Show Job Controls
Bid Cobra

COLLIN FM 1378 (1392-01-044)

Items: 197

County: COLLIN
Length: N/A
Highway: FM 1378
District: DALLAS
Control Number: 1392-01-044
DBE Goal: N/A
Project: CM 2023(702)
Guaranty: N/A
Time: 659 WORKING DAYS
Engineer's Estimate: $11,334,044.30
Date: 05/05/2023 (3 years ago)
Contract Number: N/A
Type: INTERSECTION IMPROVEMENT
Mail/Deliver Bids To: N/A
JENNIFER VORSTER
GERALD WALTMAN
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (1)
E
Engineer's Estimate
$11,334,044.30
$13,639,341.22
Over/Under Est: 20.34% $2,305,296.92
Subcontractor Percentage Amount
PEACHTREE CONSTRUCTION, LTD. 13.75% $1,908,048.81
VENUS CONSTRUCTION COMPANY 12.81% $1,777,607.66
DURABLE SPECIALTIES, INC. 3.76% $521,764.62
USA SWPPP INSPECTIONS, INC.DBA USA EROSION 1.96% $271,983.69
TEXOP CONSTRUCTION 1.95% $270,596.01
TRAFFIC HIGHWAY MAINTENANCE, LLC 0.91% $126,278.14
STRIPE-A-ZONE, LLC 0.91% $126,278.14
AWP SAFETY 0.63% $87,423.33
WIMS ENVIRONMENTAL CONSTRUCTION, LTD. 0.56% $77,709.62
BREDA COMPANY, INC. 0.38% $52,731.53
SYNERGY SIGNS & SERVICES LLC 0.33% $45,793.17
T-BAR FENCE, INC. 0.24% $33,304.12
ACT SAW CUTTING & REMOVAL 0.13% $18,039.73
SOUTHERN CROSS CONTRACTORS, LLC 0.06% $8,326.03
CHLOR-SERV, INC. 0.04% $5,550.69
REYNOLDS ASPHALT & CONSTRUCTION COMPANY 0.00% $0.00
TEX-BRASKA, LLC 0.00% $0.00
Total: 38.42% $5,331,435.29

Bid Items & Bid Tabulations

197 Total 0 of 197
COLLIN  |  FM 1378  |  DALLAS  |  1392-01-044  |  05/05/2023  |  $11,334,044.30  |  CM 2023(702)  |  INTERS IMPRV  |  659 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ED BELL CONSTRUCTION COMPANY
PREPARING ROW
STA 60.610 $8,000.000 $6,500.000
REMOVING CONC (PAV)
SY 4,394.000 $11.700 $15.000
REMOVING CONC (DRIVEWAYS)
SY 381.000 $17.410 $15.000
REMOVING CONCRETE(MOW STRIP)
LF 1,089.000 $6.220 $7.500
REMOVING STAB BASE & ASPH PAV (4"-22")
SY 18,571.000 $5.220 $13.650
REMOVING STAB BASE AND ASPH PAV (5"-8")
SY 1,257.000 $3.000 $9.450
EXCAVATION (ROADWAY)
CY 12,407.000 $10.000 $5.000
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
CY 21,611.000 $15.000 $31.500
COMPOST MANUF TOPSOIL (4")
SY 36,897.000 $1.580 $0.750
BLOCK SODDING
SY 36,897.000 $4.000 $4.000
DRILL SEED (TEMP)(WARM OR COOL)
SY 10,654.000 $0.110 $0.150
VEGETATIVE WATERING
MG 7,074.000 $5.920 $1.000
LIME (HYD, COM, OR QK(SLURRY))
TON 695.000 $310.000 $300.000
LIME TRT (EXST MATL)(8")
SY 41,501.000 $4.000 $8.000
CONC PVMT (CONT REINF - CRCP) (8")
SY 23,529.000 $125.000 $90.000
CURB (TYPE II)
LF 8,136.000 $8.000 $4.000
CUT & RESTORE ASPH PAVING
SY 240.000 $90.170 $200.000
TRENCH EXCAVATION PROTECTION
LF 1,917.000 $2.500 $10.000
TEMPORARY SPL SHORING
SF 828.000 $26.270 $100.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 8.000 $300.000 $532.130
DRILL SHAFT (TRF SIG POLE) (30 IN)
LF 11.000 $286.040 $580.500
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 13.000 $312.630 $682.630
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 22.000 $575.380 $784.750
RIPRAP (MOW STRIP)(4 IN)
CY 13.000 $572.370 $1,000.000
RIPRAP (STONE COMMON)(GROUT)(18 IN)
CY 165.000 $194.650 $750.000
RAIL (HANDRAIL)(TY E)
LF 70.000 $144.400 $300.000
RAIL (TY PR11)
LF 58.000 $89.690 $300.000
CONC BOX CULV (6 FT X 4 FT)
LF 132.000 $430.000 $480.000
RC PIPE (CL III)(18 IN)
LF 633.000 $75.330 $60.000
RC PIPE (CL III)(24 IN)
LF 3,955.000 $105.000 $90.000
RC PIPE (CL III)(42 IN)
LF 394.000 $187.560 $200.000
RC PIPE (CL III)(48 IN)
LF 64.000 $195.600 $275.000
MANH (COMPL)(PRM)(72IN)
EA 1.000 $10,000.000 $11,550.000
INLET (COMPL)(PCU)(3FT)(BOTH)
EA 33.000 $8,000.000 $10,500.000
INLET (COMPL)(PSL)(FG)(5FTX5FT-4FTX4FT)
EA 2.000 $7,350.000 $8,400.000
HEADWALL (CH - PW - 0) (DIA= 42 IN)
EA 1.000 $8,300.000 $8,400.000
HEADWALL (CH - PW - 0) (DIA= 48 IN)
EA 2.000 $10,500.000 $11,550.000
HEADWALL (CH - PW - S) (DIA= 42 IN)
EA 1.000 $9,750.000 $9,450.000
WINGWALL (PW - 1) (HW=10 FT)
EA 2.000 $45,237.500 $52,500.000
SET (TY II) (18 IN) (RCP) (3: 1) (P)
EA 1.000 $850.000 $1,500.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 22.000 $1,000.000 $1,050.000
REMOV STR (SET)
EA 27.000 $413.140 $400.000
REMOV STR (HEADWALL)
EA 10.000 $1,436.960 $2,000.000
REMOV STR (PIPE)
LF 429.000 $19.370 $30.000
REMOV STR (DRIVEWAY CULVERT)
EA 16.000 $745.480 $750.000
MOBILIZATION
LS 1.000 $900,000.000 $1,200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 26.000 $12,000.000 $21,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 364.000 $28.800 $30.100
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 156.000 $55.000 $63.430
ROCK FILTER DAMS (REMOVE)
LF 520.000 $9.780 $10.750
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 78.000 $20.450 $30.100
CONSTRUCTION EXITS (REMOVE)
SY 78.000 $9.840 $10.210
TEMP SEDMT CONT FENCE (INSTALL)
LF 8,236.000 $1.760 $2.850
TEMP SEDMT CONT FENCE (REMOVE)
LF 8,236.000 $0.710 $0.700
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 737.000 $6.070 $4.570
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 401.000 $5.090 $5.640
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,138.000 $1.420 $1.080
CONSTRUCTING DETOURS
SY 5,569.000 $75.000 $120.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 2,310.000 $32.520 $25.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 1,980.000 $9.330 $7.500
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 2,280.000 $10.430 $15.000
CONC CURB (DOWEL)
LF 378.000 $25.000 $30.000
DRIVEWAYS (CONC)
SY 1,149.000 $62.370 $125.000
DRIVEWAYS (ACP)
SY 373.000 $52.640 $111.000
CONC SIDEWALKS (4")
SY 406.000 $70.000 $100.000
CURB RAMPS (TY 1)
EA 8.000 $2,338.940 $3,000.000
CURB RAMPS (TY 7)
EA 8.000 $2,161.400 $3,000.000
CURB RAMPS (TY 10)
EA 4.000 $2,156.430 $3,000.000
CONC MEDIAN
SY 592.000 $70.560 $100.000
CONC DIRECTIONAL ISLAND
SY 306.000 $67.430 $100.000
RIGHT OF WAY MARKERS
EA 18.000 $154.630 $525.000
MTL W-BEAM GD FEN (TIM POST)
LF 187.500 $21.730 $32.250
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,100.000 $2,150.000
REMOVE METAL BEAM GUARD FENCE
LF 708.000 $3.460 $10.750
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $2,742.600 $4,300.000
GUARDRAIL END TREATMENT (REMOVE)
EA 6.000 $253.210 $430.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 6.000 $1,424.380 $1,523.940
CRASH CUSH ATTEN (REMOVE)
EA 6.000 $896.200 $761.970
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 6.000 $6,800.000 $11,560.080
RELOCATE EXISTING MAILBOX
EA 8.000 $400.000 $537.500
IN RD IL AM (TY SA) 40T-8 (250W) S
EA 1.000 $5,500.000 $8,600.000
CONDT (PVC) (SCH 40) (2")
LF 97.000 $14.410 $35.480
CONDT (PVC) (SCH 40) (3")
LF 206.000 $12.850 $38.700
CONDT (PVC) (SCH 40) (3") (BORE)
LF 393.000 $30.150 $69.880
CONDT (PVC) (SCH 80) (2")
LF 31.000 $36.280 $37.630
ELEC CONDR (NO.12) INSULATED
LF 312.000 $1.030 $2.150
ELEC CONDR (NO.8) INSULATED
LF 1,166.000 $1.560 $2.150
ELEC CONDR (NO.6) BARE
LF 655.000 $2.080 $3.230
ELEC CONDR (NO.6) INSULATED
LF 42.000 $1.590 $3.230
GROUND BOX TY A (122311)W/APRON
EA 1.000 $893.830 $2,408.000
GROUND BOX TY C (162911)W/APRON
EA 5.000 $971.420 $2,558.500
ELC SRV TY D 120/240 070(NS)SS(E)PS(U)
EA 1.000 $5,790.010 $11,825.000
ALUMINUM SIGNS (TY A)
SF 6.250 $18.110 $55.900
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 27.000 $415.130 $682.630
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 5.000 $529.500 $881.500
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 4.000 $935.000 $1,123.380
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 1.000 $786.850 $1,381.380
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 12.000 $95.400 $53.750
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 29,083.000 $1.080 $0.940
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 121.000 $8.000 $9.940
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 29,608.000 $1.100 $0.940
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 182.000 $2.500 $5.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,335.000 $1.100 $1.290
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 470.000 $6.670 $7.530
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 16.000 $125.290 $158.030
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 16.000 $154.290 $213.930
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 14.000 $82.210 $66.650
REFL PAV MRK TY II (W) 6" (BRK)
LF 963.000 $0.500 $1.180
REFL PAV MRK TY II (W) 6" (DOT)
LF 182.000 $0.450 $4.300
REFL PAV MRK TY II (W) 6" (SLD)
LF 4,486.000 $0.250 $0.460
REFL PAV MRK TY II (W) 8" (SLD)
LF 2,335.000 $0.420 $1.610
REFL PAV MRK TY II (W) 24" (SLD)
LF 363.000 $3.170 $3.980
REFL PAV MRK TY II (W) (ARROW)
EA 16.000 $59.270 $91.380
REFL PAV MRK TY II (W) (WORD)
EA 16.000 $62.750 $118.250
REFL PAV MRK TY II (W) 36" (YLD TRI)
EA 14.000 $27.830 $40.850
REFL PAV MRK TY II (Y) 6" (SLD)
LF 4,579.000 $0.500 $0.460
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 1,230.000 $0.600 $1.130
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 9,015.000 $0.530 $0.990
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 7,826.000 $0.750 $0.990
REFL PAV MRKR TY II-A-A
EA 219.000 $5.000 $5.590
REFL PAV MRKR TY II-C-R
EA 178.000 $4.210 $5.590
ELIM EXT PAV MRK & MRKS (4")
LF 25,890.000 $0.520 $0.550
ELIM EXT PAV MRK & MRKS (8")
LF 172.000 $0.910 $3.230
ELIM EXT PAV MRK & MRKS (24")
LF 46.000 $3.120 $11.830
ELIM EXT PAV MRK & MRKS (ARROW)
EA 4.000 $47.300 $139.750
ELIM EXT PAV MRK & MRKS (WORD)
EA 4.000 $57.200 $161.250
PAV SURF PREP FOR MRK (6")
LF 18,026.000 $0.150 $0.220
PAV SURF PREP FOR MRK (8")
LF 2,335.000 $0.130 $0.470
PAV SURF PREP FOR MRK (24")
LF 470.000 $1.330 $2.040
PAV SURF PREP FOR MRK (ARROW)
EA 16.000 $24.950 $62.350
PAV SURF PREP FOR MRK (WORD)
EA 16.000 $31.030 $66.650
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 14.000 $25.640 $80.630
PAV SURF PREP FOR MRK (RPM)
EA 397.000 $1.100 $3.230
INSTALL HWY TRF SIG (ISOLATED)
EA 1.000 $32,108.620 $45,150.000
REMOVING TRAFFIC SIGNALS
EA 1.000 $9,772.500 $6,987.500
TEMP TRAF SIGNALS
EA 1.000 $100,000.000 $109,650.000
VEH SIG SEC (12")LED(GRN)
EA 4.000 $327.380 $779.380
VEH SIG SEC (12")LED(GRN ARW)
EA 4.000 $372.380 $779.380
VEH SIG SEC (12")LED(YEL)
EA 4.000 $392.610 $779.380
VEH SIG SEC (12")LED(YEL ARW)
EA 4.000 $373.670 $779.380
VEH SIG SEC (12")LED(RED)
EA 4.000 $368.390 $779.380
VEH SIG SEC (12")LED(RED ARW)
EA 4.000 $345.560 $779.380
PED SIG SEC (LED)(COUNTDOWN)
EA 4.000 $529.990 $1,370.630
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 8.000 $123.000 $155.880
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 454.000 $1.930 $3.230
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 561.000 $3.860 $3.230
TRF SIG CBL (TY A)(14 AWG)(10 CONDR)
LF 692.000 $2.380 $7.530
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
LF 704.000 $1.280 $2.150
RELOCT RDSD FLSH BCN AM (SOLAR PWRD)
EA 1.000 $3,500.000 $3,762.500
INS TRF SIG PL AM(S)1 ARM(28')LUM
EA 1.000 $12,500.000 $19,350.000
INS TRF SIG PL AM(S)1 ARM(40')LUM
EA 1.000 $15,430.000 $26,337.500
INS TRF SIG PL AM(S)1 ARM(65')LUM
EA 1.000 $36,240.000 $49,450.000
PED POLE ASSEMBLY
EA 2.000 $3,589.550 $6,450.000
PED DETECT PUSH BUTTON (APS)
EA 4.000 $1,203.260 $1,290.000
PED DETECTOR CONTROLLER UNIT
EA 1.000 $3,855.250 $5,375.000
FULL - WIDTH MOWING
CYC 3.000 $3,704.000 $3,300.000
LITTER REMOVAL
CYC 3.000 $2,500.000 $3,300.000
DECOMPOSED GRANITE (3" DEPTH)
SY 2,374.000 $30.000 $50.000
SP MIXES SP-B PG64-22
TON 10,656.000 $105.000 $150.000
SP MIXES SP-C SAC-B PG64-22
TON 1,702.000 $125.000 $165.000
TACK COAT
GAL 1,850.000 $3.000 $1.080
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $7,881.720 $21,000.000
BBU SYSTEM (EXTERNAL BATT CABINET)
EA 1.000 $7,860.530 $10,320.000
TMA (STATIONARY)
DAY 432.000 $93.430 $105.000
TMA (MOBILE OPERATION)
HR 150.000 $64.280 $52.500
RVDS(PRESENCE AND ADVANCE DET)
EA 3.000 $9,020.330 $10,212.500
VIVDS TEMPORARY
EA 1.000 $23,366.670 $32,250.000
20" AWWA C303 RCCP
LF 1,453.000 $300.000 $365.500
20"X20" 90 DEGREE RCCP BEND
EA 2.000 $3,000.000 $16,662.500
20"X20" 73 DEGREE RCCP BEND
EA 1.000 $5,000.000 $16,662.500
20" X 20" 45 DEGREE RCCP BEND
EA 7.000 $3,000.000 $11,287.500
REMOVE EXISTING WATER MAIN
LS 1.000 $367,500.000 $103,200.000
THRUST RESTRAINT
LF 547.000 $170.000 $225.750
EXISTING PIPE JOINT RESTRAINTS
LF 110.000 $500.000 $408.500
CONNECT TO EXISTING WATERLINE
EA 2.000 $20,000.000 $45,150.000
TESTING AND DISINFECTION
LS 1.000 $8,718.000 $125,237.500
6" COMBINATION AIR RELEASE ASSEMBLY
EA 1.000 $40,000.000 $64,500.000
8" BLOWOFF VALVE ASSEMBLY
EA 2.000 $40,000.000 $61,275.000
TRENCH EXCAVATION SAFETY & SUPPORT
LF 1,453.000 $5.000 $2.150
SALVAGE EXIST BLOW-OFF VALVE & PIPING
EA 2.000 $1,000.000 $7,740.000
SILT FENCE
LF 1,453.000 $10.000 $5.380
SAND BACKFILL
CY 45.000 $25.000 $123.630
FLOWABLE FILL
CY 22.000 $100.000 $252.630
REM DERILICT WOODEN SHED
LS 1.000 $100.000 $53,750.000
REM & REPLACE WOODEN FENCE
LF 668.000 $40.000 $106.430
REM & REPLACE CHAIN LINK FENCE
LS 92.000 $25.000 $70.950
REM & REPLACE BARBED WIRE FENCE
LF 30.000 $10.000 $32.250
REM & REPLACE BOX WIRE FENCE
EA 200.000 $10.000 $16.130
REM & REPLACE 12IN CMP
LF 20.000 $100.000 $134.380
INSTALL ACCESS GATE
EA 5.000 $500.000 $2,150.000
REMOVE & REPLACE TREE
EA 2.000 $2,000.000 $1,290.000
REMOVE TREE
EA 8.000 $100.000 $1,720.000
REMOVE & REPLACE ASPHALT DRIVEWAY
SY 406.000 $100.000 $505.250
RESTORATION & SEEDING
AC 2.000 $1,500.000 $5,375.000
SWPPP
EA 1.000 $5,000.000 $8,062.500
DISP OF HVY CHLOR WATER MN FLUS WATER
LF 1,453.000 $6.000 $80.630
CONST SURV & STAKING (W & WW MAINS)
LF 1,453.000 $8.000 $10.750
Totals: $11,334,044.302 $13,639,341.230