COLORADO FM 109 (0716-02-045)

Items: 83

County: COLORADO
Length: N/A
Highway: FM 109
District: YOAKUM
Control Number: 0716-02-045
DBE Goal: N/A
Project: BR 2022(323)
Guaranty: N/A
Time: 246 WORKING DAYS
Engineer's Estimate: $6,400,527.75
Date: 02/04/2022 (4 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (3)
E
Engineer's Estimate
$6,400,527.75
$6,985,517.21
Over/Under Est: 9.14% $584,989.46
Over/Under Est: 14.84% $949,972.12
Amt Left: 5.22% $364,982.66
Over/Under Est: 23.52% $1,505,664.78
Amt Left: 13.18% $920,675.32
Delta: -7.56% -$555,692.66
Subcontractor Percentage Amount
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. 10.30% $719,508.27
M & D FOUNDATION DRILLING INDUSTRIES, INC. 9.56% $667,815.45
HUNTER DEMOLITION & WRECKING CORPORATION 2.75% $192,101.72
SIREN STEEL, INC. 1.26% $88,017.52
FARR FOUNDATION, INC. 1.06% $74,046.48
DIIBS SPECIALISTS, LLC 0.94% $65,663.86
QUALITY TURF FARMS, L.C. 0.81% $56,582.69
HIGHWAY 1 LLC 0.61% $42,611.65
COLD CREEK CONSTRUCTION, LTD 0.53% $37,023.24
J.KRU LAND SERVICES, LLC 0.28% $19,559.45
HOUSTON SAWING & DRILLING 0.18% $12,573.93
A. L. HELMCAMP, INC. 0.16% $11,176.83
LONESTAR TRAFFIC SAFETY, LLC 0.13% $9,081.17
MTAM CORPORATION 0.06% $4,191.31
Total: 28.63% $1,999,953.57

Bid Items & Bid Tabulations

83 Total 0 of 83
COLORADO  |  FM 109  |  YOAKUM  |  0716-02-045  |  02/04/2022  |  $6,400,527.75  |  BR 2022(323)  |  BRIDGE REPL  |  246 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
NBG CONSTRUCTORS, INC.
HARPER BROTHERS CONSTRUCTION LLC
TEXAS MATERIALS GROUP, INC.
PREPARING ROW
STA 28.000 $4,000.000 $7,000.000 $2,225.000 $12,000.000
REMOVING STAB BASE AND ASPH PAV (6")
SY 870.000 $10.000 $15.000 $2.000 $4.000
EXCAVATION (ROADWAY)
CY 15,534.000 $15.000 $6.000 $12.000 $20.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 25,956.000 $20.000 $15.000 $15.000 $24.000
BLADING
HR 40.000 $100.000 $120.000 $90.000 $100.000
FURNISHING AND PLACING TOPSOIL
CY 978.000 $15.000 $37.000 $25.000 $10.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 31,237.000 $0.500 $0.310 $0.150 $0.170
BROADCAST SEED (TEMP) (WARM)
SY 7,811.000 $0.500 $0.230 $0.280 $0.170
BROADCAST SEED (TEMP) (COOL)
SY 7,811.000 $0.500 $0.230 $0.290 $0.170
VEGETATIVE WATERING
MG 89.000 $30.000 $42.000 $60.000 $30.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 8,803.000 $2.250 $0.760 $1.110 $1.200
FL BS (CML IN PLACE)(TYE GR1-2)(IN VEH)
CY 1,166.900 $52.000 $75.000 $75.000 $104.000
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
CY 2,882.600 $82.000 $80.000 $90.000 $120.000
REWORK BS MTL (TY C) (6") (ORD COMP)
SY 6,176.000 $3.000 $2.500 $10.000 $6.000
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 88.200 $200.000 $190.000 $200.000 $200.000
LIME TRT (EXST MATL)(8")
SY 5,524.000 $4.500 $2.500 $6.000 $9.000
CEMENT
TON 53.500 $210.000 $190.000 $200.000 $200.000
CEMENT TREAT(EXIST MATL)(8")
SY 5,524.000 $4.000 $2.500 $6.000 $7.000
ASPH (RC-250)
GAL 2,888.000 $5.000 $10.000 $5.150 $6.000
AGGR(TY-E GR-5 SAC-B)
CY 104.300 $200.000 $220.000 $350.000 $300.000
AGGR(TY-PE GR-3 SAC-B)
CY 170.500 $225.000 $260.000 $210.000 $320.000
AGGR(TY-PE GR-4 SAC-B)
CY 112.100 $230.000 $160.000 $210.000 $430.000
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 10,669.000 $5.500 $6.000 $4.600 $5.500
CEM STABIL BKFL
CY 154.900 $175.000 $75.000 $150.000 $260.000
DRILL SHAFT (36 IN)
LF 790.000 $250.000 $325.000 $290.000 $220.000
DRILL SHAFT (42 IN)
LF 2,880.000 $325.000 $400.000 $465.000 $310.000
CL C CONC (ABUT)
CY 58.800 $1,000.000 $1,500.000 $1,650.000 $1,800.000
CL C CONC (CAP)
CY 186.800 $1,000.000 $1,300.000 $2,000.000 $2,000.000
CL C CONC (COLUMN)
CY 125.200 $1,150.000 $1,200.000 $1,850.000 $1,100.000
REINF CONC SLAB
SF 37,260.000 $22.000 $24.000 $27.500 $27.000
RETAINING WALL (TEMP WALL)
SF 2,612.000 $15.000 $22.000 $15.000 $40.000
PRESTR CONC GIRDER (TX40)
LF 4,662.000 $150.000 $165.000 $225.000 $200.000
PRESTR CONC GIRDER (TX62)
LF 976.500 $200.000 $220.000 $225.000 $200.000
RIPRAP (CONC)(5 IN)
CY 4.000 $500.000 $1,200.000 $800.000 $1,300.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 1,365.000 $170.000 $175.000 $130.000 $175.000
RAIL (TY SSTR) (W/DRAIN SLOTS)
LF 1,660.000 $77.000 $85.000 $85.000 $83.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 224.000 $116.000 $160.000 $175.000 $180.000
CONC BOX CULV (4 FT X 4 FT)
LF 109.000 $275.000 $310.000 $425.000 $570.000
RC PIPE (CL III)(36 IN)
LF 67.000 $225.000 $120.000 $155.000 $190.000
WINGWALL (FW - 0) (HW=5 FT)
EA 2.000 $12,000.000 $6,500.000 $13,500.000 $8,000.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 2.000 $4,200.000 $2,500.000 $5,550.000 $6,200.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 2.000 $65,000.000 $100,000.000 $125,000.000 $120,000.000
REMOV STR (SMALL)
EA 1.000 $1,000.000 $300.000 $5,500.000 $900.000
REMOV STR (SMALL FENCE)
LF 1,780.000 $3.000 $2.200 $3.000 $3.500
MOBILIZATION
LS 1.000 $575,000.000 $680,000.000 $125,000.000 $640,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 17.000 $3,000.000 $3,000.000 $12,500.000 $1,900.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 4,536.000 $3.000 $3.100 $2.940 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 4,536.000 $1.000 $0.500 $0.440 $0.450
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 1,800.000 $25.000 $40.000 $25.000 $20.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 1,800.000 $10.000 $4.000 $15.000 $20.000
DRIVEWAYS (SURF TREAT)
SY 773.000 $40.000 $70.000 $40.000 $50.000
DRIVEWAYS (BASE)
SY 870.000 $25.000 $25.000 $15.000 $31.000
MTL W-BEAM GD FEN (TIM POST)
LF 825.000 $25.000 $32.000 $28.500 $23.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,900.000 $2,300.000 $2,200.000 $2,500.000
MTL BM GD FEN TRANS (31"-28")(25')
EA 3.000 $1,000.000 $1,100.000 $740.000 $1,100.000
REMOVE METAL BEAM GUARD FENCE
LF 1,800.000 $2.000 $1.200 $2.000 $2.300
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 8.000 $250.000 $230.000 $250.000 $320.000
GUARDRAIL END TREATMENT (INSTALL)
EA 5.000 $2,800.000 $3,600.000 $3,200.000 $3,200.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 2.000 $1,200.000 $1,200.000 $1,265.000 $1,200.000
GUARDRAIL END TREATMENT (REMOVE)
EA 9.000 $500.000 $330.000 $150.000 $320.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,040.000 $800.000 $900.000 $1,100.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $11,000.000 $13,000.000 $10,250.000 $9,000.000
GATE (REMOVE)
EA 2.000 $500.000 $200.000 $250.000 $350.000
WIRE FENCE (TY A)
LF 495.000 $22.000 $17.000 $5.000 $25.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 7.000 $250.000 $280.000 $350.000 $220.000
MAILBOX INSTALL-D (WC-POST) TY 3
EA 1.000 $300.000 $350.000 $420.000 $240.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 1.000 $815.000 $725.000 $735.000 $840.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 3.000 $450.000 $850.000 $465.000 $500.000
REMOVE SM RD SN SUP&AM
EA 4.000 $100.000 $65.000 $90.000 $125.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 158.000 $20.000 $22.000 $23.500 $21.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 48.000 $27.000 $40.000 $32.000 $25.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 7,436.000 $1.000 $1.250 $0.700 $0.700
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 14,952.000 $1.000 $1.150 $0.700 $0.700
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 392.000 $2.000 $1.050 $1.000 $1.700
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 7,836.000 $1.000 $1.400 $1.250 $1.250
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
LF 710.000 $1.000 $1.500 $2.250 $2.250
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 4,532.000 $1.000 $1.500 $1.250 $1.250
REFL PAV MRKR TY II-A-A
EA 94.000 $6.000 $6.000 $5.000 $5.000
AMPHIBIAN/REPTILE EXCLUSION FENCE INST
LF 8,318.000 $6.000 $4.000 $2.940 $3.000
AMPHIBIAN/REPTILE EXCLUSION FENCE REM
LF 8,318.000 $3.000 $0.500 $0.440 $0.450
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $18,000.000 $7,500.000 $16,700.000
TMA (STATIONARY)
DAY 20.000 $300.000 $120.000 $450.000 $200.000
TMA (MOBILE OPERATION)
DAY 20.000 $400.000 $125.000 $100.000 $200.000
Totals: $6,400,527.750 $6,985,517.210 $7,350,499.870 $7,906,192.530