COLORADO US 90A (0446-03-047)

Items: 97

County: COLORADO
Length: N/A
Highway: US 90A
District: YOAKUM
Control Number: 0446-03-047
DBE Goal: N/A
Project: BR 2019(096)
Guaranty: N/A
Time: 396 WORKING DAYS
Engineer's Estimate: $11,245,966.30
Date: 02/07/2020 (6 years ago)
Contract Number: N/A
Type: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$11,245,966.30
$12,487,777.17
Over/Under Est: 11.04% $1,241,810.87
Over/Under Est: 27.63% $3,107,766.95
Amt Left: 14.94% $1,865,956.08

Bid Items & Bid Tabulations

97 Total 0 of 97
COLORADO  |  US 90A  |  YOAKUM  |  0446-03-047  |  02/07/2020  |  $11,245,966.30  |  BR 2019(096)  |  REPLACE BRIDGE AND APPROACHES  |  396 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ZACHRY CONSTRUCTION CORPORATION
HARPER BROTHERS CONSTRUCTION LLC
PREPARING ROW
STA 24.000 $15,000.000 $45,125.000 $10,000.000
REMOVING CONC (PAV)
SY 113.000 $16.000 $25.000 $20.000
REMOVING CONC (CURB AND GUTTER)
LF 40.000 $15.000 $12.000 $15.000
REMOVING CONC (FLUME)
SY 52.000 $20.000 $15.000 $20.000
EXCAVATION (ROADWAY)
CY 6,547.000 $15.000 $10.900 $10.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 22,168.000 $18.000 $20.000 $15.000
BLADING
HR 100.000 $100.000 $225.000 $90.000
FURNISHING AND PLACING TOPSOIL (4")
SY 66,387.000 $1.500 $0.800 $0.250
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 66,387.000 $0.500 $0.350 $0.270
CELL FBR MLCH SEED(TEMP)(WARM)
SY 16,597.000 $0.500 $0.350 $0.260
CELL FBR MLCH SEED(TEMP)(COOL)
SY 16,597.000 $0.500 $0.350 $0.260
VEGETATIVE WATERING
MG 1,394.000 $35.000 $12.000 $29.400
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
CY 3,709.000 $70.000 $100.000 $90.000
FL BS (CMP IN PLC)(RAP) (6")
SY 2,284.000 $20.000 $4.000 $5.000
LIME TRT (EXST MATL) (6")
SY 14,484.000 $2.500 $6.000 $2.500
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 174.000 $150.000 $210.000 $200.000
SALV, HAUL & STKPL RCL APH PV (4 TO 6")
SY 2,692.000 $4.500 $2.180 $5.500
SLV,HAUL & STKPL RCL APH PV (10 TO 12")
SY 8,614.000 $6.250 $5.520 $5.000
PRIME COAT (MC-30)
GAL 3,865.000 $4.500 $5.640 $5.500
AGGR(TY-PE GR-3 SAC-B)
CY 196.000 $200.000 $230.630 $225.000
AGGR(TY-PE GR-4 SAC-B)
CY 16.000 $200.000 $369.000 $360.000
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 7,382.000 $5.000 $7.180 $7.000
PLANE ASPH CONC PAV(0" TO 4")
SY 1,026.000 $5.000 $3.030 $5.500
CEM STABIL BKFL
CY 113.000 $150.000 $200.000 $150.000
TEMPORARY SPL SHORING
SF 1,630.000 $25.000 $25.000 $5.000
TEMPORARY SPL SHORING (COFFERDAM)
SF 6,768.000 $60.000 $185.000 $10.000
PRESTR CONC PIL (18 IN SQ)
LF 12,620.000 $90.000 $145.000 $175.000
DRILL SHAFT (24 IN)
LF 624.000 $250.000 $250.000 $370.000
DRILL SHAFT (36 IN)
LF 190.000 $300.000 $450.000 $645.000
CL C CONC (ABUT)
CY 59.000 $1,000.000 $1,300.000 $1,500.000
CL C CONC (BENT)
CY 1,172.900 $950.000 $1,000.000 $1,650.000
CL C CONC (BENT)(MASS)
CY 81.600 $1,100.000 $1,500.000 $1,650.000
CL C CONC (MISC)
CY 73.000 $800.000 $800.000 $850.000
REINF CONC SLAB
SF 62,040.000 $18.000 $15.000 $27.500
PRESTR CONC GIRDER (TX40)
LF 5,460.000 $150.000 $135.000 $175.000
PRESTR CONC GIRDER (TX70)
LF 2,601.120 $225.000 $164.500 $285.000
RIPRAP (CONC)(5 IN)
CY 2.400 $600.000 $450.000 $850.000
RIPRAP (CONC)(CL B)(5 IN)
CY 111.000 $750.000 $450.000 $625.000
RIPRAP (MOW STRIP)(4 IN)
CY 38.000 $450.000 $480.000 $650.000
RAIL (TY SSTR)
LF 2,740.000 $80.000 $38.000 $60.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 407.000 $100.000 $115.000 $175.000
CONC BOX CULV (3 FT X 3 FT)
LF 20.000 $500.000 $364.820 $1,050.000
RC PIPE (CL III)(18 IN)
LF 72.000 $70.000 $97.180 $115.000
RC PIPE (CL III)(30 IN)
LF 192.000 $125.000 $110.000 $125.000
WINGWALL (FW - S) (HW=6 FT)
EA 1.000 $12,000.000 $18,500.000 $20,500.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 6.000 $1,200.000 $2,500.000 $1,300.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 4.000 $2,500.000 $4,400.000 $3,175.000
REMOV STR (PIPE)
LF 130.000 $20.000 $10.000 $25.000
REMOV STR (BRIDGE 1000 FT OR GREATER)
EA 1.000 $600,000.000 $190,000.000 $1,000,000.000
REMOV STR (RET WALL)
LF 45.000 $150.000 $65.000 $2.000
MOBILIZATION
LS 1.000 $1,000,000.000 $900,000.000 $1,225,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 27.000 $2,500.000 $3,000.000 $9,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 267.000 $30.000 $22.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 267.000 $10.000 $7.000 $7.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 8,575.000 $3.000 $1.750 $1.750
TEMP SEDMT CONT FENCE (REMOVE)
LF 8,575.000 $1.000 $0.600 $0.450
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 3,450.000 $55.000 $10.000 $10.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 810.000 $10.000 $3.000 $4.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 3,450.000 $20.000 $8.000 $6.000
CONC CURB & GUTTER (TY II)
LF 634.000 $35.000 $30.000 $35.000
DRIVEWAYS (SURF TREAT)
SY 665.000 $20.000 $35.000 $65.000
RUMBLE STRIPS (SHOULDER)
LF 6,300.000 $6.000 $0.650 $1.500
MTL W-BEAM GD FEN (TIM POST)
LF 325.000 $25.000 $24.320 $18.970
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 6.000 $1,600.000 $1,492.000 $1,645.000
REMOVE METAL BEAM GUARD FENCE
LF 722.000 $2.000 $1.500 $2.430
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 2.000 $200.000 $45.000 $335.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,800.000 $2,790.000 $2,700.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $250.000 $175.000 $335.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 6.000 $1,200.000 $845.000 $1,910.000
CRASH CUSH ATTEN (REMOVE)
EA 6.000 $800.000 $250.000 $1,175.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 6.000 $8,500.000 $6,603.000 $12,330.000
WIRE FENCE (TY A)
LF 2,842.000 $15.000 $11.750 $5.000
GATE (TY 1)
EA 4.000 $1,000.000 $451.000 $1,265.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 4.000 $600.000 $757.630 $745.000
REMOVE SM RD SN SUP&AM
EA 4.000 $250.000 $103.940 $130.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 54.000 $15.000 $15.750 $21.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 2.000 $85.000 $54.070 $65.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 4.000 $25.000 $35.000 $20.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 14.000 $25.000 $19.250 $32.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 84.000 $8.000 $10.000 $5.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 6,552.000 $1.000 $1.000 $0.640
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 6,552.000 $1.000 $1.000 $0.640
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 655.000 $2.000 $1.120 $1.500
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 655.000 $2.000 $1.160 $1.500
PAVEMENT SEALER 4"
LF 3,038.000 $0.500 $0.500 $0.500
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 9,252.000 $0.750 $0.420 $0.700
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 1,160.000 $0.750 $0.420 $0.700
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 526.000 $0.750 $0.420 $0.700
REFL PAV MRKR TY II-A-A
EA 59.000 $15.000 $10.000 $5.000
PAV SURF PREP FOR MRK (4")
LF 7,902.000 $0.400 $0.010 $0.500
D-GR HMA TY-B PG64-22
TON 2,771.000 $100.000 $96.350 $103.650
D-GR HMA TY-D SAC-B PG70-22
TON 2,517.000 $100.000 $102.500 $110.250
TACK COAT
GAL 3,816.000 $4.000 $2.310 $2.250
TEMP CONSTRUCTION ACCESS
LS 1.000 $750,000.000 $800,000.000 $900,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $25,000.000 $13,500.000
TMA (STATIONARY)
DAY 4.000 $600.000 $1,800.000 $650.000
TMA (MOBILE OPERATION)
DAY 4.000 $500.000 $2,500.000 $975.000
Totals: $11,245,966.300 $12,487,777.170 $14,353,733.250