COLORADO US 90 (0027-01-040)

Items: 145

County: COLORADO
Length: N/A
Highway: US 90
District: YOAKUM
Control Number: 0027-01-040
DBE Goal: N/A
Project: BR 2016(507)
Guaranty: N/A
Time: 350 WORKING DAYS
Engineer's Estimate: $6,156,871.20
Date: 05/02/2017 (9 years ago)
Contract Number: N/A
Type: CONSTRUCT ONE WAY BRIDGE AND APPROACHES(WESTBOUND)
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$6,156,871.20
$7,142,388.40
Over/Under Est: 16.01% $985,517.20
$7,291,026.26
Over/Under Est: 18.42% $1,134,155.06
Amt Left: 2.08% $148,637.86
Over/Under Est: 26.61% $1,638,101.33
Amt Left: 9.14% $652,584.13
Delta: -6.91% -$503,946.27
$8,468,023.81
Over/Under Est: 37.54% $2,311,152.61
Amt Left: 18.56% $1,325,635.41
Delta: -8.63% -$673,051.28

Bid Items & Bid Tabulations

145 Total 0 of 145
COLORADO  |  US 90  |  YOAKUM  |  0027-01-040  |  05/02/2017  |  $6,156,871.20  |  BR 2016(507)  |  CONSTRUCT ONE WAY BRIDGE AND APPROAC...  |  350 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ISI CONTRACTING, INC.
SB CONTRACTORS LLC
JAMES CONSTRUCTION GROUP, L.L.C.
J.D. ABRAMS, L.P.
PREPARING ROW
STA 20.390 $2,500.000 $3,500.000 $3,200.000 $27,000.000 $40,000.000
PREP ROW (TREE) (18"-36" DIA.)
EA 15.000 $2,000.000 $1,200.000 $800.000 $3,500.000 $2,500.000
REMOVING CONC (SIDEWALKS)
SY 38.000 $15.000 $5.000 $10.000 $11.760 $70.000
REMOVING CONC (DRIVEWAYS)
SY 195.000 $25.000 $18.000 $10.000 $16.330 $27.000
REMOVE CONC (GUTTER)
LF 201.000 $10.000 $7.000 $5.000 $5.560 $20.000
REMOVING CONC (MISC)
SY 140.000 $25.000 $4.000 $10.000 $11.370 $20.000
EXCAVATION (ROADWAY)
CY 4,649.000 $15.000 $15.000 $12.000 $6.500 $4.500
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 23,001.000 $12.000 $13.000 $22.000 $16.750 $22.000
BACKFILL (TY B)
STA 9.000 $200.000 $750.000 $600.000 $229.340 $600.000
BLADING
HR 50.000 $120.000 $100.000 $80.000 $103.200 $96.000
BLOCK SODDING
SY 921.000 $5.000 $6.500 $4.000 $5.020 $5.500
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 24,273.000 $0.300 $0.300 $0.200 $0.250 $0.270
CELL FBR MLCH SEED(TEMP)(WARM)
SY 6,068.000 $0.250 $0.300 $0.200 $0.220 $0.230
CELL FBR MLCH SEED(TEMP)(COOL)
SY 6,068.000 $0.250 $0.300 $0.200 $0.220 $0.230
VEGETATIVE WATERING
MG 212.100 $50.000 $25.000 $45.000 $28.140 $23.000
SOIL RETENTION BLANKETS (CL 2) (TY G)
SY 2,953.000 $5.000 $4.000 $1.500 $3.450 $5.000
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
CY 3,206.000 $70.000 $100.000 $75.000 $71.370 $77.000
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 119.000 $150.000 $168.000 $185.000 $176.580 $145.000
LIME TRT (SUBGRADE)(6")
SY 8,736.000 $2.750 $4.000 $6.000 $4.610 $4.000
PRIME COAT (MC-30)
GAL 1,582.000 $5.000 $6.000 $6.500 $8.760 $7.500
AGGR(TY-PB GR-4 SAC-B)
CY 128.000 $95.000 $225.000 $165.000 $438.000 $360.000
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 4,978.000 $4.000 $4.000 $5.500 $5.390 $4.400
D-GR HMA TY-D SAC-B PG70-22
TON 1,089.000 $100.000 $118.000 $160.000 $161.720 $132.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 1,278.000 $60.000 $68.000 $95.000 $91.590 $82.000
PLANE ASPH CONC PAV (1.5")
SY 261.000 $3.000 $32.000 $32.000 $90.300 $8.500
CEM STABIL BKFL
CY 773.000 $100.000 $60.000 $135.000 $100.560 $300.000
CUT & RESTORE ASPH PAVING
SY 34.000 $100.000 $280.000 $200.000 $102.930 $100.000
TRENCH EXCAVATION PROTECTION
LF 944.000 $10.000 $1.000 $15.000 $2.430 $19.000
TEMPORARY SPL SHORING
SF 275.000 $10.000 $75.000 $25.000 $50.000 $1.000
DRILL SHAFT (36 IN)
LF 470.000 $150.000 $200.000 $230.000 $190.000 $205.000
DRILL SHAFT (48 IN)
LF 1,680.000 $250.000 $325.000 $290.000 $325.000 $400.000
CL C CONC (ABUT)
CY 60.500 $1,200.000 $1,100.000 $850.000 $750.000 $1,220.000
CL C CONC (BENT)
CY 397.600 $1,400.000 $900.000 $1,200.000 $1,800.000 $1,200.000
CL C CONC (RAIL FOUNDATION)
CY 6.100 $500.000 $1,000.000 $550.000 $650.000 $860.000
REINF CONC SLAB
SF 34,425.000 $14.000 $17.000 $18.000 $18.000 $17.500
PRESTR CONC GIRDER (TX46)
LF 1,317.500 $125.000 $170.000 $135.000 $164.260 $153.000
RIPRAP (CONC)(5 IN)
CY 74.000 $500.000 $450.000 $350.000 $356.200 $550.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 474.000 $100.000 $165.000 $160.000 $167.400 $265.000
RIPRAP (STONE PROTECTION)(30 IN)
CY 227.000 $150.000 $165.000 $150.000 $175.730 $305.000
RIPRAP (CONC)(FLUME)
CY 9.000 $600.000 $650.000 $500.000 $583.530 $665.000
RIPRAP (MOW STRIP)(4 IN)
CY 34.000 $500.000 $550.000 $475.000 $588.040 $735.000
ELASTOMERIC BEARING (E5)
EA 5.000 $3,000.000 $1,900.000 $3,000.000 $1,827.500 $2,200.000
ELASTOMERIC BEARING (F5)
EA 5.000 $3,000.000 $1,900.000 $3,000.000 $2,814.430 $2,200.000
SLIDING ELASTOMERIC BEARING (ES 4)
EA 5.000 $3,000.000 $1,900.000 $2,500.000 $2,445.880 $2,050.000
ELASTOMERIC BEARING(EE4)
EA 5.000 $3,000.000 $1,200.000 $2,500.000 $2,445.880 $1,460.000
STR STEEL (PLATE GIRDER)
LB 1,154,000.000 $1.300 $1.900 $1.650 $1.640 $1.550
STR STEEL (MISC NON - BRIDGE)
LB 312.000 $20.000 $15.000 $20.000 $10.000 $11.000
RAIL (TY T223)
LF 787.000 $100.000 $82.000 $115.000 $79.390 $102.000
RAIL (TY SSTR)
LF 807.000 $45.000 $55.000 $75.000 $46.270 $70.000
RAIL (TY C223)
LF 787.000 $110.000 $95.000 $115.000 $126.020 $130.000
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
LF 148.000 $100.000 $79.000 $75.000 $73.500 $105.000
CONC BOX CULV (4 FT X 4 FT)
LF 427.000 $300.000 $300.000 $270.000 $157.790 $280.000
RC PIPE (CL III)(12 IN)
LF 92.000 $75.000 $60.000 $105.000 $74.990 $49.000
RC PIPE (CL III)(15 IN)
LF 20.000 $80.000 $60.000 $115.000 $47.120 $77.000
RC PIPE (CL III)(24 IN)
LF 346.000 $70.000 $80.000 $130.000 $34.660 $97.000
RC PIPE (CL III)(30 IN)
LF 254.000 $85.000 $135.000 $125.000 $53.660 $105.000
MANH (COMPL)(PRM)(48IN)
EA 1.000 $3,200.000 $4,800.000 $5,500.000 $3,438.020 $4,200.000
INLET (COMPL)(PCO)(3FT)(RIGHT)
EA 1.000 $3,500.000 $4,500.000 $5,000.000 $4,102.920 $6,000.000
INLET (COMPL)(PCO)(6FT)(RIGHT)
EA 1.000 $8,000.000 $5,400.000 $6,500.000 $4,958.540 $7,400.000
INLET (COMPL)(PSL)(RC)(6FTX6FT)
EA 2.000 $5,000.000 $9,400.000 $12,000.000 $9,297.300 $11,700.000
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 1.000 $3,500.000 $3,700.000 $4,500.000 $3,216.970 $5,500.000
INLET (COMPL)(PAZD)(RC)(3FTX3FT)
EA 1.000 $4,500.000 $11,000.000 $14,000.000 $5,260.740 $21,500.000
INLET(COMPL)(DROP)(TY 1)(1 GRATE)
EA 3.000 $3,000.000 $3,400.000 $4,500.000 $5,260.740 $3,800.000
INLET(COMPL)(DROP)(TY 1 )(2 GRATE)
EA 3.000 $3,500.000 $4,500.000 $5,500.000 $4,102.930 $6,000.000
INLET(COMPL)(DROP)(TY 1)(3 GRATE)
EA 1.000 $4,000.000 $5,300.000 $6,500.000 $5,260.740 $7,200.000
WINGWALL (FW - 0) (HW=6 FT)
EA 1.000 $10,000.000 $4,500.000 $10,000.000 $6,897.020 $16,000.000
SET (TY II) (12 IN) (RCP) (6: 1) (P)
EA 1.000 $800.000 $800.000 $1,500.000 $1,761.550 $1,600.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 1.000 $2,000.000 $1,200.000 $1,500.000 $1,937.520 $2,200.000
SET (TY II) (30 IN) (RCP) (3: 1) (C)
EA 2.000 $2,500.000 $1,300.000 $1,800.000 $2,040.680 $1,400.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 2.000 $3,000.000 $1,400.000 $2,000.000 $2,107.430 $2,400.000
GRATE AND FRAME (BRIDGE DRAIN)
EA 1.000 $2,750.000 $2,200.000 $3,000.000 $3,825.250 $4,300.000
PIPE (PVC) (SCH 40) (6 IN)
LF 34.000 $45.000 $180.000 $55.000 $45.900 $34.000
REMOV STR (INLET)
EA 5.000 $800.000 $600.000 $2,000.000 $676.630 $5,000.000
REMOV STR (MANHOLE)
EA 1.000 $1,200.000 $540.000 $3,000.000 $676.640 $1,000.000
REMOV STR (HEADWALL)
EA 1.000 $850.000 $800.000 $5,000.000 $1,423.790 $2,000.000
REMOV STR (PIPE)
LF 762.000 $20.000 $26.000 $6.000 $20.130 $20.000
MOBILIZATION
LS 1.000 $600,000.000 $710,000.000 $725,958.910 $750,000.000 $745,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 24.000 $5,000.000 $1,500.000 $3,000.000 $2,490.570 $2,900.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 145.000 $30.000 $26.000 $45.000 $22.360 $27.950
ROCK FILTER DAMS (REMOVE)
LF 145.000 $10.000 $14.000 $10.000 $6.000 $7.500
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 372.000 $20.000 $32.000 $18.000 $128.000 $35.000
CONSTRUCTION EXITS (REMOVE)
SY 372.000 $7.000 $7.000 $10.000 $34.590 $7.500
CONSTRUCTION PERIMETER FENCE
LF 305.000 $7.500 $2.300 $4.000 $2.250 $2.900
TEMP SEDMT CONT FENCE (INSTALL)
LF 4,999.000 $2.500 $2.250 $3.500 $2.000 $2.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 4,999.000 $1.000 $0.500 $0.350 $0.250 $0.320
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 142.000 $6.000 $4.000 $18.000 $3.500 $4.400
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 44.000 $8.000 $5.500 $18.000 $4.950 $6.200
BIODEG EROSN CONT LOGS (REMOVE)
LF 186.000 $1.500 $1.750 $2.000 $1.500 $1.900
CONSTRUCTING DETOURS
SY 1,254.000 $75.000 $22.000 $40.000 $27.250 $167.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 420.000 $50.000 $95.000 $70.000 $65.070 $42.500
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 240.000 $15.000 $25.000 $15.000 $6.590 $4.500
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 480.000 $20.000 $28.000 $15.000 $11.880 $6.000
CONC CURB (TY II)
LF 53.000 $20.000 $12.000 $25.000 $32.340 $18.000
CONC CURB & GUTTER (TY I)
LF 294.000 $25.000 $55.000 $20.000 $22.350 $24.000
CONC CURB & GUTTER (TY II)
LF 207.000 $25.000 $55.000 $20.000 $26.320 $22.500
CONC SIDEWALKS (4")
SY 689.000 $60.000 $50.000 $35.000 $31.470 $52.000
CURB RAMPS (TY 1)
EA 3.000 $2,000.000 $1,800.000 $2,000.000 $1,152.410 $1,500.000
CURB RAMPS (TY 2)
EA 1.000 $2,500.000 $1,800.000 $2,000.000 $1,537.740 $1,500.000
CURB RAMPS (TY 7)
EA 2.000 $1,600.000 $1,800.000 $2,500.000 $2,223.650 $1,500.000
MTL W-BEAM GD FEN (TIM POST)
LF 663.000 $20.000 $18.000 $21.500 $18.000 $21.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 5.000 $1,500.000 $1,800.000 $1,458.000 $2,010.550 $1,750.000
REMOVE METAL BEAM GUARD FENCE
LF 326.000 $3.000 $2.500 $3.000 $1.500 $1.750
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $190.000 $100.000 $135.000 $125.000 $138.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $2,200.000 $2,500.000 $2,329.000 $2,329.000 $2,450.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 1.000 $1,000.000 $1,600.000 $2,500.000 $1,000.000 $1,250.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $880.000 $600.000 $1,400.000 $750.000 $950.000
CRASH CUSH ATTEN (INSTL)(R)(W)(TL2)
EA 1.000 $15,000.000 $13,500.000 $14,000.000 $11,400.000 $14,500.000
CRASH CUSH ATTEN (INSTL)(R)(W)(TL3)
EA 1.000 $22,000.000 $21,000.000 $21,000.000 $18,500.000 $23,500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL2)
EA 1.000 $5,000.000 $10,000.000 $10,000.000 $6,000.000 $7,500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 1.000 $12,000.000 $10,000.000 $10,000.000 $7,000.000 $8,750.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 1.000 $180.000 $175.000 $180.000 $189.950 $240.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
EA 1.000 $625.000 $700.000 $715.000 $625.960 $630.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 1.000 $650.000 $930.000 $695.000 $613.310 $620.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 1.000 $950.000 $885.000 $845.000 $696.340 $700.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 13.000 $350.000 $320.000 $345.000 $341.350 $350.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 3.000 $425.000 $380.000 $395.000 $365.540 $370.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 3.000 $400.000 $406.000 $375.000 $425.000 $430.000
REMOVE SM RD SN SUP&AM
EA 18.000 $100.000 $104.000 $95.000 $65.000 $66.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 23.000 $28.000 $16.000 $25.000 $11.000 $11.500
INSTL OM ASSM (OM-4)(FLX)GND
EA 6.000 $60.000 $250.000 $75.000 $231.360 $232.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 8.000 $40.000 $25.000 $25.000 $13.250 $13.500
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 7,160.000 $0.300 $0.300 $0.500 $0.250 $0.320
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 7,102.000 $0.300 $0.300 $0.500 $0.250 $0.320
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 222.000 $3.500 $4.350 $5.000 $4.000 $5.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 3,339.000 $1.000 $1.000 $1.000 $0.700 $0.880
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 4,696.000 $1.000 $1.000 $1.000 $0.700 $0.880
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 846.000 $1.500 $2.000 $2.000 $1.000 $0.970
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
LF 59.000 $1.500 $1.650 $1.000 $1.500 $1.550
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 683.000 $1.000 $1.200 $1.000 $1.100 $1.100
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
LF 208.000 $2.500 $3.300 $3.000 $3.000 $3.100
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 132.000 $6.000 $5.400 $7.000 $5.000 $5.100
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 75.000 $0.400 $1.650 $5.000 $1.500 $1.600
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 6,229.000 $0.400 $0.700 $0.650 $0.620 $0.650
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 40.000 $0.400 $1.630 $5.000 $1.500 $1.550
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 6,152.000 $0.400 $0.670 $0.650 $0.620 $0.650
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 71.000 $15.000 $12.500 $15.000 $11.500 $12.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 2.000 $225.000 $380.000 $220.000 $350.000 $355.000
PREFAB PAV MRK TY C (W) (WORD)
EA 2.000 $300.000 $408.000 $250.000 $375.000 $380.000
REFL PAV MRKR TY I-C
EA 43.000 $4.000 $4.350 $12.000 $4.000 $4.100
REFL PAV MRKR TY II-A-A
EA 160.000 $4.000 $4.350 $12.000 $4.000 $4.100
ELIM EXT PAV MRK & MRKS (4")
LF 8,637.000 $0.500 $0.500 $0.750 $0.450 $0.470
ELIM EXT PAV MRK & MRKS (24")
LF 70.000 $4.000 $5.450 $10.000 $5.000 $5.100
PAV SURF PREP FOR MRK (4")
LF 3,068.000 $0.100 $0.020 $0.250 $0.020 $0.030
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $14,000.000 $13,000.000 $18,000.000 $20,000.000 $14,000.000
DEAD END ROADWAY BARRICADE
LF 16.000 $100.000 $120.000 $105.000 $105.000 $145.000
Totals: $6,156,871.200 $7,142,388.400 $7,291,026.260 $7,794,972.534 $8,468,023.810