Show Job Controls
Bid Cobra

COLLIN FM 2514 (2679-03-015)

Items: 257

County: COLLIN
Length: N/A
Highway: FM 2514
District: DALLAS
Control Number: 2679-03-015
DBE Goal: N/A
Project: C 2679-3-15
Guaranty: N/A
Time: 731 WORKING DAYS
Engineer's Estimate: $43,170,225.64
Date: 06/30/2022 (3 years ago)
Contract Number: N/A
Type: RECONSTRUCT 2 LANE RURAL TO 4 LANE DIVIDED
Mail/Deliver Bids To: N/A
JENNIFER VORSTER
GERALD WALTMAN
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$43,170,225.64
1
$50,385,911.22
Over/Under Est: 16.71% $7,215,685.58
Over/Under Est: 21.14% $9,126,691.17
Amt Left: 3.79% $1,911,005.59
Over/Under Est: 31.49% $13,594,758.21
Amt Left: 12.66% $6,379,072.63
Delta: -8.54% -$4,468,067.04
Subcontractor Percentage Amount
AUSTIN BRIDGE & ROAD SERVICES, LP 10.97% $6,654,434.68
190 CONSTRUCTION LLC 3.91% $2,371,817.65
RENAISSANCE CONTRACTORS, INC. 1.54% $934,168.59
J. H. ODEN CONTRACTING COMPANY 1.32% $800,715.93
MICA CORPORATION 0.89% $539,876.65
TRP CONSTRUCTION GROUP, LLC 0.85% $515,612.53
DURABLE SPECIALTIES, INC. 0.81% $491,348.41
TEXOP CONSTRUCTION 0.50% $303,301.49
COWBOY TRUCKING 0.41% $248,707.22
AVANZA CONSTRUCTION & EARTHWORKS, LLC 0.41% $248,707.22
RAMBO CONTRACTING, INC. 0.37% $224,443.10
SOUTHERN CROSS CONTRACTORS, LLC 0.19% $115,254.57
ACT SAW CUTTING & REMOVAL 0.17% $103,122.51
C&M PRECAST CONCRETE COMPANY 0.11% $66,726.33
SLATON BROS, INC. 0.10% $60,660.30
VISTA RIDGE CONCRETE PUMPING, INC. 0.08% $48,528.24
J. E. GUZMAN CONSTRUCTION, INC. 0.02% $12,132.06
S&S BRIDGE PAINTING 0.01% $6,066.03
NORTH TEXAS CONTRACTING, INC. 0.00% $0.00
ADRIAN CONTRACTING, INC 0.00% $0.00
Total: 22.66% $13,745,623.51

Bid Items & Bid Tabulations

257 Total 0 of 257
COLLIN  |  FM 2514  |  DALLAS  |  2679-03-015  |  06/30/2022  |  $43,170,225.64  |  C 2679-3-15  |  RECON 2 LANE RURAL TO 4 LANE DIVIDED  |  731 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
WEBBER, LLC
ED BELL CONSTRUCTION COMPANY
FLATIRON CONSTRUCTORS, INC.
PREPARING ROW
STA 176.510 $5,000.000 $30,030.000 $12,000.000 $31,355.650
REMOVING CONC (PAV)
SY 4,403.000 $10.000 $12.500 $15.000 $30.000
REMOVING CONC (SIDEWALKS)
SY 506.000 $9.750 $25.500 $15.000 $30.000
REMOVING CONC (DRIVEWAYS)
SY 5,818.000 $12.000 $32.000 $15.000 $30.000
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 6,399.000 $7.500 $6.600 $8.000 $8.550
REMOVE TRT BASE & ASPH PAV (20"-30")
SY 77,467.000 $12.000 $8.400 $12.000 $8.550
EXCAVATION (ROADWAY)
CY 89,092.000 $15.000 $12.600 $17.330 $23.500
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
CY 46,774.000 $15.000 $18.100 $10.000 $23.500
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
CY 481.000 $52.800 $126.000 $40.000 $24.290
COMPOST MANUF TOPSOIL (4")
SY 189,370.000 $1.200 $1.150 $1.500 $2.830
BLOCK SODDING
SY 110,815.000 $4.250 $4.750 $5.000 $4.150
DRILL SEED (TEMP)(WARM OR COOL)
SY 78,555.000 $0.120 $0.150 $0.140 $0.180
VEGETATIVE WATERING
MG 28,179.000 $10.000 $15.400 $1.000 $15.740
LIME (HYDRATED LIME (SLURRY))
TON 4,094.000 $185.000 $263.000 $350.000 $300.000
LIME TRT (EXST MATL)(8")
SY 170,641.000 $8.000 $5.600 $7.000 $5.900
CONC PVMT (CONT REINF - CRCP) (10")
SY 144,067.000 $65.000 $95.820 $89.500 $107.460
CONC PVMT (CONT REINF-CRCP)(HES)(10")
SY 7,108.000 $130.000 $105.000 $110.000 $118.600
CEM STABIL BKFL
CY 163.000 $150.000 $83.250 $250.000 $210.370
CUT & RESTORING PAV
SY 262.000 $140.000 $163.000 $225.000 $238.600
TRENCH EXCAVATION PROTECTION
LF 27,107.000 $4.000 $2.750 $2.000 $1.560
TEMPORARY SPL SHORING
SF 13,768.000 $25.000 $12.000 $30.000 $39.140
DRILL SHAFT (18 IN)
LF 1,955.000 $150.000 $119.000 $150.000 $121.280
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 88.000 $465.000 $565.000 $600.000 $458.000
CL C CONC (RAIL FOUNDATION)
CY 36.000 $485.000 $552.000 $800.000 $628.260
RETAINING WALL (MSE)
SF 2,990.000 $60.000 $98.000 $75.000 $51.520
RETAINING WALL (CAST - IN - PLACE)
SF 2,164.000 $130.000 $137.000 $125.000 $163.500
PNEUMATICALLY PLACED CONCRETE (2")
SF 4,375.000 $220.000 $13.000 $30.000 $10.000
RIPRAP (CONC)(5 IN)
CY 845.000 $475.000 $525.000 $750.000 $373.180
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 9.000 $410.000 $624.000 $750.000 $500.000
RIPRAP (STONE COMMON)(GROUT)(8 IN)
CY 191.300 $216.000 $204.000 $300.000 $347.290
RIPRAP (CONC)(FLUME)
CY 12.000 $440.000 $783.000 $750.000 $465.000
RIPRAP (MOW STRIP)(4 IN)
CY 86.000 $620.000 $584.000 $750.000 $339.240
RAIL (TY C221)
LF 702.000 $97.000 $106.640 $150.000 $173.230
RAIL (HANDRAIL)(TY C)
LF 100.000 $75.000 $149.000 $250.000 $120.110
RAIL (TY PR11)
LF 285.600 $90.000 $122.000 $250.000 $97.250
CONC BOX CULV (3 FT X 2 FT)
LF 818.000 $250.000 $168.000 $240.000 $181.180
CONC BOX CULV (3 FT X 3 FT)
LF 251.000 $288.000 $170.000 $250.000 $191.890
CONC BOX CULV (4 FT X 2 FT)
LF 824.000 $300.000 $190.000 $275.000 $223.370
CONC BOX CULV (4 FT X 4 FT)
LF 136.000 $350.000 $227.000 $325.000 $251.450
CONC BOX CULV (7 FT X 3 FT)
LF 230.000 $415.000 $402.000 $575.000 $492.060
CONC BOX CULV (8 FT X 4 FT)
LF 123.000 $500.000 $498.000 $630.000 $541.670
RC PIPE (CL III)(18 IN)
LF 26.000 $85.000 $578.000 $99.000 $153.020
RC PIPE (CL III)(21 IN)
LF 1.000 $90.000 $538.000 $99.500 $1,761.690
RC PIPE (CL III)(24 IN)
LF 18,742.000 $100.000 $73.000 $100.000 $85.250
RC PIPE (CL III)(30 IN)
LF 5,688.000 $110.000 $90.000 $125.000 $103.000
RC PIPE (CL III)(36 IN)
LF 977.000 $150.000 $153.000 $160.000 $117.530
RC PIPE (CL III)(42 IN)
LF 136.000 $175.000 $153.000 $190.000 $164.320
RC PIPE (CL III)(48 IN)
LF 167.000 $225.000 $134.000 $240.000 $190.190
MANH (COMPL)(PRM)(48IN)
EA 14.000 $5,560.000 $5,160.000 $6,000.000 $3,950.370
MANH (COMPL)(PRM)(60IN)
EA 7.000 $8,900.000 $6,760.000 $8,000.000 $5,498.580
MANH (COMPL)(PRM)(72IN)
EA 1.000 $10,000.000 $6,920.000 $9,000.000 $6,759.290
JCTBOX(COMPL)(PJB)(4FTX4FT)
EA 2.000 $5,900.000 $4,380.000 $6,000.000 $3,750.430
INLET (COMPL)(PCO)(3FT)(NONE)
EA 28.000 $6,000.000 $3,910.000 $6,000.000 $4,842.300
INLET (COMPL)(PCO)(3FT)(LEFT)
EA 42.000 $6,250.000 $4,990.000 $6,000.000 $6,391.990
INLET (COMPL)(PCO)(3FT)(RIGHT)
EA 41.000 $6,250.000 $4,660.000 $6,000.000 $6,223.510
INLET (COMPL)(PCO)(3FT)(BOTH)
EA 31.000 $6,500.000 $5,210.000 $6,000.000 $6,681.360
INLET (COMPL)(PCO)(4FT)(NONE)
EA 1.000 $6,000.000 $5,340.000 $6,500.000 $8,327.970
INLET (COMPL)(PCO)(4FT)(LEFT)
EA 8.000 $6,600.000 $5,910.000 $6,500.000 $8,163.880
INLET (COMPL)(PCO)(4FT)(RIGHT)
EA 2.000 $8,470.000 $6,440.000 $6,500.000 $7,211.460
INLET (COMPL)(PCO)(4FT)(BOTH)
EA 9.000 $7,600.000 $5,840.000 $6,500.000 $8,463.080
INLET (COMPL)(PCO)(5FT)(NONE)
EA 1.000 $8,962.000 $6,610.000 $7,000.000 $7,827.500
INLET (COMPL)(PCO)(5FT)(LEFT)
EA 2.000 $5,000.000 $7,750.000 $7,000.000 $7,963.380
INLET (COMPL)(PCO)(5FT)(BOTH)
EA 6.000 $8,207.000 $7,110.000 $7,000.000 $8,245.430
INLET (COMPL)(PCO)(6FT)(LEFT)
EA 3.000 $7,600.000 $6,990.000 $7,500.000 $8,105.070
INLET (COMPL)(PCO)(6FT)(BOTH)
EA 1.000 $8,800.000 $11,390.000 $7,500.000 $9,544.210
INLET (COMPL)(PCU)(3FT)(RIGHT)
EA 1.000 $6,450.000 $6,930.000 $7,500.000 $7,066.960
INLET (COMPL)(PCU)(3FT)(BOTH)
EA 2.000 $7,800.000 $6,090.000 $7,500.000 $6,166.600
INLET (COMPL)(PCU)(4FT)(RIGHT)
EA 1.000 $8,270.000 $6,440.000 $7,500.000 $7,653.770
INLET (COMPL)(PCU)(5FT)(NONE)
EA 2.000 $10,000.000 $6,580.000 $8,000.000 $7,689.580
INLET (COMPL)(PSL)(RH)(3FTX3FT)
EA 6.000 $4,874.000 $11,770.000 $8,000.000 $5,974.120
INLET (COMPL)(PSL)(RH)(4FTX5FT)
EA 2.000 $6,616.000 $12,370.000 $8,500.000 $8,433.350
INLET (COMPL)(PSL)(RH)(5FTX6FT)
EA 2.000 $8,172.000 $6,570.000 $9,000.000 $8,184.250
INLET (COMPL)(PSL)(RH)(6FTX6FT)
EA 3.000 $10,715.000 $6,150.000 $10,000.000 $8,246.790
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 52.000 $6,250.000 $3,860.000 $6,500.000 $5,347.200
INLET (COMPL)(PSL)(FG)(4FTX4FT-3FTX3FT)
EA 1.000 $6,200.000 $6,370.000 $7,000.000 $6,579.590
INLET (COMPL)(PSL)(FG)(5FTX6FT-3FTX3FT)
EA 1.000 $1,475.000 $6,310.000 $7,500.000 $7,337.140
INLET (COMPL)(PAZD)(SL)(5FTX5FT)
EA 2.000 $5,300.000 $6,470.000 $8,000.000 $7,575.720
JCTBOX(COMPL)(PJB)(7FTX7FT)(MOD)
EA 1.000 $10,500.000 $9,940.000 $13,000.000 $19,248.640
WINGWALL (PW - 1) (HW=5 FT)
EA 3.000 $15,300.000 $14,440.000 $20,000.000 $11,882.500
WINGWALL (PW - 1) (HW=7 FT)
EA 3.000 $21,970.000 $18,330.000 $30,000.000 $33,462.460
WINGWALL (PW - 1) (HW=8 FT)
EA 1.000 $24,900.000 $33,770.000 $40,000.000 $41,451.800
WINGWALL (PW - 1) (HW=9 FT)
EA 2.000 $35,000.000 $35,740.000 $50,000.000 $54,022.930
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
EA 1.000 $7,000.000 $6,740.000 $15,000.000 $10,821.940
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 60.000 $1,500.000 $1,790.000 $1,800.000 $1,020.210
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 2.000 $2,800.000 $2,290.000 $2,000.000 $1,410.500
SET (TY II) (30 IN) (RCP) (4: 1) (P)
EA 1.000 $2,520.000 $1,730.000 $2,100.000 $1,458.590
SET (TY II) (42 IN) (RCP) (4: 1) (C)
EA 1.000 $6,000.000 $3,060.000 $8,000.000 $5,714.100
SET (TY II) (48 IN) (RCP) (4: 1) (C)
EA 1.000 $6,400.000 $4,000.000 $10,000.000 $7,397.150
REMOV STR (INLET)
EA 6.000 $475.000 $1,630.000 $1,200.000 $790.560
REMOV STR (SET)
EA 74.000 $371.000 $692.000 $500.000 $266.720
REMOV STR (HEADWALL)
EA 2.000 $1,038.000 $2,490.000 $2,500.000 $2,307.190
REMOV STR (PIPE)
LF 4,201.000 $22.000 $26.900 $22.000 $21.160
REMOV STR (BUILDING)
EA 1.000 $4,500.000 $2,830.000 $5,000.000 $3,893.950
REMOV STR (SMALL)
EA 1.000 $300.000 $2,830.000 $2,000.000 $1,946.970
MOBILIZATION
LS 1.000 $4,007,293.240 $5,300,000.000 $5,200,000.000 $5,534,585.940
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 28.000 $15,000.000 $1,460.000 $52,000.000 $35,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 880.000 $33.000 $28.000 $35.480 $28.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 380.000 $54.000 $43.000 $43.000 $43.000
ROCK FILTER DAMS (REMOVE)
LF 1,260.000 $10.000 $13.000 $21.500 $13.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 855.000 $27.000 $17.000 $24.190 $17.000
CONSTRUCTION EXITS (REMOVE)
SY 855.000 $6.000 $12.000 $12.900 $12.000
SANDBAGS FOR EROSION CONTROL
EA 538.000 $10.000 $7.000 $10.210 $7.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 8,993.000 $2.500 $1.700 $1.830 $1.700
TEMP SEDMT CONT FENCE (REMOVE)
LF 8,993.000 $0.450 $0.400 $0.220 $0.420
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 4,749.000 $6.000 $4.250 $4.680 $4.250
BIODEG EROSN CONT LOGS (REMOVE)
LF 4,749.000 $1.800 $1.000 $1.080 $1.000
CONSTRUCTING DETOURS
SY 28,422.000 $95.000 $86.000 $94.500 $90.720
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 14,040.000 $40.000 $28.300 $25.000 $70.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 2,268.000 $45.000 $68.500 $50.000 $70.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 20,440.000 $7.000 $6.550 $7.500 $10.530
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 2,620.000 $9.500 $6.750 $15.000 $13.390
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 13,760.000 $10.000 $9.350 $12.000 $5.260
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 2,268.000 $18.000 $9.700 $24.000 $6.710
COLORED TEXTURED CONC (4")
SY 29.000 $50.000 $330.000 $525.000 $60.000
COLORED TEXTURED CONC (6")
SY 17.000 $90.000 $328.000 $630.000 $65.000
CONC CURB (MONO) (TY II)
LF 61,788.000 $6.000 $3.350 $3.000 $1.260
CONC CURB (DOWEL)
LF 3,278.000 $16.000 $25.000 $16.000 $14.100
DRIVEWAYS (CONC)
SY 6,635.000 $85.000 $82.500 $125.000 $84.880
DRIVEWAYS (ACP)
SY 2,229.000 $45.000 $84.750 $90.000 $76.440
DRIVEWAYS (BASE)
SY 650.000 $21.000 $35.000 $30.000 $21.640
DRIVEWAYS (CONC) (HES)
SY 1,618.000 $97.000 $74.500 $140.000 $128.790
CONC SIDEWALKS (4")
SY 17,901.000 $60.000 $62.500 $70.000 $54.780
CURB RAMPS (TY 1)
EA 38.000 $2,410.000 $2,500.000 $2,500.000 $1,842.400
CURB RAMPS (TY 5)
EA 2.000 $3,135.000 $2,500.000 $5,000.000 $3,050.000
CURB RAMPS (TY 7)
EA 64.000 $2,857.000 $2,400.000 $2,500.000 $3,149.000
CURB RAMPS (TY 10)
EA 17.000 $1,900.000 $2,500.000 $2,500.000 $2,325.000
CURB RAMPS (TY 21)
EA 7.000 $1,824.000 $3,000.000 $2,500.000 $5,668.200
CONC MEDIAN(MONO NOSE)
SY 406.000 $90.000 $108.000 $300.000 $366.600
CHAIN LINK FENCE (INSTALL) (6')
LF 171.000 $19.000 $70.000 $75.000 $35.000
WIRE FENCE (TY B)
LF 175.000 $33.000 $45.000 $50.000 $45.920
PIPE UNDERDRAINS (TY 6) (6")
LF 5,110.000 $27.000 $1.000 $20.000 $35.810
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 54.000 $250.000 $252.000 $270.900 $257.140
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 5.000 $275.000 $298.000 $320.350 $304.080
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 1.000 $585.000 $713.000 $766.480 $727.550
CONDT (PVC) (SCH 40) (2")
LF 330.000 $17.000 $12.800 $26.880 $12.000
CONDT (PVC) (SCH 40) (3")
LF 153.000 $40.000 $19.900 $31.180 $15.000
CONDT (PVC) (SCH 40) (4") (BORE)
LF 480.000 $45.000 $45.000 $54.830 $34.000
ELEC CONDR (NO.12) INSULATED
LF 320.000 $1.000 $1.300 $2.150 $1.300
ELEC CONDR (NO.8) INSULATED
LF 1,250.000 $2.000 $1.950 $2.150 $1.630
ELEC CONDR (NO.6) BARE
LF 890.000 $2.000 $2.150 $3.230 $1.750
ELEC CONDR (NO.6) INSULATED
LF 180.000 $2.500 $2.650 $3.230 $1.880
GROUND BOX TY A (122311)W/APRON
EA 1.000 $1,250.000 $1,200.000 $1,827.500 $1,000.000
GROUND BOX TY C (162911)W/APRON
EA 7.000 $1,200.000 $1,250.000 $1,935.000 $1,175.000
REMOVE GROUND BOX
EA 1.000 $200.000 $300.000 $322.500 $200.000
ELC SRV TY D 120/240 070(NS)SS(E)PS(U)
EA 1.000 $7,000.000 $8,500.000 $8,600.000 $7,950.000
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 7.500 $78.000 $28.000 $26.870 $25.510
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 81.000 $515.000 $693.000 $676.180 $641.840
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 15.000 $569.000 $708.000 $740.680 $703.060
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 44.000 $680.000 $739.000 $786.900 $746.940
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 37.000 $0.400 $2.100 $2.150 $0.500
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 44,099.000 $0.250 $0.400 $0.400 $0.250
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 1,901.000 $0.500 $0.900 $0.910 $0.500
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 465.000 $5.000 $7.850 $8.010 $2.000
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 9.000 $70.000 $150.000 $152.650 $75.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 9.000 $80.000 $183.000 $185.980 $100.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 47,595.000 $0.200 $0.400 $0.400 $0.250
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 4,148.000 $1.400 $1.550 $1.560 $1.170
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 66,942.000 $1.000 $1.050 $1.080 $0.650
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 2,600.000 $2.000 $2.600 $2.630 $1.500
WK ZN PAV MRK REMOV (W)12"(SLD)
LF 2,011.000 $5.500 $4.900 $5.000 $10.500
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 682.000 $8.000 $10.600 $10.750 $20.500
WK ZN PAV MRK REMOV (W)(ARROW)
EA 18.000 $188.000 $185.000 $188.130 $550.000
WK ZN PAV MRK REMOV (W)(WORD)
EA 15.000 $330.000 $211.000 $215.000 $750.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 116,359.000 $1.000 $1.050 $1.080 $0.650
WK ZN PAV MRK REMOV (Y)12"(SLD)
LF 340.000 $3.500 $4.900 $5.000 $10.500
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 5,439.000 $1.750 $1.450 $1.450 $1.300
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 463.000 $4.000 $5.300 $5.380 $4.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 2,677.000 $4.000 $10.600 $10.750 $7.000
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 153.000 $4.000 $5.300 $5.380 $5.000
PAVEMENT SEALER 4"
LF 93,112.000 $0.200 $0.150 $0.140 $0.180
PAVEMENT SEALER 8"
LF 5,439.000 $0.350 $0.350 $0.350 $0.360
PAVEMENT SEALER 12"
LF 616.000 $1.000 $1.050 $1.080 $0.750
PAVEMENT SEALER 24"
LF 2,677.000 $2.000 $2.100 $2.150 $1.500
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 8,325.000 $0.700 $0.600 $0.590 $0.650
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 47,473.000 $0.400 $0.500 $0.520 $0.650
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 37,314.000 $0.450 $0.500 $0.510 $0.650
PREFAB PAV MRK TY C (W) (ARROW)
EA 77.000 $266.000 $270.000 $274.130 $210.000
PREFAB PAV MRK TY C (W) (WORD)
EA 77.000 $269.000 $354.000 $360.130 $275.000
PREFAB PAV MRK TY C (W) (RR XING)
EA 4.000 $455.000 $1,000.000 $1,021.250 $650.000
REFL PAV MRKR TY I-C
EA 529.000 $4.000 $5.000 $5.110 $4.000
REFL PAV MRKR TY II-A-A
EA 187.000 $4.000 $5.000 $5.110 $5.000
REFL PAV MRKR TY II-C-R
EA 771.000 $4.000 $5.000 $5.110 $4.000
ELIM EXT PAV MRK & MRKS (4")
LF 183,301.000 $0.500 $0.450 $0.440 $0.600
ELIM EXT PAV MRK & MRKS (8")
LF 2,600.000 $0.850 $1.050 $1.080 $1.000
ELIM EXT PAV MRK & MRKS (12")
LF 564.000 $1.400 $2.600 $2.630 $3.000
ELIM EXT PAV MRK & MRKS (24")
LF 327.000 $3.200 $5.300 $5.380 $5.000
ELIM EXT PAV MRK & MRKS (ARROW)
EA 13.000 $40.000 $52.750 $53.750 $75.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 13.000 $50.000 $68.750 $69.880 $100.000
PAV SURF PREP FOR MRK (4")
LF 93,112.000 $0.100 $0.150 $0.130 $0.150
PAV SURF PREP FOR MRK (8")
LF 5,439.000 $0.200 $0.250 $0.250 $0.200
PAV SURF PREP FOR MRK (12")
LF 616.000 $0.500 $0.500 $0.480 $0.750
PAV SURF PREP FOR MRK (24")
LF 2,677.000 $1.000 $1.000 $1.030 $1.500
PAV SURF PREP FOR MRK (ARROW)
EA 77.000 $19.000 $37.000 $37.630 $45.000
PAV SURF PREP FOR MRK (WORD)
EA 77.000 $30.000 $47.500 $48.380 $55.000
PAV SURF PREP FOR MRK (RR XING)
EA 4.000 $103.000 $95.250 $96.750 $150.000
INSTALL HWY TRF SIG (ISOLATED)
EA 1.000 $24,274.000 $38,000.000 $48,375.000 $27,000.000
VEH SIG SEC (12")LED(GRN)
EA 13.000 $340.000 $356.000 $537.500 $300.000
VEH SIG SEC (12")LED(GRN ARW)
EA 4.000 $320.000 $356.000 $537.500 $300.000
VEH SIG SEC (12")LED(YEL)
EA 13.000 $337.000 $346.000 $537.500 $300.000
VEH SIG SEC (12")LED(YEL ARW)
EA 8.000 $340.000 $356.000 $537.500 $300.000
VEH SIG SEC (12")LED(RED)
EA 13.000 $337.000 $346.000 $537.500 $300.000
VEH SIG SEC (12")LED(RED ARW)
EA 8.000 $320.000 $356.000 $537.500 $300.000
PED SIG SEC (LED)(COUNTDOWN)
EA 10.000 $755.000 $845.000 $1,075.000 $755.000
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 13.000 $155.000 $195.000 $204.250 $240.000
BACKPLATE W/REF BRDR(5 SEC)(VENT)ALUM
EA 4.000 $174.000 $220.000 $241.880 $246.000
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 2,392.000 $2.300 $4.400 $2.150 $2.500
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 295.000 $2.500 $4.650 $3.230 $2.880
TRF SIG CBL (TY A)(14 AWG)(16 CONDR)
LF 845.000 $5.000 $5.000 $6.450 $6.150
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
LF 2,947.000 $1.750 $2.850 $2.150 $1.450
INS TRF SIG PL AM(S)1 ARM(50')LUM
EA 2.000 $26,368.000 $32,440.000 $44,720.000 $28,804.000
INS TRF SIG PL AM(S)1 ARM(55')LUM
EA 1.000 $34,100.000 $33,700.000 $46,010.000 $29,343.000
INS TRF SIG PL AM(S)1 ARM(60')LUM
EA 1.000 $33,300.000 $35,000.000 $46,547.500 $30,040.000
PED POLE ASSEMBLY
EA 8.000 $2,740.000 $2,800.000 $4,300.000 $2,400.000
RELOCATE PED POLE ASSEMBLY
EA 1.000 $2,000.000 $2,250.000 $3,225.000 $1,800.000
PED DETECT PUSH BUTTON (APS)
EA 16.000 $760.000 $895.000 $1,290.000 $750.000
PED DETECTOR CONTROLLER UNIT
EA 2.000 $3,650.000 $4,500.000 $2,150.000 $3,200.000
FULL - WIDTH MOWING
CYC 4.000 $2,000.000 $3,790.000 $5,000.000 $4,591.840
LITTER REMOVAL
CYC 4.000 $2,500.000 $1,850.000 $5,000.000 $1,845.550
SP MIXES SP-B PG64-22
TON 37,520.000 $95.000 $101.000 $130.000 $100.750
TACK COAT
GAL 10,251.000 $3.000 $4.500 $4.500 $4.500
NOISE WALL
SF 11,750.000 $65.000 $40.000 $35.000 $38.260
DEAD END ROADWAY BARRICADE
LF 24.000 $190.000 $125.000 $135.000 $124.080
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $14,000.000 $16,500.000 $20,000.000 $12,002.520
BBU SYSTEM (EXTERNAL BATT CABINET)
EA 1.000 $8,150.000 $7,850.000 $9,137.500 $8,200.000
TMA (STATIONARY)
DAY 210.000 $125.000 $141.000 $157.500 $162.380
TMA (MOBILE OPERATION)
HR 720.000 $75.000 $135.000 $73.500 $81.180
RVDS(PRESENCE DETECTION ONLY)
EA 2.000 $7,800.000 $9,450.000 $9,675.000 $8,000.000
RVDS(PRESENCE AND ADVANCE DET)
EA 2.000 $8,500.000 $16,750.000 $9,675.000 $8,000.000
SAWCUT, REMOVE, & DISPOSE ASPHALT PAV
SY 43.000 $20.000 $10.000 $21.530 $150.000
SAWCUT, REMOVE CONC PAV, DRVWY & SW
SY 157.000 $20.000 $10.000 $23.660 $250.000
REMOVE & DISPOSE GRAVEL DRIVE
SY 6.000 $20.000 $10.000 $21.730 $65.000
FIRE HYDRANT REMOVE, SALVAGE & TRANSP
EA 4.000 $500.000 $968.000 $1,215.100 $1,500.000
REMOVE & DISPOSE WATER VALVE
EA 4.000 $250.000 $303.000 $430.350 $1,800.000
ABAND 2"WL W FLWBLE BKFL INCLD SEAL RR
LF 200.000 $10.000 $10.000 $18.280 $35.000
ABAND 8"WL W FLWABL BKFIL INCLD SEAL RR
LF 200.000 $20.000 $17.000 $30.110 $40.000
SODDING
SY 2,914.000 $7.500 $5.000 $11.830 $6.000
GRAVEL DRIVE CONSTRUCT
SY 6.000 $30.000 $20.000 $53.980 $120.000
SIDEWALK 4" CLASS 'C' CONSTRUCT
SY 5.000 $60.000 $80.000 $86.280 $60.000
TEMP ASPH PAV CONSTRCT VAR THICK
SY 195.000 $60.000 $50.000 $69.880 $80.000
CONNECT TO EXISTING WATER
EA 6.000 $1,500.000 $2,840.000 $2,687.730 $5,600.000
6" WL FUR. & INSTALL BY OPEN CUT
LF 92.000 $60.000 $140.000 $110.850 $80.000
8" WL FURNISH & INSTALL BY OPEN CUT
LF 2,733.000 $90.000 $88.000 $124.490 $90.000
8" WL WITH 14" STEEL CASING BY OPEN CUT
LF 75.000 $200.000 $355.000 $304.350 $150.000
8" WL WITH 14" STEEL CASING BY BORE
LF 321.000 $350.000 $629.000 $585.990 $180.000
DUCTILE IRON FITTINGS FURNISH & INSTALL
TON 4.300 $6,000.000 $8,020.000 $11,825.320 $6,500.000
FURNISH AND INSTALL 6" VALVE
EA 11.000 $1,500.000 $2,380.000 $2,413.500 $2,500.000
FURNISH AND INSTALL 8" VALVE
EA 20.000 $2,000.000 $3,490.000 $3,536.820 $3,500.000
FURNISH AND INSTALL 2" BLOW OFF VALVE
EA 1.000 $1,500.000 $6,230.000 $6,558.890 $4,000.000
WATR SERV 1" SHRT SIDE NEW METR & CONCT
EA 6.000 $1,500.000 $2,840.000 $2,741.480 $5,500.000
WATR SERV 1" LNG SIDE NEW METR & CONNCT
EA 10.000 $2,000.000 $5,190.000 $4,832.260 $6,500.000
WATR SERV 2" SHRT SIDE NEW METR & CONCT
EA 1.000 $1,750.000 $6,600.000 $8,227.290 $6,500.000
FIRE HYD FUR & INSTL INCLUD CONC PAD
EA 8.000 $3,000.000 $6,350.000 $5,514.920 $11,000.000
WATER LINE TEST
EA 1.000 $5,000.000 $4,240.000 $6,451.390 $6,500.000
TRENCH SAFETY (FOR WATER)
LF 2,883.000 $2.000 $5.000 $2.150 $5.250
TRENCH & BORE PIT SAFETY AT RR
LS 1.000 $5,000.000 $15,730.000 $13,976.390 $18,000.000
PROVIDE TREE PROTECTION, PRIVATE PROPER
EA 5.000 $100.000 $1,000.000 $1,075.280 $2,500.000
WATR SERV 2" LNG SIDE NEW METR & CONNCT
EA 2.000 $2,500.000 $8,110.000 $9,890.700 $15,200.000
Totals: $43,170,225.640 $50,385,911.220 $52,296,916.821 $56,764,983.864