COLLIN FM 1378 (1392-01-050)

Items: 98

County: COLLIN
Length: N/A
Highway: FM 1378
District: DALLAS
Control Number: 1392-01-050
DBE Goal: N/A
Project: C 1392-1-50
Guaranty: N/A
Time: 210 WORKING DAYS
Engineer's Estimate: $5,236,362.01
Date: 06/30/2022 (3 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$5,236,362.01
$6,227,270.73
Over/Under Est: 18.92% $990,908.72
Over/Under Est: 21.07% $1,103,243.67
Amt Left: 1.8% $112,334.95
Over/Under Est: 30.73% $1,609,296.03
Amt Left: 9.93% $618,387.31
Delta: -7.98% -$506,052.36
Over/Under Est: 52.74% $2,761,510.94
Amt Left: 28.43% $1,770,602.22
Delta: -16.83% -$1,152,214.91

Bid Items & Bid Tabulations

98 Total 0 of 98
COLLIN  |  FM 1378  |  DALLAS  |  1392-01-050  |  06/30/2022  |  $5,236,362.01  |  C 1392-1-50  |  REHAB EXIST ROADWAY  |  210 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FOUTSCO PAVING COMPANY, LLC
TEXAS MATERIALS GROUP, INC.
AUSTIN BRIDGE & ROAD SERVICES, LP
ED BELL CONSTRUCTION COMPANY
PREPARING ROW
STA 199.400 $600.000 $50.000 $1,000.000 $1,000.000 $4,000.000
REMOVING CONC (DRIVEWAYS)
SY 3,090.000 $12.500 $10.000 $17.000 $18.860 $16.000
REMOVING STAB BASE & ASPH PAV (4"-12")
SY 4,190.000 $9.500 $40.000 $12.250 $19.760 $20.000
EXCAVATION (ROADWAY)
CY 4,054.000 $11.500 $30.000 $19.000 $5.270 $20.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 5,953.000 $11.500 $20.000 $10.230 $10.790 $20.000
BACKFILL (TY A OR B)
STA 199.400 $220.000 $100.000 $190.000 $166.300 $150.000
BLADING
STA 199.400 $210.000 $75.000 $112.000 $52.290 $75.000
BLOCK SODDING
SY 50,958.000 $2.900 $3.000 $4.310 $5.200 $4.420
DRILL SEED (TEMP)(WARM OR COOL)
SY 50,958.000 $0.120 $0.150 $0.102 $1.250 $0.200
VEGETATIVE WATERING
MG 15,161.000 $2.500 $0.010 $0.010 $0.160 $1.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(11")
SY 7,582.000 $65.000 $100.000 $95.000 $112.480 $95.000
PLANE ASPH CONC PAV (2")
SY 57,516.000 $3.000 $1.000 $2.050 $1.100 $2.500
CEM STABIL BKFL
CY 65.000 $215.000 $150.000 $255.000 $250.000 $250.000
CUT & RESTORING PAV
SY 197.000 $130.000 $100.000 $77.000 $130.700 $135.000
FLOWABLE BACKFILL
CY 4.000 $250.000 $400.000 $408.000 $400.000 $350.000
TRENCH EXCAVATION PROTECTION
LF 52.000 $18.000 $10.000 $10.500 $10.000 $20.000
TEMPORARY SPL SHORING
SF 2,288.000 $32.000 $10.000 $21.000 $30.000 $75.000
RIPRAP (CONC)(4 IN)
CY 6.000 $500.000 $1,000.000 $900.000 $750.000 $1,000.000
RIPRAP (STONE COMMON)(GROUT)(12 IN)
CY 179.000 $200.000 $250.000 $281.000 $298.290 $300.000
RIPRAP (MOW STRIP)(4 IN)
CY 55.000 $480.000 $650.000 $690.000 $600.000 $800.000
CONC BOX CULV (3 FT X 2 FT)
LF 67.000 $310.000 $200.000 $255.000 $223.000 $250.000
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
LF 12.000 $750.000 $600.000 $745.000 $650.000 $825.000
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
LF 18.000 $600.000 $750.000 $916.000 $800.000 $1,000.000
RC PIPE (CL III)(18 IN)
LF 2,028.000 $43.000 $48.000 $56.000 $52.670 $55.000
RC PIPE (CL III)(24 IN)
LF 585.000 $65.000 $70.000 $76.000 $72.380 $75.000
RC PIPE (CL III)(30 IN)
LF 184.000 $87.000 $90.000 $97.000 $93.590 $110.000
RC PIPE (CL III)(36 IN)
LF 22.000 $123.000 $200.000 $140.000 $135.000 $150.000
RC PIPE (CL III)(42 IN)
LF 30.000 $145.000 $200.000 $225.000 $213.000 $250.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 8.000 $4,650.000 $2,500.000 $2,800.000 $2,700.000 $7,200.000
HEADWALL (CH - PW - 0) (DIA= 42 IN)
EA 4.000 $8,500.000 $7,000.000 $7,100.000 $6,900.000 $12,600.000
HEADWALL (CH - PW - S) (DIA= 30 IN)
EA 2.000 $6,000.000 $4,500.000 $5,000.000 $4,800.000 $9,000.000
WINGWALL (PW - 1) (HW=4 FT)
EA 2.000 $9,500.000 $8,000.000 $8,300.000 $8,100.000 $12,000.000
WINGWALL (PW - 1) (HW=9 FT)
EA 4.000 $26,000.000 $18,000.000 $20,000.000 $19,000.000 $27,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 108.000 $660.000 $1,000.000 $1,100.000 $1,150.000 $735.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 22.000 $1,000.000 $1,250.000 $1,400.000 $1,350.000 $1,050.000
SET (TY II) (30 IN) (RCP) (3: 1) (C)
EA 2.000 $1,500.000 $1,300.000 $1,400.000 $1,330.000 $1,260.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 6.000 $2,500.000 $2,700.000 $2,925.000 $2,800.000 $1,785.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 2.000 $5,500.000 $4,000.000 $4,950.000 $4,800.000 $5,250.000
CLEAN EXIST CULVERTS
EA 1.000 $1,800.000 $3,000.000 $2,600.000 $2,500.000 $2,100.000
REMOV STR (SET)
EA 83.000 $210.000 $200.000 $160.000 $155.000 $420.000
REMOV STR (WINGWALL)
EA 4.000 $1,100.000 $800.000 $812.000 $800.000 $1,500.000
REMOV STR (HEADWALL)
EA 5.000 $950.000 $750.000 $765.000 $750.000 $1,500.000
REMOV STR (PIPE)
LF 2,537.500 $12.000 $15.000 $8.200 $15.000 $12.000
MOBILIZATION
LS 1.000 $470,000.000 $423,000.000 $549,507.000 $684,565.800 $725,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $9,000.000 $20,000.000 $12,500.000 $30,000.000 $34,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 470.000 $28.500 $26.000 $34.000 $29.000 $34.650
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 110.000 $46.000 $58.000 $59.000 $48.000 $42.000
ROCK FILTER DAMS (REMOVE)
LF 580.000 $8.000 $15.000 $10.150 $14.000 $21.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 164.000 $24.000 $25.000 $17.000 $19.000 $23.630
CONSTRUCTION EXITS (REMOVE)
SY 164.000 $8.500 $11.000 $5.100 $12.000 $12.600
TEMP SEDMT CONT FENCE (INSTALL)
LF 7,330.000 $2.000 $2.000 $3.400 $1.600 $1.440
TEMP SEDMT CONT FENCE (REMOVE)
LF 7,330.000 $0.600 $0.500 $0.520 $0.510 $0.210
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 820.000 $4.200 $4.000 $5.700 $3.750 $3.940
BIODEG EROSN CONT LOGS (REMOVE)
LF 820.000 $0.800 $0.500 $1.030 $1.000 $1.050
DRIVEWAYS (CONC)
SY 3,010.000 $93.000 $105.000 $104.000 $107.770 $100.000
DRIVEWAYS (ACP)
SY 4,340.000 $45.000 $55.000 $63.000 $55.540 $65.000
RUMBLE STRIPS (SHOULDER)
LF 38,016.000 $0.350 $0.150 $0.230 $0.220 $0.240
RUMBLE STRIPS (CENTERLINE)
LF 18,123.000 $0.350 $0.150 $0.230 $0.220 $0.240
MTL W-BEAM GD FEN (TIM POST)
LF 1,487.500 $19.000 $22.000 $24.000 $22.000 $23.630
SHORT RADIUS
LF 80.000 $30.000 $50.000 $53.000 $40.000 $51.450
DRIVEWAY TERMINAL ANCHOR SECTION
EA 4.000 $800.000 $1,250.000 $1,400.000 $1,076.000 $1,312.500
REMOVE METAL BEAM GUARD FENCE
LF 1,837.500 $2.600 $2.000 $3.350 $1.500 $3.150
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $2,500.000 $3,000.000 $3,600.000 $2,950.000 $3,379.950
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 21.000 $235.000 $250.000 $265.000 $259.000 $267.750
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 4.000 $280.000 $265.000 $275.000 $299.000 $278.250
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 2.000 $550.000 $750.000 $775.000 $739.000 $787.500
GROUND BOX TY BATTERY (162915)W/APRON
EA 1.000 $1,830.000 $2,750.000 $3,550.000 $2,500.000 $525.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 108.000 $460.000 $695.000 $710.000 $649.000 $729.750
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 14.000 $500.000 $785.000 $805.000 $669.000 $824.250
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $640.000 $755.000 $785.000 $729.000 $792.750
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 3.000 $790.000 $1,225.000 $1,275.000 $1,069.000 $1,286.250
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 4.000 $1,000.000 $1,375.000 $1,410.000 $1,269.000 $1,443.750
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 34.000 $28.000 $27.000 $28.000 $22.000 $28.350
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 20.000 $55.000 $55.000 $57.000 $65.000 $210.000
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 458.000 $0.500 $0.350 $0.370 $0.350 $0.320
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 40,384.000 $0.350 $0.280 $0.290 $0.280 $0.320
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,236.000 $2.250 $0.800 $1.080 $3.660 $4.000
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 213.000 $1.100 $1.450 $1.500 $1.450 $3.150
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 42.000 $1.500 $1.600 $1.650 $1.600 $4.200
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 3,021.000 $1.000 $0.920 $0.950 $0.920 $1.310
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 226.000 $0.700 $3.750 $3.820 $3.750 $6.300
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 474.000 $6.500 $6.700 $6.820 $6.700 $8.400
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 16.000 $140.000 $130.000 $132.000 $130.000 $183.750
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 16.000 $200.000 $156.000 $160.000 $156.000 $210.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 33,728.000 $0.400 $0.430 $0.440 $0.430 $0.470
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 3,314.000 $0.450 $0.620 $0.640 $0.620 $0.680
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 458.000 $0.400 $0.430 $0.440 $0.430 $0.530
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 40,384.000 $0.400 $0.430 $0.440 $0.430 $0.500
REFL PAV MRKR TY I-C
EA 161.000 $5.000 $5.000 $5.120 $5.000 $5.250
REFL PAV MRKR TY II-A-A
EA 1,141.000 $4.000 $5.000 $5.120 $5.000 $5.250
RELOCT RDSD FLSH BCN AM (SOLAR PWRD)
EA 1.000 $6,000.000 $3,500.000 $4,200.000 $5,000.000 $10,000.000
SP MIXES SP-B PG64-22
TON 9,721.000 $98.000 $135.000 $120.000 $125.000 $140.000
SP MIXES SP-C SAC-A PG64-22
TON 8,209.000 $100.000 $140.000 $130.000 $133.000 $138.000
TACK COAT
GAL 5,823.000 $3.000 $5.000 $3.650 $4.500 $1.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $15,000.000 $12,000.000 $9,000.000 $15,000.000
TMA (STATIONARY)
DAY 225.000 $250.000 $1.000 $290.000 $173.010 $157.500
TMA (MOBILE OPERATION)
HR 200.000 $100.000 $1.000 $1.000 $15.000 $73.500
REML & DISPL DRIFTWOOD & DEBRIS
LS 1.000 $5,000.000 $5,000.000 $16,000.000 $6,310.190 $40,000.000
Totals: $5,236,362.010 $6,227,270.730 $6,339,605.691 $6,845,658.046 $7,997,872.960