Show Job Controls
Bid Cobra

COLLIN SH0078 (6312-02-001)

Items: 22

County: COLLIN
Length: N/A
Highway: SH0078
District: DALLAS
Control Number: 6312-02-001
DBE Goal: N/A
Project: RMC - 631202001
Guaranty: N/A
Time: 50 W
Engineer's Estimate: $154,253.21
Date: 05/09/2017 (9 years ago)
Contract Number: N/A
Type: REHABILITATION OF EXISTING CULVERTS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$154,253.21
$161,845.00
Over/Under Est: 4.92% $7,591.79
Over/Under Est: 10.2% $15,738.25
Amt Left: 5.03% $8,146.46
Over/Under Est: 12.61% $19,446.69
Amt Left: 7.32% $11,854.90
Delta: -2.18% -$3,708.44
Over/Under Est: 34.92% $53,859.94
Amt Left: 28.59% $46,268.15
Delta: -19.81% -$34,413.25
Over/Under Est: 50.86% $78,458.79
Amt Left: 43.79% $70,867.00
Delta: -11.82% -$24,598.85
Over/Under Est: 80.45% $124,092.30
Amt Left: 71.98% $116,500.51
Delta: -19.61% -$45,633.51

Bid Items & Bid Tabulations

22 Total 0 of 22
COLLIN  |  SH0078  |  DALLAS  |  6312-02-001  |  05/09/2017  |  $154,253.21  |  RMC - 631202001  |  REHAB OF EXIST CULVERTS  |  50 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
HIGHWAY 19 CONSTRUCTION LLC
SHALOM SERVICES CORPORATION
CHAMPION INFRASTRUCTURE, LLC
OPPORTUNITY EXCAVATION/CONCRETE, LLC
FNH CONSTRUCTION, LLC
BXB GROUP INCORPORATION
REMOVING CONC (MISC)
SY 106.600 $23.000 $35.000 $35.000 $40.000 $35.000 $20.000 $99.000
EXCAVATION (CHANNEL)
CY 120.000 $30.000 $50.000 $20.000 $40.000 $23.000 $20.000 $90.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 150.000 $30.000 $45.000 $16.000 $50.000 $45.000 $40.000 $82.000
BLOCK SODDING
SY 76.500 $3.500 $10.000 $10.000 $18.000 $6.500 $10.000 $8.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 340.000 $2.000 $2.000 $1.300 $5.000 $8.500 $10.000 $1.000
VEGETATIVE WATERING
MG 39.060 $14.000 $100.000 $50.000 $90.000 $120.000 $200.000 $65.000
FLOWABLE BACKFILL
CY 17.190 $278.000 $200.000 $150.690 $400.000 $280.000 $250.000 $359.000
TRENCH EXCAVATION PROTECTION
LF 82.000 $80.000 $10.000 $25.000 $1.000 $26.000 $3.500 $16.000
TEMPORARY SPL SHORING
SF 84.000 $25.000 $100.000 $20.000 $68.000 $36.000 $45.000 $30.000
RIPRAP (CONC)(4 IN)
CY 3.600 $700.000 $500.000 $465.250 $1,800.000 $530.000 $650.000 $1,314.000
RIPRAP (STONE COMMON)(DRY)(8 IN)
CY 13.100 $280.000 $200.000 $200.000 $325.000 $330.000 $185.000 $276.000
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
LF 12.000 $560.000 $800.000 $650.000 $1,200.000 $750.000 $1,000.000 $1,978.000
RC PIPE (CL III)(24 IN)
LF 66.000 $170.000 $75.000 $70.500 $120.000 $130.000 $205.000 $131.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 2.000 $4,000.000 $4,000.000 $5,000.000 $1,500.000 $3,600.000 $6,500.000 $11,988.000
WINGWALL (PW - 1) (HW=8 FT)
EA 2.000 $18,500.000 $15,000.000 $29,270.000 $14,000.000 $15,000.000 $20,000.000 $26,351.000
JACK BOR OR TUN PIPE(24 IN)(RC)(CL III)
LF 65.000 $400.000 $150.000 $650.740 $280.000 $1,100.000 $1,000.000 $829.000
ADJUSTING INLETS
EA 5.000 $1,700.000 $3,500.000 $1,400.000 $2,400.000 $1,750.000 $2,500.000 $4,215.000
REMOV STR (PIPE)
LF 70.000 $75.000 $50.000 $16.880 $25.000 $60.000 $100.000 $35.000
MOBILIZATION
LS 1.000 $12,800.000 $30,000.000 $10,000.000 $24,000.000 $26,000.000 $23,000.000 $17,500.000
CONC SIDEWALKS (4")
SY 92.000 $50.000 $75.000 $50.000 $178.000 $35.000 $85.000 $162.000
REMOVE METAL BEAM GUARD FENCE
LF 245.000 $10.000 $3.000 $2.500 $2.000 $5.500 $5.000 $10.000
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $10.000 $500.000 $250.000 $250.000 $200.000 $500.000 $382.000
Totals: $154,253.210 $161,845.000 $169,991.461 $173,699.900 $208,113.150 $232,712.000 $278,345.510