PREPARING ROW
|
STA
|
34.500
|
$4,500.000
|
$500.000
|
$780.000
|
$10,000.000
|
$18,950.000
|
$17,788.000
|
$27,063.990
|
|
|
PREPARING ROW(TREE)(12" TO 24" DIA)
|
EA
|
1.000
|
$1,150.000
|
$1,000.000
|
$5,300.000
|
$1,000.000
|
$4,895.000
|
$1,500.000
|
$5,718.210
|
|
|
PREPARING ROW (TREE) (36" TO 48" DIA)
|
EA
|
3.000
|
$4,400.000
|
$1,000.000
|
$6,900.000
|
$1,500.000
|
$6,375.000
|
$3,000.000
|
$7,447.110
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
1,859.000
|
$12.400
|
$30.000
|
$22.700
|
$30.000
|
$15.000
|
$20.000
|
$26.380
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
6.000
|
$20.800
|
$30.000
|
$410.000
|
$100.000
|
$159.000
|
$55.000
|
$21.900
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
16.000
|
$14.250
|
$30.000
|
$67.300
|
$100.000
|
$106.000
|
$37.000
|
$17.520
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
1,416.000
|
$29.000
|
$30.000
|
$35.650
|
$30.000
|
$14.000
|
$25.000
|
$19.710
|
|
|
REMOVING CONC (MISC)
|
SY
|
125.000
|
$45.040
|
$30.000
|
$78.900
|
$25.000
|
$53.000
|
$70.000
|
$35.050
|
|
|
REMOVING CONC (HEADWALL)
|
CY
|
1.000
|
$89.900
|
$30.000
|
$2,980.000
|
$2,500.000
|
$4,183.000
|
$590.000
|
$131.420
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
1,305.000
|
$9.230
|
$30.000
|
$15.900
|
$15.000
|
$8.000
|
$11.000
|
$19.170
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
1,968.000
|
$7.000
|
$30.000
|
$9.850
|
$15.000
|
$7.000
|
$8.000
|
$1.760
|
|
|
REMOVING STAB BASE & ASPH PAV (7"-12")
|
SY
|
196.000
|
$13.000
|
$30.000
|
$30.700
|
$25.000
|
$35.000
|
$1.000
|
$17.520
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
9,183.000
|
$13.000
|
$30.000
|
$36.000
|
$30.000
|
$37.000
|
$37.000
|
$15.680
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
1,076.000
|
$30.000
|
$50.000
|
$41.850
|
$25.000
|
$18.000
|
$19.000
|
$24.500
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
6,094.000
|
$3.200
|
$30.000
|
$6.650
|
$5.000
|
$5.000
|
$5.000
|
$5.430
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
6,094.000
|
$0.260
|
$0.150
|
$0.350
|
$0.350
|
$0.480
|
$0.320
|
$0.350
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
3,048.000
|
$0.190
|
$0.150
|
$0.350
|
$0.340
|
$0.420
|
$0.310
|
$0.330
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
3,048.000
|
$0.190
|
$0.150
|
$0.300
|
$0.330
|
$0.420
|
$0.300
|
$0.330
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
12,664.000
|
$2.360
|
$8.000
|
$2.100
|
$2.200
|
$2.000
|
$1.850
|
$1.100
|
|
|
CEM STABIL BKFL
|
CY
|
81.000
|
$113.000
|
$400.000
|
$310.000
|
$150.000
|
$286.000
|
$200.000
|
$197.130
|
|
|
CUT & RESTORING PAV
|
SY
|
106.000
|
$132.710
|
$140.000
|
$83.500
|
$100.000
|
$84.000
|
$44.000
|
$114.270
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
669.000
|
$4.000
|
$20.000
|
$13.400
|
$15.000
|
$3.000
|
$1.000
|
$8.760
|
|
|
TEMPORARY SPL SHORING
|
SF
|
2,009.000
|
$32.000
|
$40.000
|
$36.700
|
$35.000
|
$50.000
|
$48.980
|
$58.520
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
75.000
|
$180.000
|
$200.000
|
$191.000
|
$250.000
|
$150.000
|
$190.000
|
$203.260
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
1,380.000
|
$315.000
|
$300.000
|
$260.000
|
$325.000
|
$220.000
|
$330.000
|
$339.360
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
3,125.000
|
$395.000
|
$300.000
|
$410.000
|
$350.000
|
$390.000
|
$410.000
|
$490.570
|
|
|
CL C CONC (ABUT)
|
CY
|
61.700
|
$1,650.000
|
$1,500.000
|
$1,480.000
|
$1,402.800
|
$1,800.000
|
$2,500.000
|
$1,954.700
|
|
|
CL C CONC (CAP)
|
CY
|
13.000
|
$2,500.000
|
$1,600.000
|
$2,120.000
|
$1,995.000
|
$3,600.000
|
$2,300.000
|
$6,082.900
|
|
|
CL C CONC (COLUMN)
|
CY
|
12.000
|
$1,700.000
|
$1,800.000
|
$1,880.000
|
$1,799.000
|
$2,500.000
|
$2,700.000
|
$2,582.740
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
114.000
|
$580.000
|
$800.000
|
$890.000
|
$819.000
|
$894.000
|
$880.000
|
$836.830
|
|
|
CL C CONC (MISC)
|
CY
|
1.000
|
$2,614.000
|
$2,000.000
|
$2,260.000
|
$1,995.000
|
$4,352.000
|
$2,500.000
|
$1,067.590
|
|
|
REINF CONC SLAB
|
SF
|
5,992.000
|
$24.000
|
$30.000
|
$34.650
|
$42.000
|
$29.000
|
$51.000
|
$64.140
|
|
|
APPROACH SLAB
|
CY
|
20.300
|
$840.000
|
$800.000
|
$740.000
|
$917.000
|
$1,500.000
|
$750.000
|
$1,430.340
|
|
|
SHEAR KEY
|
CY
|
49.100
|
$700.000
|
$600.000
|
$700.000
|
$840.000
|
$1,800.000
|
$1,000.000
|
$525.680
|
|
|
RETAINING WALL (DRILL SHAFT) (FACIA)
|
SF
|
4,808.000
|
$80.000
|
$70.000
|
$85.000
|
$102.900
|
$97.000
|
$92.000
|
$69.750
|
|
|
RETAINING WALL (CAST - IN - PLACE)
|
SF
|
1,603.000
|
$95.000
|
$120.000
|
$150.000
|
$106.400
|
$115.000
|
$145.000
|
$74.170
|
|
|
PRESTR CONC BOX BM(4XB28)(MOD1)
|
LF
|
199.000
|
$290.000
|
$400.000
|
$370.000
|
$450.000
|
$558.000
|
$550.000
|
$363.700
|
|
|
PRESTR CONC BOX BM(4XB34)(MOD1)
|
LF
|
227.000
|
$310.000
|
$400.000
|
$370.000
|
$450.000
|
$517.000
|
$550.000
|
$378.320
|
|
|
PRESTR CONC BOX BM(5XB28)(MOD1)
|
LF
|
398.000
|
$300.000
|
$400.000
|
$350.000
|
$450.000
|
$418.000
|
$470.000
|
$372.280
|
|
|
PRESTR CONC BOX BM(5XB34)(MOD1)
|
LF
|
454.000
|
$320.000
|
$400.000
|
$350.000
|
$450.000
|
$399.000
|
$470.000
|
$365.450
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
444.000
|
$400.000
|
$400.000
|
$600.000
|
$495.000
|
$647.000
|
$720.000
|
$584.090
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
29.000
|
$456.360
|
$400.000
|
$650.000
|
$515.000
|
$659.000
|
$740.000
|
$706.750
|
|
|
RIPRAP (CONC)(DISSIPATER)
|
CY
|
3.000
|
$1,350.000
|
$400.000
|
$1,430.000
|
$2,500.000
|
$4,026.000
|
$1,600.000
|
$1,108.900
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
21.000
|
$480.000
|
$400.000
|
$2,560.000
|
$515.000
|
$831.000
|
$870.000
|
$672.870
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
57.000
|
$589.000
|
$400.000
|
$1,490.000
|
$500.000
|
$698.000
|
$960.000
|
$751.590
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
672.000
|
$16.000
|
$30.000
|
$23.250
|
$15.000
|
$19.000
|
$22.000
|
$17.810
|
|
|
RAIL (TY PR3)
|
LF
|
1,063.000
|
$180.000
|
$180.000
|
$410.000
|
$236.250
|
$452.000
|
$230.000
|
$259.740
|
|
|
RAIL (HANDRAIL)(TY B)
|
LF
|
88.000
|
$80.000
|
$200.000
|
$280.000
|
$262.500
|
$250.000
|
$140.000
|
$265.180
|
|
|
RAIL (HANDRAIL)(TY W)
|
LF
|
385.000
|
$90.000
|
$250.000
|
$63.000
|
$66.150
|
$63.000
|
$66.000
|
$102.170
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS)
|
LF
|
822.000
|
$68.770
|
$100.000
|
$111.000
|
$95.000
|
$81.000
|
$130.000
|
$115.650
|
|
|
RAIL(PEDESTRIAN)(SPL)
|
LF
|
1,521.000
|
$225.000
|
$150.000
|
$280.000
|
$367.500
|
$349.000
|
$200.000
|
$283.020
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
40.000
|
$161.520
|
$150.000
|
$243.000
|
$200.000
|
$224.000
|
$240.000
|
$131.420
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
671.000
|
$115.000
|
$120.000
|
$153.000
|
$131.600
|
$144.000
|
$170.000
|
$176.760
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
171.000
|
$215.000
|
$220.000
|
$220.000
|
$206.220
|
$172.000
|
$81.000
|
$212.610
|
|
|
JCTBOX(COMPL)(PJB)(4FTX4FT)
|
EA
|
5.000
|
$10,300.000
|
$4,500.000
|
$5,700.000
|
$8,120.000
|
$7,514.000
|
$7,500.000
|
$2,490.660
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
2.000
|
$6,500.000
|
$4,500.000
|
$4,140.000
|
$8,078.000
|
$7,757.000
|
$8,400.000
|
$2,902.050
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
2.000
|
$10,650.000
|
$6,000.000
|
$5,500.000
|
$9,611.000
|
$9,967.000
|
$9,500.000
|
$4,456.720
|
|
|
INL(CMP)(PAZD-CZ)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
1.000
|
$4,000.000
|
$5,000.000
|
$5,400.000
|
$10,801.000
|
$8,824.000
|
$8,900.000
|
$3,738.400
|
|
|
INL(CMP)(PAZD-CZ)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
1.000
|
$13,000.000
|
$6,000.000
|
$6,000.000
|
$11,641.000
|
$9,763.000
|
$9,600.000
|
$4,360.470
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (P)
|
EA
|
2.000
|
$2,000.000
|
$1,800.000
|
$3,340.000
|
$2,765.000
|
$2,766.000
|
$2,500.000
|
$6,526.260
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$7,100.000
|
$6,000.000
|
$6,200.000
|
$10,465.000
|
$10,010.000
|
$9,300.000
|
$1,307.900
|
|
|
GRATE & FRAME
|
EA
|
1.000
|
$2,500.000
|
$2,500.000
|
$7,400.000
|
$3,150.000
|
$4,533.000
|
$1,500.000
|
$5,356.080
|
|
|
JACK BOR OR TUN PIPE(36 IN)(RC)(CL III)
|
LF
|
87.000
|
$1,350.000
|
$1,500.000
|
$1,280.000
|
$900.000
|
$2,062.000
|
$1,600.000
|
$389.290
|
|
|
REMOVE STRUCTURE (STEEL GRID DECK)
|
EA
|
2.000
|
$25,000.000
|
$5,000.000
|
$13,500.000
|
$35,000.000
|
$50,000.000
|
$31,000.000
|
$50,652.880
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$740,000.000
|
$700,000.000
|
$460,000.000
|
$800,000.000
|
$665,319.710
|
$930,000.000
|
$928,991.820
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$13,000.000
|
$5,000.000
|
$4,000.000
|
$25,000.000
|
$7,116.000
|
$8,000.000
|
$8,714.580
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
20.000
|
$34.000
|
$60.000
|
$35.050
|
$32.470
|
$33.000
|
$29.520
|
$50.930
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
380.000
|
$95.000
|
$60.000
|
$56.900
|
$52.730
|
$54.000
|
$47.940
|
$109.810
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
400.000
|
$11.000
|
$10.000
|
$17.950
|
$16.650
|
$17.000
|
$15.140
|
$20.170
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
312.000
|
$29.000
|
$30.000
|
$21.250
|
$19.670
|
$20.000
|
$17.880
|
$23.130
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
312.000
|
$8.000
|
$10.000
|
$8.650
|
$8.030
|
$8.000
|
$7.300
|
$8.800
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,265.000
|
$3.500
|
$10.000
|
$3.250
|
$2.990
|
$3.000
|
$5.000
|
$4.540
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,265.000
|
$0.750
|
$1.000
|
$1.200
|
$1.100
|
$1.130
|
$1.000
|
$0.350
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
240.000
|
$5.850
|
$5.000
|
$6.900
|
$6.390
|
$7.000
|
$5.810
|
$8.880
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
240.000
|
$1.600
|
$1.000
|
$2.000
|
$1.850
|
$1.910
|
$1.690
|
$1.170
|
|
|
CONSTRUCTING DETOURS
|
SY
|
20.000
|
$70.000
|
$50.000
|
$218.000
|
$200.000
|
$210.000
|
$240.000
|
$83.230
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
720.000
|
$70.000
|
$50.000
|
$18.500
|
$30.000
|
$31.000
|
$21.000
|
$84.420
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
1,720.000
|
$70.000
|
$50.000
|
$19.300
|
$25.000
|
$23.000
|
$17.000
|
$78.800
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$65.000
|
$50.000
|
$19.150
|
$25.000
|
$52.000
|
$18.000
|
$79.440
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
720.000
|
$14.250
|
$20.000
|
$18.500
|
$20.000
|
$16.000
|
$20.000
|
$13.140
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
1,720.000
|
$10.500
|
$20.000
|
$19.300
|
$20.000
|
$11.000
|
$16.000
|
$11.390
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$15.500
|
$20.000
|
$19.150
|
$20.000
|
$45.000
|
$40.000
|
$14.020
|
|
|
CONC CURB (TY C1)
|
LF
|
35.000
|
$95.000
|
$120.000
|
$213.000
|
$125.000
|
$265.000
|
$140.000
|
$134.340
|
|
|
CONC CURB (TY F3)
|
LF
|
520.000
|
$225.000
|
$250.000
|
$370.000
|
$205.000
|
$219.000
|
$380.000
|
$226.500
|
|
|
CONC CURB (TY C2)
|
LF
|
67.000
|
$160.000
|
$140.000
|
$119.000
|
$200.000
|
$169.000
|
$150.000
|
$251.160
|
|
|
INTERSECTIONS (ACP)
|
SY
|
223.000
|
$55.000
|
$80.000
|
$123.000
|
$50.000
|
$135.000
|
$52.000
|
$47.700
|
|
|
DRIVEWAYS (CONC)
|
SY
|
1,416.000
|
$113.120
|
$80.000
|
$133.000
|
$85.000
|
$103.000
|
$95.000
|
$116.820
|
|
|
CONC SIDEWALKS (6")
|
SY
|
3,774.000
|
$88.000
|
$80.000
|
$72.500
|
$68.000
|
$92.000
|
$75.000
|
$92.290
|
|
|
CURB RAMPS (TY 1)
|
EA
|
2.000
|
$2,250.000
|
$2,000.000
|
$2,250.000
|
$1,800.000
|
$2,265.000
|
$2,300.000
|
$2,015.100
|
|
|
CONCRETE SIDEWALK (STEPS)
|
SY
|
140.000
|
$250.000
|
$250.000
|
$880.000
|
$165.000
|
$347.000
|
$270.000
|
$131.420
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
464.000
|
$26.900
|
$30.000
|
$26.950
|
$27.500
|
$24.000
|
$23.710
|
$28.200
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
7.000
|
$2,350.000
|
$2,500.000
|
$1,490.000
|
$2,090.000
|
$1,500.000
|
$1,314.960
|
$327.090
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,517.000
|
$3.000
|
$10.000
|
$3.300
|
$2.750
|
$3.000
|
$2.920
|
$2.920
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$300.000
|
$350.000
|
$131.000
|
$275.000
|
$116.000
|
$115.600
|
$233.630
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
6.000
|
$260.000
|
$350.000
|
$131.000
|
$275.000
|
$650.000
|
$115.600
|
$759.310
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
7.000
|
$3,320.000
|
$3,500.000
|
$2,590.000
|
$3,300.000
|
$2,300.000
|
$2,276.690
|
$3,902.870
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 1
|
EA
|
2.000
|
$330.000
|
$350.000
|
$800.000
|
$286.000
|
$260.000
|
$285.000
|
$332.930
|
|
|
REPLACE LUMINAIRE W/LED (250W EQ)
|
EA
|
1.000
|
$600.000
|
$1,000.000
|
$1,130.000
|
$1,155.000
|
$1,050.000
|
$1,050.000
|
$637.020
|
|
|
REMOVE GROUND BOX
|
EA
|
1.000
|
$295.000
|
$500.000
|
$580.000
|
$588.500
|
$535.000
|
$535.000
|
$266.840
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
1.000
|
$700.000
|
$2,500.000
|
$1,070.000
|
$1,089.000
|
$900.000
|
$990.000
|
$553.730
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
47.000
|
$730.000
|
$800.000
|
$840.000
|
$775.500
|
$705.000
|
$655.000
|
$765.150
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$900.000
|
$800.000
|
$1,120.000
|
$1,023.000
|
$930.000
|
$760.000
|
$887.810
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$1,070.000
|
$800.000
|
$1,410.000
|
$1,169.300
|
$1,063.000
|
$945.000
|
$1,103.920
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
3.000
|
$110.000
|
$120.000
|
$140.000
|
$159.500
|
$145.000
|
$115.000
|
$134.340
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
64.000
|
$38.500
|
$40.000
|
$38.150
|
$38.500
|
$35.000
|
$26.500
|
$30.960
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
2,881.000
|
$0.890
|
$1.000
|
$1.100
|
$1.100
|
$1.000
|
$1.000
|
$2.220
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
5,125.000
|
$0.950
|
$1.000
|
$1.100
|
$1.100
|
$1.000
|
$1.000
|
$2.220
|
|
REFL PAV MRK TY I (W)8"(LNDP)(100MIL)
|
LF
|
615.000
|
$2.000
|
$3.000
|
$2.150
|
$2.200
|
$2.000
|
$2.000
|
$2.920
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
274.000
|
$10.000
|
$10.000
|
$9.950
|
$10.120
|
$9.000
|
$9.200
|
$5.960
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
9.000
|
$153.150
|
$200.000
|
$189.000
|
$192.500
|
$175.000
|
$175.000
|
$192.750
|
|
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
|
EA
|
2.000
|
$321.580
|
$350.000
|
$380.000
|
$385.000
|
$350.000
|
$350.000
|
$496.470
|
|
|
PAVEMENT SEALER 6"
|
LF
|
15,199.000
|
$0.250
|
$1.000
|
$0.450
|
$0.440
|
$0.400
|
$0.400
|
$0.490
|
|
|
PAVEMENT SEALER 8"
|
LF
|
475.000
|
$0.550
|
$1.000
|
$0.800
|
$0.790
|
$0.720
|
$0.720
|
$0.580
|
|
|
PAVEMENT SEALER 24"
|
LF
|
274.000
|
$2.500
|
$4.000
|
$2.150
|
$2.200
|
$2.000
|
$2.000
|
$1.050
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
7.000
|
$45.070
|
$70.000
|
$72.400
|
$73.700
|
$67.000
|
$67.000
|
$103.970
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
3.000
|
$57.180
|
$70.000
|
$84.200
|
$85.800
|
$78.000
|
$78.000
|
$87.610
|
|
|
PAVEMENT SEALER (MED NOSE)
|
EA
|
2.000
|
$103.000
|
$100.000
|
$162.000
|
$165.000
|
$150.000
|
$150.000
|
$251.160
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
6,127.000
|
$0.620
|
$1.000
|
$1.200
|
$1.210
|
$1.100
|
$1.100
|
$1.160
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
1,740.000
|
$0.690
|
$1.000
|
$1.450
|
$1.480
|
$1.350
|
$1.350
|
$1.230
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
7,272.000
|
$0.660
|
$1.000
|
$1.200
|
$1.210
|
$1.100
|
$1.100
|
$1.160
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
5,090.000
|
$0.500
|
$1.000
|
$0.900
|
$0.930
|
$0.850
|
$0.850
|
$0.480
|
|
|
BACKPLATE W/REFL BRDR(5 SEC)
|
EA
|
1.000
|
$202.000
|
$300.000
|
$640.000
|
$654.500
|
$595.000
|
$595.000
|
$175.230
|
|
|
BACKPLATE W/REFL BRDR(3 SEC)
|
EA
|
6.000
|
$180.000
|
$250.000
|
$600.000
|
$616.000
|
$560.000
|
$560.000
|
$127.040
|
|
|
REMOVE PED PUSH BUTTON POST ASSEM
|
EA
|
4.000
|
$300.000
|
$300.000
|
$97.200
|
$99.000
|
$90.000
|
$90.000
|
$262.840
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
4.000
|
$1,130.000
|
$1,200.000
|
$1,510.000
|
$1,540.000
|
$1,400.000
|
$1,400.000
|
$855.100
|
|
|
FULL - WIDTH MOWING
|
CYC
|
4.000
|
$2,650.000
|
$1,000.000
|
$2,680.000
|
$3,500.000
|
$2,399.000
|
$5,000.000
|
$2,978.840
|
|
|
LITTER REMOVAL
|
CYC
|
4.000
|
$1,750.000
|
$1,000.000
|
$3,200.000
|
$3,500.000
|
$1,459.000
|
$1,100.000
|
$1,741.750
|
|
|
POST AND CABLE FENCE (REMOVAL)
|
LF
|
325.000
|
$8.900
|
$4.000
|
$26.950
|
$15.000
|
$16.000
|
$15.750
|
$4.380
|
|
|
POST AND CABLE FENCE (NEW INSTALLATION)
|
LF
|
300.000
|
$27.000
|
$20.000
|
$4.400
|
$50.000
|
$4.000
|
$3.850
|
$21.900
|
|
|
LANDSCAPE AMENITY (TRASH/RECYCLE BIN)
|
EA
|
3.000
|
$2,850.000
|
$3,000.000
|
$1,580.000
|
$1,500.000
|
$486.000
|
$2,500.000
|
$2,496.970
|
|
|
SP MIXES SP-C SAC-A PG76-22
|
TON
|
1,460.000
|
$125.000
|
$180.000
|
$138.000
|
$143.000
|
$130.000
|
$122.000
|
$158.440
|
|
|
UNDERSEAL COURSE
|
GAL
|
3,170.000
|
$4.480
|
$10.000
|
$4.250
|
$4.400
|
$4.000
|
$6.000
|
$4.220
|
|
|
TEMP CONSTRUCTION ACCESS
|
LS
|
1.000
|
$90,000.000
|
$5,000.000
|
$180,000.000
|
$250,000.000
|
$216,693.000
|
$550,000.000
|
$242,113.440
|
|
|
MAINTAIN ROADWAY ILLUMINATION
|
EA
|
1.000
|
$604.150
|
$150.000
|
$690.000
|
$704.000
|
$640.000
|
$640.000
|
$2,028.580
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$14,285.000
|
$15,000.000
|
$11,600.000
|
$18,500.000
|
$15,343.000
|
$7,200.000
|
$15,419.900
|
|
|
TMA (STATIONARY)
|
DAY
|
4.000
|
$250.000
|
$300.000
|
$340.000
|
$300.000
|
$267.000
|
$650.000
|
$461.430
|
|
|
SOLAR POWERED LED WARNING SIGN
|
EA
|
1.000
|
$4,280.000
|
$7,000.000
|
$4,100.000
|
$4,180.000
|
$3,800.000
|
$3,800.000
|
$3,626.190
|
|
|
SOLAR POWERED LED ROADSIDE SIGN
|
EA
|
1.000
|
$4,500.000
|
$5,000.000
|
$4,100.000
|
$4,180.000
|
$3,800.000
|
$3,800.000
|
$4,008.300
|
|
Totals: |
$7,166,421.670
|
$7,171,215.500
|
$7,932,389.000
|
$8,383,708.620
|
$8,914,300.000
|
$9,356,590.520
|
$9,431,457.025
|