REMOVING CONC (MEDIANS)
|
SY
|
200.000
|
$52.000
|
$19.430
|
$20.000
|
$19.000
|
$15.000
|
$100.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
100.000
|
$6.000
|
$9.720
|
$20.000
|
$2.650
|
$10.000
|
$15.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
20.000
|
$65.000
|
$96.860
|
$150.000
|
$128.000
|
$150.000
|
$300.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
100.000
|
$16.000
|
$298.180
|
$340.000
|
$1,015.000
|
$350.000
|
$500.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
10.000
|
$25.000
|
$617.760
|
$840.000
|
$414.000
|
$750.000
|
$700.000
|
|
|
MOBILIZATION (CALLOUT)
|
EA
|
300.000
|
$100.000
|
$400.000
|
$200.000
|
$2,180.000
|
$1,350.000
|
$500.000
|
|
|
MOBILIZATION (EMERGENCY)
|
EA
|
150.000
|
$150.000
|
$900.000
|
$200.000
|
$287.000
|
$300.000
|
$400.000
|
|
|
CONC CURB (TY II)
|
LF
|
100.000
|
$16.000
|
$39.720
|
$33.000
|
$23.000
|
$20.000
|
$20.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
200.000
|
$66.000
|
$65.300
|
$50.000
|
$68.000
|
$65.000
|
$50.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
500.000
|
$12.000
|
$25.200
|
$25.000
|
$23.000
|
$18.000
|
$30.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
100.000
|
$16.000
|
$25.200
|
$40.000
|
$23.000
|
$20.000
|
$30.000
|
|
|
MTL THRIE-BEAM GD FEN (TIM POST)
|
LF
|
50.000
|
$15.000
|
$72.000
|
$75.000
|
$65.000
|
$60.000
|
$60.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
50.000
|
$985.000
|
$1,920.000
|
$1,000.000
|
$1,685.000
|
$1,150.000
|
$1,125.000
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
15.000
|
$50.000
|
$600.000
|
$1,000.000
|
$530.000
|
$950.000
|
$1,055.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
100.000
|
$2.000
|
$2.400
|
$10.000
|
$2.250
|
$5.000
|
$20.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
3.000
|
$5.000
|
$390.000
|
$400.000
|
$352.000
|
$250.000
|
$500.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
10.000
|
$50.000
|
$240.000
|
$222.000
|
$216.000
|
$75.000
|
$500.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
5.000
|
$1,800.000
|
$3,480.000
|
$2,800.000
|
$3,060.000
|
$2,950.000
|
$4,000.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
5.000
|
$200.000
|
$432.000
|
$500.000
|
$400.000
|
$350.000
|
$420.000
|
|
|
CHAIN LINK FENCE (INSTALL) (6')
|
LF
|
200.000
|
$10.000
|
$33.600
|
$20.000
|
$18.000
|
$16.000
|
$25.000
|
|
|
CHAIN LINK FENCE (REPAIR) (6')
|
LF
|
100.000
|
$5.000
|
$24.000
|
$20.000
|
$11.000
|
$12.000
|
$20.000
|
|
|
CHAIN LINK FENCE (REMOVE)
|
LF
|
2,000.000
|
$1.000
|
$6.000
|
$10.000
|
$5.500
|
$5.000
|
$3.000
|
|
|
CHAIN LINK FENCE (REPAIR) (4')
|
LF
|
400.000
|
$2.000
|
$24.000
|
$15.000
|
$12.000
|
$12.000
|
$20.000
|
|
|
CHN LNK FNCE GATE(PVC CTD)(INSTL)6'X4'
|
EA
|
8.000
|
$500.000
|
$960.000
|
$600.000
|
$633.000
|
$750.000
|
$850.000
|
|
|
CHAIN LINK FENCE (INSTALL) (4')
|
LF
|
200.000
|
$6.000
|
$31.200
|
$15.000
|
$19.000
|
$10.000
|
$20.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(FLX)GF2
|
EA
|
100.000
|
$20.000
|
$36.000
|
$55.000
|
$22.000
|
$20.000
|
$25.000
|
|
|
INSTL DEL ASSM (D-DY)SZ 1(FLX)GF2
|
EA
|
100.000
|
$20.000
|
$36.000
|
$55.000
|
$30.000
|
$25.000
|
$25.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
50.000
|
$2.000
|
$60.000
|
$6.150
|
$6.250
|
$15.000
|
$10.000
|
|
|
POTHOLE REPAIR (STANDARD)
|
SY
|
500.000
|
$40.000
|
$89.330
|
$50.000
|
$58.000
|
$65.000
|
$100.000
|
|
|
EMERGENCY MOBILIZATION
|
EA
|
100.000
|
$500.000
|
$250.000
|
$50.000
|
$50.000
|
$200.000
|
$500.000
|
|
|
FULL - WIDTH MOWING
|
AC
|
3,408.000
|
$28.480
|
$28.220
|
$35.000
|
$53.000
|
$40.000
|
$40.000
|
|
|
SPOT MOWING
|
AC
|
150.000
|
$22.720
|
$34.500
|
$100.000
|
$90.000
|
$45.000
|
$150.000
|
|
|
LITTER REMOVAL
|
AC
|
23,376.000
|
$6.000
|
$8.870
|
$8.000
|
$11.750
|
$11.000
|
$15.000
|
|
|
LITTER REMOVAL (SPOT)
|
AC
|
100.000
|
$10.000
|
$14.840
|
$200.000
|
$72.000
|
$15.000
|
$100.000
|
|
|
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
|
MI
|
1,821.600
|
$23.220
|
$30.050
|
$50.000
|
$10.000
|
$50.000
|
$130.000
|
|
|
DEBRIS REMOVAL (ENTRANCE/EXIT RAMPS)
|
MI
|
640.800
|
$23.740
|
$42.080
|
$40.000
|
$10.000
|
$55.000
|
$90.000
|
|
|
DEBRIS REMOVAL (SPOT DEBRIS)
|
MI
|
250.000
|
$150.000
|
$96.960
|
$200.000
|
$150.000
|
$60.000
|
$200.000
|
|
|
CLEANING / SWEEPING (CENTER MEDIAN)
|
MI
|
607.200
|
$210.030
|
$116.840
|
$230.000
|
$140.000
|
$190.000
|
$220.000
|
|
|
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
|
MI
|
607.200
|
$129.980
|
$116.840
|
$230.000
|
$140.000
|
$195.000
|
$220.000
|
|
|
CLEANING / SWEEPING (FRONTAGE ROAD)
|
MI
|
607.200
|
$122.100
|
$116.840
|
$230.000
|
$140.000
|
$185.000
|
$220.000
|
|
|
CLEANING / SWEEPING(ENTRANCE/EXIT RAMP)
|
MI
|
213.600
|
$190.000
|
$116.840
|
$230.000
|
$140.000
|
$185.000
|
$220.000
|
|
|
CLEANING / SWEEPING (AGGREGATE REMOVAL)
|
MI
|
100.000
|
$160.000
|
$231.140
|
$400.000
|
$50.000
|
$250.000
|
$250.000
|
|
|
CLEANING / SWEEPING (SPOT)
|
MI
|
50.000
|
$160.000
|
$231.140
|
$400.000
|
$325.000
|
$250.000
|
$300.000
|
|
|
GRAFFITI REMOVAL (PAINTING)
|
SF
|
20,000.000
|
$1.000
|
$2.980
|
$1.000
|
$0.500
|
$0.750
|
$2.500
|
|
|
TREE TRIMMING AND BRUSH REMOVAL
|
LF
|
5,000.000
|
$5.000
|
$33.600
|
$10.000
|
$13.150
|
$9.000
|
$10.000
|
|
|
DRAIN INLET CLEANING
|
EA
|
50.000
|
$250.000
|
$570.880
|
$300.000
|
$300.000
|
$125.000
|
$300.000
|
|
|
REPAIR RAIL ELEMENT (W - BEAM)
|
LF
|
5,000.000
|
$12.000
|
$15.600
|
$15.000
|
$18.150
|
$13.500
|
$17.000
|
|
|
REPAIR RAIL ELEMENT (THRIE - BEAM)
|
LF
|
75.000
|
$10.000
|
$72.000
|
$100.000
|
$64.000
|
$50.000
|
$50.000
|
|
|
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
|
LF
|
35.000
|
$10.000
|
$48.000
|
$100.000
|
$65.000
|
$60.000
|
$50.000
|
|
|
REALIGN EXISTING RAIL
|
LF
|
200.000
|
$5.000
|
$4.800
|
$8.000
|
$5.000
|
$5.000
|
$6.000
|
|
|
REM / REPL TIMBER/STL POST W/O CONC FND
|
EA
|
1,500.000
|
$20.000
|
$54.000
|
$40.000
|
$47.500
|
$40.000
|
$60.000
|
|
|
REM / REPL TIMBER / STL POST W/CONC FND
|
EA
|
20.000
|
$40.000
|
$120.000
|
$100.000
|
$150.000
|
$150.000
|
$115.000
|
|
|
REPAIR STEEL POST WITH BASE PLATE
|
EA
|
10.000
|
$5.000
|
$120.000
|
$150.000
|
$150.000
|
$100.000
|
$200.000
|
|
|
REALIGN POSTS
|
EA
|
1,500.000
|
$8.000
|
$18.000
|
$10.000
|
$16.000
|
$10.000
|
$10.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL RAIL
|
LF
|
2,000.000
|
$13.000
|
$16.800
|
$20.000
|
$14.750
|
$15.000
|
$25.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL POST
|
EA
|
1,500.000
|
$75.000
|
$84.000
|
$50.000
|
$74.000
|
$70.000
|
$130.000
|
|
|
REPAIR OF TERMINAL ANCHORS POSTS
|
EA
|
5.000
|
$5.000
|
$120.000
|
$200.000
|
$200.000
|
$125.000
|
$500.000
|
|
|
REPLACE TERMINAL ANCHOR POSTS
|
EA
|
5.000
|
$5.000
|
$120.000
|
$200.000
|
$200.000
|
$150.000
|
$500.000
|
|
|
REMOVE GDRAIL END TRT / REPL WITH SGT
|
EA
|
20.000
|
$1,800.000
|
$3,480.000
|
$3,200.000
|
$3,050.000
|
$3,000.000
|
$4,000.000
|
|
|
REPL SINGLE GDRAIL TERM IMPACT HEAD
|
EA
|
20.000
|
$650.000
|
$1,044.000
|
$900.000
|
$920.000
|
$925.000
|
$1,300.000
|
|
|
REM & RESET SGT IMPACT HEAD
|
EA
|
50.000
|
$270.000
|
$432.000
|
$300.000
|
$380.000
|
$350.000
|
$350.000
|
|
|
POST AND CABLE FENCE (REMOVAL)
|
LF
|
400.000
|
$1.000
|
$6.000
|
$50.000
|
$5.500
|
$3.000
|
$10.000
|
|
|
POST AND CABLE FENCE (REMV CONC ANCHOR)
|
EA
|
5.000
|
$40.000
|
$120.000
|
$100.000
|
$200.000
|
$150.000
|
$110.000
|
|
|
POST AND CABLE FENCE (NEW INSTALLATION)
|
LF
|
1,000.000
|
$3.000
|
$14.400
|
$25.000
|
$13.000
|
$14.000
|
$25.000
|
|
|
POST AND CABLE FENCE (NEW CONC ANCHOR)
|
EA
|
15.000
|
$50.000
|
$120.000
|
$100.000
|
$109.000
|
$250.000
|
$300.000
|
|
|
POST AND CABLE FENCE(REMV / REPL POSTS)
|
EA
|
200.000
|
$25.000
|
$54.000
|
$80.000
|
$49.000
|
$65.000
|
$90.000
|
|
|
POST AND CABLE FENCE(RMV/REPL CNC ANCH)
|
EA
|
15.000
|
$50.000
|
$180.000
|
$100.000
|
$162.000
|
$175.000
|
$110.000
|
|
|
POST AND CABLE FENCE (REMV/ REPL CABLE)
|
LF
|
500.000
|
$1.000
|
$12.000
|
$10.000
|
$11.000
|
$12.000
|
$20.000
|
|
|
POST AND CABLE FENCE (REPAIR)
|
LF
|
1,000.000
|
$1.500
|
$12.000
|
$8.000
|
$11.000
|
$8.000
|
$10.000
|
|
|
REPAIR (TRACC)
|
EA
|
16.000
|
$1,000.000
|
$1,080.000
|
$3,500.000
|
$3,600.000
|
$2,500.000
|
$3,800.000
|
|
|
REPAIR (REACT)
|
EA
|
10.000
|
$1,000.000
|
$1,800.000
|
$3,500.000
|
$2,100.000
|
$2,800.000
|
$3,000.000
|
|
|
REMOVE AND REPLACE (NARROW QUAD)
|
EA
|
1.000
|
$13,000.000
|
$20,400.000
|
$27,000.000
|
$21,000.000
|
$22,500.000
|
$5,000.000
|
|
|
REPAIR REACT (N) (CYLINDERS)
|
EA
|
10.000
|
$1,500.000
|
$3,720.000
|
$3,500.000
|
$3,300.000
|
$3,000.000
|
$4,100.000
|
|
|
REPAIR (QUAD) (N) (BAY)
|
EA
|
100.000
|
$1,225.000
|
$1,680.000
|
$1,500.000
|
$1,475.000
|
$1,500.000
|
$1,500.000
|
|
|
REPAIR (QUAD) (W) (BAY)
|
EA
|
50.000
|
$800.000
|
$1,680.000
|
$1,700.000
|
$1,475.000
|
$1,650.000
|
$1,500.000
|
|
|
REPAIR (VIA -SAND FILL PLASTIC BARRELS)
|
EA
|
200.000
|
$250.000
|
$360.000
|
$500.000
|
$316.000
|
$250.000
|
$500.000
|
|
|
REPAIR (STL PIPE PEDESTRIAN RAIL - PR1)
|
LF
|
500.000
|
$130.000
|
$60.000
|
$100.000
|
$53.000
|
$95.000
|
$100.000
|
|
|
REPAIR (EXISTING METAL PED. RAIL)
|
LF
|
500.000
|
$80.000
|
$60.000
|
$130.000
|
$53.000
|
$125.000
|
$130.000
|
|
|
CONCRETE RAIL REPAIR (IN-KIND)
|
LF
|
200.000
|
$30.000
|
$120.000
|
$130.000
|
$105.000
|
$100.000
|
$80.000
|
|
|
REM/REPLACE CURB GUIDANCE SYSTEM
|
EA
|
15.000
|
$100.000
|
$142.340
|
$150.000
|
$250.000
|
$150.000
|
$200.000
|
|
|
REM/REPLACE CURB
|
EA
|
150.000
|
$100.000
|
$140.010
|
$100.000
|
$100.000
|
$75.000
|
$140.000
|
|
|
REM/REPLACE VISION STRIP
|
EA
|
400.000
|
$50.000
|
$35.010
|
$50.000
|
$50.000
|
$20.000
|
$30.000
|
|
|
REM/REPLACE CURB TRANS END SECTION
|
EA
|
30.000
|
$100.000
|
$96.810
|
$500.000
|
$200.000
|
$200.000
|
$280.000
|
|
|
REM/REPLACE DELINEATOR POST ASSEMBLY
|
EA
|
300.000
|
$75.000
|
$84.260
|
$100.000
|
$80.000
|
$100.000
|
$85.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
100.000
|
$100.000
|
$119.000
|
$125.000
|
$125.000
|
$115.000
|
$250.000
|
|
|
REPAIR SMALL RDSD SIGN SUPT & ASSEM
|
EA
|
800.000
|
$150.000
|
$64.860
|
$400.000
|
$238.000
|
$245.000
|
$500.000
|
|
|
RELOC SMALL RDSD SIGN SUPT & ASSEM
|
EA
|
50.000
|
$300.000
|
$120.000
|
$225.000
|
$133.000
|
$325.000
|
$600.000
|
|
|
REPLACE SMALL RDSD SIGN SUPP & ASSEM
|
EA
|
200.000
|
$200.000
|
$219.740
|
$325.000
|
$315.000
|
$350.000
|
$600.000
|
|
|
REMV SMALL RDSD SIGN SUPP & ASSEM
|
EA
|
50.000
|
$50.000
|
$5.750
|
$50.000
|
$50.000
|
$20.000
|
$200.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
500.000
|
$150.000
|
$249.900
|
$60.000
|
$225.000
|
$100.000
|
$100.000
|
|
|
REPAIR LG RDSD SIGN SUPT & ASSEMBLIES
|
EA
|
50.000
|
$250.000
|
$257.180
|
$1,000.000
|
$505.000
|
$850.000
|
$700.000
|
|
|
RELOC LG RDSD SIGN SUPT & ASSEMBLIES
|
EA
|
50.000
|
$200.000
|
$64.750
|
$750.000
|
$183.000
|
$900.000
|
$300.000
|
|
|
REPL LARGE RDSD SIGN SUPP & ASSEM
|
EA
|
150.000
|
$100.000
|
$799.370
|
$1,000.000
|
$650.000
|
$950.000
|
$700.000
|
|
|
REMV LARGE RDSD SIGN SUPP & ASSEM
|
EA
|
250.000
|
$150.000
|
$257.180
|
$300.000
|
$50.000
|
$200.000
|
$250.000
|
|
|
INCIDENT MANAGEMENT (TYPE A)
|
HR
|
100.000
|
$600.000
|
$65.320
|
$100.000
|
$132.000
|
$100.000
|
$115.000
|
|
|
INCIDENT MANAGEMENT (TYPE B)
|
HR
|
100.000
|
$650.000
|
$120.750
|
$125.000
|
$185.000
|
$150.000
|
$200.000
|
|
|
INCIDENT MANAGEMENT (TYPE C)
|
HR
|
200.000
|
$700.000
|
$241.500
|
$150.000
|
$342.000
|
$225.000
|
$215.000
|
|
|
INCIDENT MANAGEMENT (TYPE D)
|
HR
|
300.000
|
$800.000
|
$241.500
|
$175.000
|
$500.000
|
$275.000
|
$220.000
|
|
|
INCIDENT MANAGEMENT (TYPE E)
|
HR
|
300.000
|
$1,100.000
|
$241.500
|
$200.000
|
$580.000
|
$400.000
|
$220.000
|
|
|
INCIDENT MANAGEMENT (TYPE F)
|
HR
|
80.000
|
$700.000
|
$398.820
|
$100.000
|
$185.000
|
$150.000
|
$200.000
|
|
|
INCIDENT MANAGEMENT (TYPE G)
|
HR
|
80.000
|
$600.000
|
$398.820
|
$100.000
|
$90.000
|
$75.000
|
$200.000
|
|
|
INCIDENT MANAGEMENT (TYPE H)
|
HR
|
80.000
|
$700.000
|
$398.820
|
$125.000
|
$132.000
|
$125.000
|
$215.000
|
|
|
INCIDENT MANAGEMENT (TYPE I)
|
HR
|
100.000
|
$1,000.000
|
$241.500
|
$150.000
|
$210.000
|
$200.000
|
$215.000
|
|
|
INCIDENT MANAGEMENT (TYPE J)
|
HR
|
100.000
|
$100.000
|
$241.500
|
$100.000
|
$370.000
|
$150.000
|
$90.000
|
|
|
SNOW AND ICE CONTROL (TRUCK)
|
HR
|
500.000
|
$500.000
|
$69.530
|
$50.000
|
$90.000
|
$75.000
|
$80.000
|
|
|
SNOW AND ICE CONTROL (SHADOW VEHICLE)
|
HR
|
1,000.000
|
$100.000
|
$48.280
|
$50.000
|
$90.000
|
$75.000
|
$80.000
|
|
|
SNOW AND ICE CONTROL (SPRAY RIG)
|
HR
|
500.000
|
$100.000
|
$39.780
|
$50.000
|
$90.000
|
$75.000
|
$80.000
|
|
|
SNOW AND ICE CONTROL SEASON
|
MO
|
10.000
|
$10,000.000
|
$7,000.000
|
$20,000.000
|
$27,000.000
|
$65,000.000
|
$50,000.000
|
|
Totals: |
$3,674,626.176
|
$3,586,599.592
|
$3,901,673.500
|
$4,501,576.500
|
$4,521,900.000
|
$5,143,759.000
|