COLORADO CS (0913-26-065)

Items: 45

County: COLORADO
Length: N/A
Highway: CS
District: YOAKUM
Control Number: 0913-26-065
DBE Goal: N/A
Project: STP 2021(658)TAPS
Guaranty: N/A
Time: 60 WORKING DAYS
Engineer's Estimate: $311,972.00
Date: 10/08/2021 (4 years ago)
Contract Number: N/A
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (4)
E
Engineer's Estimate
$311,972.00
$411,526.00
Over/Under Est: 31.91% $99,554.00
Over/Under Est: 49.29% $153,783.00
Amt Left: 13.18% $54,229.00
Over/Under Est: 74.34% $231,904.40
Amt Left: 32.16% $132,350.40
Delta: -16.77% -$78,121.40
$570,643.37
Over/Under Est: 82.91% $258,671.37
Amt Left: 38.67% $159,117.37
Delta: -4.92% -$26,766.97
Subcontractor Percentage Amount
INTERSTATE BARRICADES & MARKINGS, INC. 2.38% $9,794.32
STRIPE LINES, INC. 1.31% $5,390.99
CEN TEX HYDROSEED, INC. 1.05% $4,321.02
LONESTAR TRAFFIC SAFETY, LLC 0.76% $3,127.60
Total: 5.50% $22,633.93

Bid Items & Bid Tabulations

45 Total 0 of 45
COLORADO  |  CS  |  YOAKUM  |  0913-26-065  |  10/08/2021  |  $311,972.00  |  STP 2021(658)TAPS  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  60 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
FNH CONSTRUCTION, LLC
PROJECT ALLIED RESOURCES, LLC
SB CONTRACTORS LLC
PREPARING ROW
STA 2.000 $2,500.000 $1,500.000 $15,000.000 $7,790.000 $6,000.000
REMOVING CONC (SIDEWALKS)
SY 32.000 $35.000 $40.000 $20.000 $33.300 $148.060
REMOVING CONC (CURB AND GUTTER)
LF 44.000 $25.000 $30.000 $20.000 $22.800 $53.840
SUBGRADE WIDENING (ORD COMP)
STA 11.700 $1,200.000 $1,300.000 $450.000 $1,580.000 $5,648.740
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 62.000 $45.000 $140.000 $50.000 $88.000 $69.830
BLOCK SODDING
SY 441.000 $6.000 $5.000 $6.000 $9.800 $5.880
VEGETATIVE WATERING
MG 3.600 $30.000 $155.000 $500.000 $121.000 $47.110
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 125.000 $55.000 $160.000 $200.000 $294.000 $235.990
ASPH (RC-250)
GAL 151.000 $18.000 $20.000 $10.000 $9.500 $42.380
AGGR(TY-E GR-5 SAC-B)
CY 6.000 $450.000 $2,000.000 $350.000 $202.000 $3,337.100
AGGR(TY-PE GR-3 SAC-B)
CY 9.000 $425.000 $1,400.000 $350.000 $200.000 $2,266.740
AGGR(TY-PE GR-4 SAC-B)
CY 7.000 $425.000 $1,750.000 $350.000 $218.000 $2,884.610
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 605.000 $20.000 $11.000 $10.000 $8.800 $13.730
CEM STABIL BKFL
CY 22.000 $75.000 $180.000 $350.000 $322.000 $110.300
TRENCH EXCAVATION PROTECTION
LF 23.000 $5.000 $95.000 $10.000 $118.000 $58.040
RC PIPE (CL III)(12 IN)
LF 3.000 $55.000 $950.000 $85.000 $179.000 $764.100
RC PIPE (CL III)(15 IN)
LF 11.000 $65.000 $280.000 $95.000 $184.000 $221.990
RC PIPE (CL III)(18 IN)
LF 110.000 $75.000 $145.000 $110.000 $185.000 $110.050
INLET (COMPL)(PCO)(3FT)(NONE)
EA 5.000 $4,500.000 $5,700.000 $8,500.000 $9,550.000 $5,517.210
INLET (COMPL)(PSL)(SL)(6FTX6FT)
EA 1.000 $6,000.000 $2,800.000 $12,500.000 $19,600.000 $11,164.090
INLET (COMPL)(PSL)(RC)(3FTX3FT)
EA 1.000 $3,750.000 $4,000.000 $8,500.000 $8,050.000 $4,981.380
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 2.000 $1,200.000 $1,680.000 $1,850.000 $1,940.000 $3,777.280
REMOV STR (INLET)
EA 3.000 $650.000 $1,110.000 $500.000 $1,150.000 $2,704.730
REMOV STR (PIPE)
LF 175.000 $16.000 $44.000 $30.000 $38.100 $64.490
MOBILIZATION
LS 1.000 $26,000.000 $39,000.000 $46,500.000 $60,000.000 $58,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $3,750.000 $1,650.000 $8,500.000 $5,170.000 $2,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 100.000 $5.000 $9.000 $4.000 $7.000 $5.880
TEMP SEDMT CONT FENCE (REMOVE)
LF 100.000 $2.000 $5.000 $2.000 $1.740 $2.350
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 50.000 $10.000 $10.000 $18.000 $20.600 $11.780
BIODEG EROSN CONT LOGS (REMOVE)
LF 50.000 $2.000 $5.000 $9.000 $5.300 $2.350
CONC CURB & GUTTER (TY II)
LF 662.000 $30.000 $45.000 $55.000 $38.600 $32.960
DRIVEWAYS (CONC)
SY 290.000 $95.000 $140.000 $85.000 $141.000 $141.580
DRIVEWAYS (BASE)
SY 234.000 $45.000 $30.000 $65.000 $83.000 $74.850
CONC SIDEWALKS (5")
SY 568.000 $80.000 $86.000 $68.000 $105.000 $103.300
CURB RAMPS (TY 2)
SY 22.000 $200.000 $335.000 $220.000 $638.000 $266.390
CURB RAMPS (TY 7)
SY 23.000 $225.000 $315.000 $220.000 $668.000 $251.140
CURB RAMPS (TY 10)
SY 64.000 $225.000 $330.000 $220.000 $528.000 $245.900
CONC SIDEWALKS (SPECIAL) (TYPE A)
SY 2.000 $300.000 $420.000 $500.000 $2,360.000 $2,790.010
MAILBOX INSTALL-S (WC-POST) TY 3
EA 6.000 $200.000 $300.000 $850.000 $538.000 $412.180
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 7.000 $575.000 $500.000 $850.000 $955.000 $588.830
REMOVE SM RD SN SUP&AM
EA 7.000 $100.000 $120.000 $250.000 $242.000 $117.770
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 246.000 $20.000 $35.000 $35.000 $39.000 $53.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 24.000 $45.000 $50.000 $850.000 $102.000 $100.100
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $3,500.000 $10,000.000 $2,630.000 $9,000.000
TMA (STATIONARY)
DAY 5.000 $300.000 $300.000 $350.000 $440.000 $367.190
Totals: $311,972.000 $411,526.000 $465,755.000 $543,876.400 $570,643.384