING
EA 200.000 $110.000 $120.000 $150.000 $50.000 $1,000.000
TRASH, DEBRIS, AND SEDIMENT REMOVAL
CYC 100.000 $260.000 $250.000 $300.000 $50.000 $1,000.000
REPLACING FILTER CARTRIDGES
EA 1,000.000 $35.000 $40.000 $42.000 $10.000 $35.000
ROTATION OF FILTER CARTRIDGES
EA 1,000.000 $12.000 $11.000 $15.000 $10.000 $25.000
MOWING AND TRIMMING
CYC 40.000 $180.000 $180.000 $250.000 $200.000 $750.000
REPLACE BLADDER VALVE
EA 15.000 $150.000 $150.000 $178.000 $250.000 $200.000
REPLACE BATTERY
EA 50.000 $55.000 $60.000 $75.000 $250.000 $100.000
SNOW AND ICE CONTROL (TRUCK)
HR 400.000 $100.000 $50.000 $100.000 $80.000 $85.000
SNOW AND ICE CONTROL (SHADOW VEHICLE)
HR 500.000 $100.000 $50.000 $100.000 $50.000 $60.000
SNOW AND ICE CONTROL (SPRAY RIG)
HR 400.000 $100.000 $50.000 $100.000 $80.000 $85.000
SNOW AND ICE CONTROL SEASON
MO 10.000 $24,000.000 $50,000.000 $15,000.000 $25,000.000 $40,000.000
PERM CONC TRAFF BARRIER REPAIR
LF 50.000 $250.000 $100.000 $456.000 $250.000 $100.000
PERM CONC TRAFF BARRIER REPLACE
LF 50.000 $250.000 $200.000 $425.000 $250.000 $195.000
Totals: $7,733,990.000 $5,393,594.000 $5,838,687.280 $6,002,202.000 $6,321,519.000