Bid Cobra

COMAL FM 306 (1728-02-065)

Items: 138

County: COMAL
Length: N/A
Highway: FM 306
District: SAN ANTONIO
Control Number: 1728-02-065
DBE Goal: 600.0%
Project: STP 2024(925)MM
Guaranty: N/A
Time: 158 WORKING DAYS
Engineer's Estimate: $7,166,421.67
Date: 04/05/2024 (2 years ago)
Contract Number: N/A
Type: BICYCLE AND PEDESTRIAN IMPROVEMENTS
Mail/Deliver Bids To: N/A
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$7,166,421.67
$7,171,215.50
Over/Under Est: 0.07% $4,793.83
Over/Under Est: 10.69% $765,967.33
Amt Left: 10.61% $761,173.50
$8,383,708.62
Over/Under Est: 16.99% $1,217,286.95
Amt Left: 16.91% $1,212,493.12
Delta: -5.69% -$451,319.62
Over/Under Est: 24.39% $1,747,878.33
Amt Left: 24.31% $1,743,084.50
Delta: -6.33% -$530,591.38
Over/Under Est: 30.56% $2,190,168.85
Amt Left: 30.47% $2,185,375.02
Delta: -4.96% -$442,290.52
$9,431,457.01
Over/Under Est: 31.61% $2,265,035.34
Amt Left: 31.52% $2,260,241.51
Delta: -0.80% -$74,866.49
Subcontractor Percentage Amount
CLASSIC TEJAS CONSTRUCTION, INC. 6.02% $432,538.26
TEXAS MATERIALS GROUP, INC. 4.30% $308,955.90
AAA DRILLING FOUNDATION COMPANY, INC. 3.64% $261,534.76
DUSTROL, INC. 0.69% $49,576.64
TRP CONSTRUCTION GROUP, LLC 0.44% $31,614.09
Total: 15.09% $1,084,219.65

Bid Items & Bid Tabulations

138 Total 0 of 138
COMAL  |  FM 306  |  SAN ANTONIO  |  1728-02-065  |  04/05/2024  |  $7,166,421.67  |  STP 2024(925)MM  |  BICYCLE AND PEDESTRIAN IMPRVS  |  158 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ENCINO LANDSCAPE, INC.
CAPITAL EXCAVATION COMPANY
RELMCO, INC.
HARPER BROTHERS CONSTRUCTION LLC
STERLING DELAWARE HOLDING COMPANY
ALTUS CONSTRUCTION LLC
PREPARING ROW
STA 34.500 $4,500.000 $500.000 $780.000 $10,000.000 $18,950.000 $17,788.000 $27,063.990
PREPARING ROW(TREE)(12" TO 24" DIA)
EA 1.000 $1,150.000 $1,000.000 $5,300.000 $1,000.000 $4,895.000 $1,500.000 $5,718.210
PREPARING ROW (TREE) (36" TO 48" DIA)
EA 3.000 $4,400.000 $1,000.000 $6,900.000 $1,500.000 $6,375.000 $3,000.000 $7,447.110
REMOVING CONC (RIPRAP)
SY 1,859.000 $12.400 $30.000 $22.700 $30.000 $15.000 $20.000 $26.380
REMOVING CONC (MEDIANS)
SY 6.000 $20.800 $30.000 $410.000 $100.000 $159.000 $55.000 $21.900
REMOVING CONC (SIDEWALKS)
SY 16.000 $14.250 $30.000 $67.300 $100.000 $106.000 $37.000 $17.520
REMOVING CONC (DRIVEWAYS)
SY 1,416.000 $29.000 $30.000 $35.650 $30.000 $14.000 $25.000 $19.710
REMOVING CONC (MISC)
SY 125.000 $45.040 $30.000 $78.900 $25.000 $53.000 $70.000 $35.050
REMOVING CONC (HEADWALL)
CY 1.000 $89.900 $30.000 $2,980.000 $2,500.000 $4,183.000 $590.000 $131.420
REMOVING CONCRETE(MOW STRIP)
LF 1,305.000 $9.230 $30.000 $15.900 $15.000 $8.000 $11.000 $19.170
REMOVING STAB BASE AND ASPH PAV (6")
SY 1,968.000 $7.000 $30.000 $9.850 $15.000 $7.000 $8.000 $1.760
REMOVING STAB BASE & ASPH PAV (7"-12")
SY 196.000 $13.000 $30.000 $30.700 $25.000 $35.000 $1.000 $17.520
EXCAVATION (ROADWAY)
CY 9,183.000 $13.000 $30.000 $36.000 $30.000 $37.000 $37.000 $15.680
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 1,076.000 $30.000 $50.000 $41.850 $25.000 $18.000 $19.000 $24.500
FURNISHING AND PLACING TOPSOIL (4")
SY 6,094.000 $3.200 $30.000 $6.650 $5.000 $5.000 $5.000 $5.430
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 6,094.000 $0.260 $0.150 $0.350 $0.350 $0.480 $0.320 $0.350
BROADCAST SEED (TEMP) (WARM)
SY 3,048.000 $0.190 $0.150 $0.350 $0.340 $0.420 $0.310 $0.330
BROADCAST SEED (TEMP) (COOL)
SY 3,048.000 $0.190 $0.150 $0.300 $0.330 $0.420 $0.300 $0.330
PLANE ASPH CONC PAV (2")
SY 12,664.000 $2.360 $8.000 $2.100 $2.200 $2.000 $1.850 $1.100
CEM STABIL BKFL
CY 81.000 $113.000 $400.000 $310.000 $150.000 $286.000 $200.000 $197.130
CUT & RESTORING PAV
SY 106.000 $132.710 $140.000 $83.500 $100.000 $84.000 $44.000 $114.270
TRENCH EXCAVATION PROTECTION
LF 669.000 $4.000 $20.000 $13.400 $15.000 $3.000 $1.000 $8.760
TEMPORARY SPL SHORING
SF 2,009.000 $32.000 $40.000 $36.700 $35.000 $50.000 $48.980 $58.520
DRILL SHAFT (18 IN)
LF 75.000 $180.000 $200.000 $191.000 $250.000 $150.000 $190.000 $203.260
DRILL SHAFT (30 IN)
LF 1,380.000 $315.000 $300.000 $260.000 $325.000 $220.000 $330.000 $339.360
DRILL SHAFT (36 IN)
LF 3,125.000 $395.000 $300.000 $410.000 $350.000 $390.000 $410.000 $490.570
CL C CONC (ABUT)
CY 61.700 $1,650.000 $1,500.000 $1,480.000 $1,402.800 $1,800.000 $2,500.000 $1,954.700
CL C CONC (CAP)
CY 13.000 $2,500.000 $1,600.000 $2,120.000 $1,995.000 $3,600.000 $2,300.000 $6,082.900
CL C CONC (COLUMN)
CY 12.000 $1,700.000 $1,800.000 $1,880.000 $1,799.000 $2,500.000 $2,700.000 $2,582.740
CL C CONC (RAIL FOUNDATION)
CY 114.000 $580.000 $800.000 $890.000 $819.000 $894.000 $880.000 $836.830
CL C CONC (MISC)
CY 1.000 $2,614.000 $2,000.000 $2,260.000 $1,995.000 $4,352.000 $2,500.000 $1,067.590
REINF CONC SLAB
SF 5,992.000 $24.000 $30.000 $34.650 $42.000 $29.000 $51.000 $64.140
APPROACH SLAB
CY 20.300 $840.000 $800.000 $740.000 $917.000 $1,500.000 $750.000 $1,430.340
SHEAR KEY
CY 49.100 $700.000 $600.000 $700.000 $840.000 $1,800.000 $1,000.000 $525.680
RETAINING WALL (DRILL SHAFT) (FACIA)
SF 4,808.000 $80.000 $70.000 $85.000 $102.900 $97.000 $92.000 $69.750
RETAINING WALL (CAST - IN - PLACE)
SF 1,603.000 $95.000 $120.000 $150.000 $106.400 $115.000 $145.000 $74.170
PRESTR CONC BOX BM(4XB28)(MOD1)
LF 199.000 $290.000 $400.000 $370.000 $450.000 $558.000 $550.000 $363.700
PRESTR CONC BOX BM(4XB34)(MOD1)
LF 227.000 $310.000 $400.000 $370.000 $450.000 $517.000 $550.000 $378.320
PRESTR CONC BOX BM(5XB28)(MOD1)
LF 398.000 $300.000 $400.000 $350.000 $450.000 $418.000 $470.000 $372.280
PRESTR CONC BOX BM(5XB34)(MOD1)
LF 454.000 $320.000 $400.000 $350.000 $450.000 $399.000 $470.000 $365.450
RIPRAP (CONC)(4 IN)
CY 444.000 $400.000 $400.000 $600.000 $495.000 $647.000 $720.000 $584.090
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 29.000 $456.360 $400.000 $650.000 $515.000 $659.000 $740.000 $706.750
RIPRAP (CONC)(DISSIPATER)
CY 3.000 $1,350.000 $400.000 $1,430.000 $2,500.000 $4,026.000 $1,600.000 $1,108.900
RIPRAP (CONC)(FLUME)
CY 21.000 $480.000 $400.000 $2,560.000 $515.000 $831.000 $870.000 $672.870
RIPRAP (MOW STRIP)(4 IN)
CY 57.000 $589.000 $400.000 $1,490.000 $500.000 $698.000 $960.000 $751.590
STR STEEL (MISC NON - BRIDGE)
LB 672.000 $16.000 $30.000 $23.250 $15.000 $19.000 $22.000 $17.810
RAIL (TY PR3)
LF 1,063.000 $180.000 $180.000 $410.000 $236.250 $452.000 $230.000 $259.740
RAIL (HANDRAIL)(TY B)
LF 88.000 $80.000 $200.000 $280.000 $262.500 $250.000 $140.000 $265.180
RAIL (HANDRAIL)(TY W)
LF 385.000 $90.000 $250.000 $63.000 $66.150 $63.000 $66.000 $102.170
RAIL (TY SSTR) (W/DRAIN SLOTS)
LF 822.000 $68.770 $100.000 $111.000 $95.000 $81.000 $130.000 $115.650
RAIL(PEDESTRIAN)(SPL)
LF 1,521.000 $225.000 $150.000 $280.000 $367.500 $349.000 $200.000 $283.020
ARMOR JOINT (SEALED)
LF 40.000 $161.520 $150.000 $243.000 $200.000 $224.000 $240.000 $131.420
RC PIPE (CL III)(24 IN)
LF 671.000 $115.000 $120.000 $153.000 $131.600 $144.000 $170.000 $176.760
RC PIPE (CL III)(36 IN)
LF 171.000 $215.000 $220.000 $220.000 $206.220 $172.000 $81.000 $212.610
JCTBOX(COMPL)(PJB)(4FTX4FT)
EA 5.000 $10,300.000 $4,500.000 $5,700.000 $8,120.000 $7,514.000 $7,500.000 $2,490.660
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 2.000 $6,500.000 $4,500.000 $4,140.000 $8,078.000 $7,757.000 $8,400.000 $2,902.050
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
EA 2.000 $10,650.000 $6,000.000 $5,500.000 $9,611.000 $9,967.000 $9,500.000 $4,456.720
INL(CMP)(PAZD-CZ)(FG)(3FTX3FT-3FTX3FT)
EA 1.000 $4,000.000 $5,000.000 $5,400.000 $10,801.000 $8,824.000 $8,900.000 $3,738.400
INL(CMP)(PAZD-CZ)(FG)(4FTX4FT-4FTX4FT)
EA 1.000 $13,000.000 $6,000.000 $6,000.000 $11,641.000 $9,763.000 $9,600.000 $4,360.470
SET (TY II) (24 IN) (RCP) (3: 1) (P)
EA 2.000 $2,000.000 $1,800.000 $3,340.000 $2,765.000 $2,766.000 $2,500.000 $6,526.260
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 1.000 $7,100.000 $6,000.000 $6,200.000 $10,465.000 $10,010.000 $9,300.000 $1,307.900
GRATE & FRAME
EA 1.000 $2,500.000 $2,500.000 $7,400.000 $3,150.000 $4,533.000 $1,500.000 $5,356.080
JACK BOR OR TUN PIPE(36 IN)(RC)(CL III)
LF 87.000 $1,350.000 $1,500.000 $1,280.000 $900.000 $2,062.000 $1,600.000 $389.290
REMOVE STRUCTURE (STEEL GRID DECK)
EA 2.000 $25,000.000 $5,000.000 $13,500.000 $35,000.000 $50,000.000 $31,000.000 $50,652.880
MOBILIZATION
LS 1.000 $740,000.000 $700,000.000 $460,000.000 $800,000.000 $665,319.710 $930,000.000 $928,991.820
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $13,000.000 $5,000.000 $4,000.000 $25,000.000 $7,116.000 $8,000.000 $8,714.580
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 20.000 $34.000 $60.000 $35.050 $32.470 $33.000 $29.520 $50.930
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 380.000 $95.000 $60.000 $56.900 $52.730 $54.000 $47.940 $109.810
ROCK FILTER DAMS (REMOVE)
LF 400.000 $11.000 $10.000 $17.950 $16.650 $17.000 $15.140 $20.170
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 312.000 $29.000 $30.000 $21.250 $19.670 $20.000 $17.880 $23.130
CONSTRUCTION EXITS (REMOVE)
SY 312.000 $8.000 $10.000 $8.650 $8.030 $8.000 $7.300 $8.800
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,265.000 $3.500 $10.000 $3.250 $2.990 $3.000 $5.000 $4.540
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,265.000 $0.750 $1.000 $1.200 $1.100 $1.130 $1.000 $0.350
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 240.000 $5.850 $5.000 $6.900 $6.390 $7.000 $5.810 $8.880
BIODEG EROSN CONT LOGS (REMOVE)
LF 240.000 $1.600 $1.000 $2.000 $1.850 $1.910 $1.690 $1.170
CONSTRUCTING DETOURS
SY 20.000 $70.000 $50.000 $218.000 $200.000 $210.000 $240.000 $83.230
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 720.000 $70.000 $50.000 $18.500 $30.000 $31.000 $21.000 $84.420
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 1,720.000 $70.000 $50.000 $19.300 $25.000 $23.000 $17.000 $78.800
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 80.000 $65.000 $50.000 $19.150 $25.000 $52.000 $18.000 $79.440
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 720.000 $14.250 $20.000 $18.500 $20.000 $16.000 $20.000 $13.140
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 1,720.000 $10.500 $20.000 $19.300 $20.000 $11.000 $16.000 $11.390
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 40.000 $15.500 $20.000 $19.150 $20.000 $45.000 $40.000 $14.020
CONC CURB (TY C1)
LF 35.000 $95.000 $120.000 $213.000 $125.000 $265.000 $140.000 $134.340
CONC CURB (TY F3)
LF 520.000 $225.000 $250.000 $370.000 $205.000 $219.000 $380.000 $226.500
CONC CURB (TY C2)
LF 67.000 $160.000 $140.000 $119.000 $200.000 $169.000 $150.000 $251.160
INTERSECTIONS (ACP)
SY 223.000 $55.000 $80.000 $123.000 $50.000 $135.000 $52.000 $47.700
DRIVEWAYS (CONC)
SY 1,416.000 $113.120 $80.000 $133.000 $85.000 $103.000 $95.000 $116.820
CONC SIDEWALKS (6")
SY 3,774.000 $88.000 $80.000 $72.500 $68.000 $92.000 $75.000 $92.290
CURB RAMPS (TY 1)
EA 2.000 $2,250.000 $2,000.000 $2,250.000 $1,800.000 $2,265.000 $2,300.000 $2,015.100
CONCRETE SIDEWALK (STEPS)
SY 140.000 $250.000 $250.000 $880.000 $165.000 $347.000 $270.000 $131.420
MTL W-BEAM GD FEN (TIM POST)
LF 464.000 $26.900 $30.000 $26.950 $27.500 $24.000 $23.710 $28.200
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 7.000 $2,350.000 $2,500.000 $1,490.000 $2,090.000 $1,500.000 $1,314.960 $327.090
REMOVE METAL BEAM GUARD FENCE
LF 1,517.000 $3.000 $10.000 $3.300 $2.750 $3.000 $2.920 $2.920
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $300.000 $350.000 $131.000 $275.000 $116.000 $115.600 $233.630
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 6.000 $260.000 $350.000 $131.000 $275.000 $650.000 $115.600 $759.310
GUARDRAIL END TREATMENT (INSTALL)
EA 7.000 $3,320.000 $3,500.000 $2,590.000 $3,300.000 $2,300.000 $2,276.690 $3,902.870
MAILBOX INSTALL-S (TWG-POST) TY 1
EA 2.000 $330.000 $350.000 $800.000 $286.000 $260.000 $285.000 $332.930
REPLACE LUMINAIRE W/LED (250W EQ)
EA 1.000 $600.000 $1,000.000 $1,130.000 $1,155.000 $1,050.000 $1,050.000 $637.020
REMOVE GROUND BOX
EA 1.000 $295.000 $500.000 $580.000 $588.500 $535.000 $535.000 $266.840
REMOVE ELECTRICAL SERVICES
EA 1.000 $700.000 $2,500.000 $1,070.000 $1,089.000 $900.000 $990.000 $553.730
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 47.000 $730.000 $800.000 $840.000 $775.500 $705.000 $655.000 $765.150
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $900.000 $800.000 $1,120.000 $1,023.000 $930.000 $760.000 $887.810
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $1,070.000 $800.000 $1,410.000 $1,169.300 $1,063.000 $945.000 $1,103.920
REMOVE SM RD SN SUP&AM
EA 3.000 $110.000 $120.000 $140.000 $159.500 $145.000 $115.000 $134.340
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 64.000 $38.500 $40.000 $38.150 $38.500 $35.000 $26.500 $30.960
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 2,881.000 $0.890 $1.000 $1.100 $1.100 $1.000 $1.000 $2.220
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 5,125.000 $0.950 $1.000 $1.100 $1.100 $1.000 $1.000 $2.220
REFL PAV MRK TY I (W)8"(LNDP)(100MIL)
LF 615.000 $2.000 $3.000 $2.150 $2.200 $2.000 $2.000 $2.920
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 274.000 $10.000 $10.000 $9.950 $10.120 $9.000 $9.200 $5.960
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 9.000 $153.150 $200.000 $189.000 $192.500 $175.000 $175.000 $192.750
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
EA 2.000 $321.580 $350.000 $380.000 $385.000 $350.000 $350.000 $496.470
PAVEMENT SEALER 6"
LF 15,199.000 $0.250 $1.000 $0.450 $0.440 $0.400 $0.400 $0.490
PAVEMENT SEALER 8"
LF 475.000 $0.550 $1.000 $0.800 $0.790 $0.720 $0.720 $0.580
PAVEMENT SEALER 24"
LF 274.000 $2.500 $4.000 $2.150 $2.200 $2.000 $2.000 $1.050
PAVEMENT SEALER (ARROW)
EA 7.000 $45.070 $70.000 $72.400 $73.700 $67.000 $67.000 $103.970
PAVEMENT SEALER (WORD)
EA 3.000 $57.180 $70.000 $84.200 $85.800 $78.000 $78.000 $87.610
PAVEMENT SEALER (MED NOSE)
EA 2.000 $103.000 $100.000 $162.000 $165.000 $150.000 $150.000 $251.160
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 6,127.000 $0.620 $1.000 $1.200 $1.210 $1.100 $1.100 $1.160
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 1,740.000 $0.690 $1.000 $1.450 $1.480 $1.350 $1.350 $1.230
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 7,272.000 $0.660 $1.000 $1.200 $1.210 $1.100 $1.100 $1.160
ELIM EXT PAV MRK & MRKS (4")
LF 5,090.000 $0.500 $1.000 $0.900 $0.930 $0.850 $0.850 $0.480
BACKPLATE W/REFL BRDR(5 SEC)
EA 1.000 $202.000 $300.000 $640.000 $654.500 $595.000 $595.000 $175.230
BACKPLATE W/REFL BRDR(3 SEC)
EA 6.000 $180.000 $250.000 $600.000 $616.000 $560.000 $560.000 $127.040
REMOVE PED PUSH BUTTON POST ASSEM
EA 4.000 $300.000 $300.000 $97.200 $99.000 $90.000 $90.000 $262.840
PED DETECT PUSH BUTTON (APS)
EA 4.000 $1,130.000 $1,200.000 $1,510.000 $1,540.000 $1,400.000 $1,400.000 $855.100
FULL - WIDTH MOWING
CYC 4.000 $2,650.000 $1,000.000 $2,680.000 $3,500.000 $2,399.000 $5,000.000 $2,978.840
LITTER REMOVAL
CYC 4.000 $1,750.000 $1,000.000 $3,200.000 $3,500.000 $1,459.000 $1,100.000 $1,741.750
POST AND CABLE FENCE (REMOVAL)
LF 325.000 $8.900 $4.000 $26.950 $15.000 $16.000 $15.750 $4.380
POST AND CABLE FENCE (NEW INSTALLATION)
LF 300.000 $27.000 $20.000 $4.400 $50.000 $4.000 $3.850 $21.900
LANDSCAPE AMENITY (TRASH/RECYCLE BIN)
EA 3.000 $2,850.000 $3,000.000 $1,580.000 $1,500.000 $486.000 $2,500.000 $2,496.970
SP MIXES SP-C SAC-A PG76-22
TON 1,460.000 $125.000 $180.000 $138.000 $143.000 $130.000 $122.000 $158.440
UNDERSEAL COURSE
GAL 3,170.000 $4.480 $10.000 $4.250 $4.400 $4.000 $6.000 $4.220
TEMP CONSTRUCTION ACCESS
LS 1.000 $90,000.000 $5,000.000 $180,000.000 $250,000.000 $216,693.000 $550,000.000 $242,113.440
MAINTAIN ROADWAY ILLUMINATION
EA 1.000 $604.150 $150.000 $690.000 $704.000 $640.000 $640.000 $2,028.580
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $14,285.000 $15,000.000 $11,600.000 $18,500.000 $15,343.000 $7,200.000 $15,419.900
TMA (STATIONARY)
DAY 4.000 $250.000 $300.000 $340.000 $300.000 $267.000 $650.000 $461.430
SOLAR POWERED LED WARNING SIGN
EA 1.000 $4,280.000 $7,000.000 $4,100.000 $4,180.000 $3,800.000 $3,800.000 $3,626.190
SOLAR POWERED LED ROADSIDE SIGN
EA 1.000 $4,500.000 $5,000.000 $4,100.000 $4,180.000 $3,800.000 $3,800.000 $4,008.300
Totals: $7,166,421.670 $7,171,215.500 $7,932,389.000 $8,383,708.620 $8,914,300.000 $9,356,590.520 $9,431,457.025