|
|
MOBILIZATION (CALLOUT)
|
EA
|
30.000
|
$500.000
|
$1.000
|
$1.000
|
$1.000
|
$2,185.210
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
9,000.000
|
$20.000
|
$20.000
|
$21.000
|
$50.000
|
$28.830
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
500.000
|
$27.000
|
$22.000
|
$35.000
|
$60.000
|
$44.330
|
|
|
MTL THRIE-BEAM GD FEN (TIM POST)
|
LF
|
100.000
|
$40.000
|
$35.000
|
$45.000
|
$400.000
|
$107.970
|
|
|
MTL THRIE-BEAM GD FEN (STEEL POST)
|
LF
|
25.000
|
$60.000
|
$50.000
|
$45.000
|
$500.000
|
$171.920
|
|
|
TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$120.000
|
$300.000
|
$1.000
|
$1.000
|
$249.560
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
10.000
|
$1,600.000
|
$1,780.000
|
$1,950.000
|
$1,000.000
|
$2,611.440
|
|
|
SHORT RADIUS
|
LF
|
1.000
|
$50.000
|
$60.000
|
$500.000
|
$1,000.000
|
$30.910
|
|
|
DRIVEWAY TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$750.000
|
$750.000
|
$900.000
|
$7,000.000
|
$876.730
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
5.000
|
$1,100.000
|
$2,500.000
|
$1,450.000
|
$8,000.000
|
$1,928.620
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
1.000
|
$1,000.000
|
$800.000
|
$700.000
|
$2,000.000
|
$1,143.870
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
9,500.000
|
$2.250
|
$0.650
|
$1.000
|
$1.000
|
$4.140
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$500.000
|
$500.000
|
$4,000.000
|
$15,000.000
|
$998.560
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
44.000
|
$2,900.000
|
$2,850.000
|
$1,500.000
|
$6,000.000
|
$3,368.010
|
|
|
GUARDRAIL END TREATMENT (MOVE & RESET)
|
EA
|
1.000
|
$500.000
|
$500.000
|
$500.000
|
$1.000
|
$570.930
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
1.000
|
$600.000
|
$500.000
|
$5,000.000
|
$15,000.000
|
$1,541.480
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
45.000
|
$1,000.000
|
$27.000
|
$1.000
|
$1.000
|
$1,502.310
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL2)
|
EA
|
12.000
|
$7,500.000
|
$15,000.000
|
$9,000.000
|
$15,000.000
|
$28,008.480
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
12.000
|
$22,200.000
|
$22,000.000
|
$23,842.000
|
$15,000.000
|
$29,109.280
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
|
EA
|
12.000
|
$27,500.000
|
$26,000.000
|
$42,000.000
|
$15,000.000
|
$42,366.390
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(TL2)
|
EA
|
3.000
|
$8,300.000
|
$15,000.000
|
$15,975.000
|
$25,000.000
|
$23,900.170
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
|
EA
|
3.000
|
$11,000.000
|
$25,000.000
|
$21,300.000
|
$25,000.000
|
$31,855.840
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(W)(TL3)
|
EA
|
3.000
|
$27,000.000
|
$35,000.000
|
$35,000.000
|
$30,000.000
|
$27,824.690
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
10.000
|
$40.000
|
$60.000
|
$30.000
|
$20.000
|
$368.400
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
150.000
|
$15.000
|
$30.000
|
$30.000
|
$25.000
|
$30.640
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
75.000
|
$27.000
|
$30.000
|
$100.000
|
$10.000
|
$43.570
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
30.000
|
$27.000
|
$30.000
|
$30.000
|
$25.000
|
$17.500
|
|
|
REPAIR RAIL ELEMENT (W - BEAM)
|
LF
|
9,500.000
|
$16.000
|
$17.500
|
$14.000
|
$40.000
|
$24.280
|
|
|
REPAIR RAIL ELEMENT (THRIE - BEAM)
|
LF
|
19.000
|
$30.000
|
$130.000
|
$100.000
|
$750.000
|
$31.440
|
|
|
REM / REPL TIMBER POST W / O CONC FND
|
EA
|
600.000
|
$50.000
|
$50.000
|
$48.000
|
$100.000
|
$86.480
|
|
|
REM / REPL STEEL POST W / O CONC FND
|
EA
|
30.000
|
$45.000
|
$80.000
|
$200.000
|
$300.000
|
$105.610
|
|
|
REM / REPL TIMBER POST W / CONC FND
|
EA
|
40.000
|
$50.000
|
$80.000
|
$80.000
|
$600.000
|
$92.650
|
|
|
REM / REPL STEEL POST W / CONC FND
|
EA
|
12.000
|
$65.000
|
$300.000
|
$400.000
|
$900.000
|
$188.930
|
|
|
REPAIR STEEL POST WITH BASE PLATE
|
EA
|
1.000
|
$290.000
|
$350.000
|
$350.000
|
$500.000
|
$143.620
|
|
|
REALIGN POSTS
|
EA
|
25.000
|
$17.000
|
$65.000
|
$100.000
|
$75.000
|
$12.870
|
|
|
REMOVE & REPLACE BLOCKOUT
|
EA
|
253.000
|
$17.000
|
$50.000
|
$18.000
|
$20.000
|
$28.620
|
|
|
REPLACE SINGLE GDRAIL TERMINAL RAIL
|
LF
|
3,700.000
|
$23.000
|
$20.000
|
$29.920
|
$40.000
|
$49.670
|
|
|
REPLACE SINGLE GDRAIL TERMINAL POST
|
EA
|
367.000
|
$65.000
|
$60.000
|
$1.000
|
$1.000
|
$77.070
|
|
|
REPLACE TERMINAL ANCHOR POSTS
|
EA
|
1.000
|
$90.000
|
$50.000
|
$1.000
|
$1,000.000
|
$69.080
|
|
|
REPLACE HINGED TOP SGT STEEL POST
|
EA
|
9.000
|
$200.000
|
$180.000
|
$300.000
|
$1,000.000
|
$368.400
|
|
|
RESET HINGED TOP SGT STL POST
|
EA
|
10.000
|
$200.000
|
$180.000
|
$300.000
|
$900.000
|
$25.300
|
|
|
REMOVE GDRAIL END TRT / REPL WITH SGT
|
EA
|
4.000
|
$2,500.000
|
$4,900.000
|
$5,000.000
|
$8,000.000
|
$5,876.560
|
|
|
REPL SINGLE GDRAIL TERM IMPACT HEAD
|
EA
|
51.000
|
$850.000
|
$1,100.000
|
$3,000.000
|
$3,800.000
|
$1,626.670
|
|
|
REM & RESET SGT IMPACT HEAD
|
EA
|
40.000
|
$100.000
|
$54.000
|
$1.000
|
$1.000
|
$114.010
|
|
|
REPLACE SGT CABLE ASSEMBLY
|
EA
|
83.000
|
$80.000
|
$100.000
|
$100.000
|
$50.000
|
$103.380
|
|
|
REPLACE SGT CABLE ANCHOR
|
EA
|
41.000
|
$75.000
|
$100.000
|
$100.000
|
$50.000
|
$97.050
|
|
|
REPLACE SGT STRUT
|
EA
|
50.000
|
$75.000
|
$100.000
|
$100.000
|
$50.000
|
$96.420
|
|
|
REPLACE SGT OBJECT MARKER
|
EA
|
15.000
|
$50.000
|
$450.000
|
$50.000
|
$100.000
|
$50.710
|
|
|
REPAIR STEEL POST WITH BASE PLATE
|
EA
|
25.000
|
$300.000
|
$350.000
|
$350.000
|
$500.000
|
$333.210
|
|
|
REPAIR SINGLE GUARDRAIL TERMINAL
|
EA
|
10.000
|
$2,255.000
|
$2,000.000
|
$4,000.000
|
$7,000.000
|
$1,676.710
|
|
|
REPAIR (SMTC)(N)(BAY)
|
EA
|
8.000
|
$1,000.000
|
$500.000
|
$500.000
|
$1,200.000
|
$1,228.010
|
|
|
REPAIR (TRACC)
|
EA
|
15.000
|
$4,000.000
|
$3,500.000
|
$500.000
|
$300.000
|
$5,436.830
|
|
|
REPAIR (WIDE TRACC)
|
EA
|
7.000
|
$3,100.000
|
$5,000.000
|
$500.000
|
$300.000
|
$6,140.060
|
|
|
REPAIR (CATGR - FRONT SECTION)
|
EA
|
2.000
|
$5,700.000
|
$3,000.000
|
$500.000
|
$4,000.000
|
$6,494.810
|
|
|
REPAIR REACT (CYLINDERS)
|
EA
|
5.000
|
$3,000.000
|
$2,000.000
|
$3,000.000
|
$100.000
|
$4,134.300
|
|
|
REPAIR REACT (W) (CYLINDERS)
|
EA
|
2.000
|
$2,300.000
|
$2,800.000
|
$3,000.000
|
$100.000
|
$3,663.570
|
|
|
REPAIR (QUAD - ELITE) NARROW (BAY)
|
EA
|
5.000
|
$2,500.000
|
$2,000.000
|
$3,000.000
|
$100.000
|
$2,494.130
|
|
|
REPAIR (QUAD - ELITE) WIDE (BAY)
|
EA
|
5.000
|
$2,700.000
|
$2,000.000
|
$3,000.000
|
$100.000
|
$625.960
|
|
|
REMOVE AND REPLACE (SMTC) (N)
|
EA
|
10.000
|
$20,000.000
|
$25,000.000
|
$23,842.000
|
$12,000.000
|
$26,095.240
|
|
|
REPAIR (SMTC) (N)
|
EA
|
10.000
|
$5,000.000
|
$4,500.000
|
$5,000.000
|
$10,000.000
|
$4,560.250
|
|
|
REMOVE AND REPLACE (SMTC) (W)
|
EA
|
10.000
|
$26,000.000
|
$30,000.000
|
$42,000.000
|
$15,000.000
|
$24,998.800
|
|
|
REPAIR (SMTC) (W)
|
EA
|
10.000
|
$3,300.000
|
$4,800.000
|
$5,000.000
|
$10,000.000
|
$4,067.840
|
|
|
REPAIR (FASTRACC) (BAY)
|
EA
|
20.000
|
$600.000
|
$500.000
|
$1,000.000
|
$100.000
|
$1,034.470
|
|
|
REPAIR (SHORTRACC) (BAY)
|
EA
|
6.000
|
$600.000
|
$450.000
|
$100.000
|
$100.000
|
$921.010
|
|
|
REPAIR (TRACC) (BAY)
|
EA
|
120.000
|
$900.000
|
$450.000
|
$200.000
|
$100.000
|
$462.870
|
|
|
REPAIR (WIDE TRACC) (BAY)
|
EA
|
64.000
|
$450.000
|
$500.000
|
$200.000
|
$100.000
|
$1,842.020
|
|
|
REPAIR (SMTC) (N)
|
LF
|
50.000
|
$150.000
|
$500.000
|
$500.000
|
$500.000
|
$271.910
|
|
|
REPAIR (NARROW REACT 350)
|
EA
|
1.000
|
$3,000.000
|
$5,000.000
|
$3,000.000
|
$3,000.000
|
$3,070.030
|
|
|
REPAIR (SMTC) (W)
|
LF
|
50.000
|
$530.000
|
$500.000
|
$500.000
|
$500.000
|
$654.940
|
|
|
REPAIR (TAU)(II)(W)(BAY)
|
EA
|
12.000
|
$1,500.000
|
$1,500.000
|
$500.000
|
$2,500.000
|
$2,302.520
|
|
|
REMOVE AND REPLACE (QUADGUARD)(MASH)(N)
|
EA
|
2.000
|
$11,700.000
|
$20,000.000
|
$18,000.000
|
$16,000.000
|
$34,864.010
|
|
|
REPAIR (QUADGUARD)(MASH)(N)
|
EA
|
1.000
|
$500.000
|
$5,000.000
|
$5,000.000
|
$10,000.000
|
$3,837.530
|
|
|
REPAIR (QUADGUARD)(MASH)(N)(BAY)
|
EA
|
3.000
|
$500.000
|
$1,500.000
|
$1,000.000
|
$2,500.000
|
$614.010
|
|
|
REMOVE AND REPLACE (TAU)(MASH)(N)
|
EA
|
2.000
|
$11,700.000
|
$22,000.000
|
$20,000.000
|
$16,000.000
|
$32,048.900
|
|
|
REPAIR (TAU)(MASH)(N)
|
EA
|
5.000
|
$500.000
|
$2,500.000
|
$5,000.000
|
$10,000.000
|
$614.010
|
|
|
REPAIR (TAU)(MASH)(N)(BAY)
|
EA
|
5.000
|
$262.000
|
$1,000.000
|
$1,000.000
|
$2,500.000
|
$614.010
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
48.000
|
$200.000
|
$75.000
|
$500.000
|
$1,000.000
|
$142.180
|
|
|
TMA (STATIONARY)
|
DAY
|
40.000
|
$100.000
|
$800.000
|
$250.000
|
$3,000.000
|
$440.430
|
|
Totals: |
$2,633,266.000
|
$2,898,725.000
|
$3,085,816.000
|
$3,584,819.000
|
$4,020,112.890
|