COLLIN FM 547 (1014-01-014)

Items: 90

County: COLLIN
Length: N/A
Highway: FM 547
District: DALLAS
Control Number: 1014-01-014
DBE Goal: N/A
Project: BR 2023(917)
Guaranty: N/A
Time: 290 WORKING DAYS
Engineer's Estimate: $5,137,605.65
Date: 06/02/2023 (3 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
JENNIFER VORSTER
GERALD WALTMAN
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$5,137,605.65
$4,898,841.15
Over/Under Est: -4.65% -$238,764.50
Over/Under Est: 7.25% $372,681.16
Amt Left: 12.48% $611,445.66
$5,569,299.95
Over/Under Est: 8.4% $431,694.30
Amt Left: 13.69% $670,458.80
Delta: -1.07% -$59,013.14
Over/Under Est: 9.6% $493,241.16
Amt Left: 14.94% $732,005.66
Delta: -1.11% -$61,546.86
$6,118,000.00
Over/Under Est: 19.08% $980,394.35
Amt Left: 24.89% $1,219,158.85
Delta: -8.65% -$487,153.19
Over/Under Est: 44.04% $2,262,378.95
Amt Left: 51.06% $2,501,143.45
Delta: -20.95% -$1,281,984.60
Subcontractor Percentage Amount
HILBASH INVESTMENT LLC 10.30% $509,447.39
PEACHTREE CONSTRUCTION, LTD. 6.54% $323,474.36
WYLIE DRILLING & DRAINAGE, INC. 4.40% $217,628.01
USA SWPPP INSPECTIONS, INC.DBA USA EROSION 2.60% $128,598.37
ODUM SERVICES, LLC 1.35% $66,772.23
HERMANOS STEEL, LLC 0.78% $38,579.51
DUSTROL, INC. 0.53% $26,214.28
PENHALL COMPANY 0.48% $23,741.24
KING GEORGE TRAFFIC SOLUTIONS LLC 0.45% $22,257.41
FC TRAFFIC CONTROL, INC. 0.39% $19,289.76
DFW REBAR, INC. 0.11% $5,440.70
Total: 27.93% $1,381,443.26

Bid Items & Bid Tabulations

90 Total 0 of 90
COLLIN  |  FM 547  |  DALLAS  |  1014-01-014  |  06/02/2023  |  $5,137,605.65  |  BR 2023(917)  |  BRIDGE REPL  |  290 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
INDUS ROAD & BRIDGE, INC.
SEMA CONSTRUCTION, INC.
FLUOR HEAVY CIVIL, LLC
ED BELL CONSTRUCTION COMPANY
TEXAS-REYES GROUP LTD.
R CONSTRUCTION CIVIL, LLC
PREPARING ROW
STA 12.100 $12,000.000 $4,800.000 $45,524.110 $43,101.670 $18,900.000 $12,100.000 $15,500.000
REMOVING STAB BASE AND ASPH PAV (6")
SY 719.000 $7.000 $16.000 $12.000 $9.630 $1.000 $4.500 $30.000
REMOV STAB BASE & ASPH PAV (8"-20")
SY 1,945.000 $13.000 $24.000 $15.000 $9.550 $13.000 $18.000 $35.000
EXCAVATION (ROADWAY)
CY 3,408.000 $20.000 $16.000 $14.000 $30.470 $30.000 $18.000 $43.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 3,960.000 $25.000 $15.000 $23.000 $60.000 $25.000 $19.000 $40.000
COMPOST MANUF TOPSOIL (4")
SY 7,893.000 $2.000 $3.000 $2.500 $2.990 $1.000 $2.000 $1.000
BLOCK SODDING
SY 7,893.000 $5.000 $6.000 $5.000 $4.790 $4.990 $4.500 $6.000
DRILL SEED (TEMP)(WARM OR COOL)
SY 7,893.000 $0.150 $0.390 $0.350 $0.300 $0.320 $0.500 $0.400
VEGETATIVE WATERING
MG 2,349.000 $12.000 $30.000 $1.000 $0.010 $1.000 $31.500 $49.000
FL BS (CMP IN PLC)(TY D GR1-2)(12")
SY 568.000 $25.000 $39.000 $26.000 $50.000 $50.000 $66.000 $58.000
FL BS (CMP IN PLC)(TY D GR 1-2)(17")
SY 2,783.000 $30.000 $45.000 $32.000 $60.000 $60.000 $71.000 $70.000
EMULS ASPH (PRIME)(MS-2 OR SS-1)
GAL 670.000 $5.560 $31.000 $22.000 $31.630 $34.440 $7.000 $36.000
ASPH (CRS-2P)
GAL 354.000 $7.000 $33.000 $36.200 $34.120 $30.980 $5.000 $39.000
ASPH (RC-250)
GAL 153.000 $6.000 $42.000 $21.500 $43.370 $39.380 $5.000 $49.000
AGGR (TY-B GR-5 OR TY-L GR-5)
CY 4.400 $400.000 $2,799.000 $3,300.000 $2,891.630 $2,625.000 $200.000 $3,300.000
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
GAL 1,137.000 $8.000 $23.000 $15.000 $23.940 $21.740 $6.500 $28.000
AGGR (TY-B GR-4 OR TY-L GR-4 SAC-B)
CY 4.600 $450.000 $2,799.000 $2,500.000 $2,891.630 $2,625.000 $200.000 $3,300.000
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
CY 25.800 $250.000 $1,900.000 $2,200.000 $1,966.310 $1,785.000 $200.000 $2,220.000
CEM STABIL BKFL
CY 581.000 $325.000 $210.000 $225.000 $250.000 $185.000 $170.000 $105.000
TEMPORARY SPL SHORING
SF 1,202.000 $40.000 $44.000 $90.000 $71.880 $85.000 $194.000 $50.000
DRILL SHAFT (18 IN)
LF 180.000 $175.000 $85.000 $78.000 $76.330 $75.000 $163.000 $155.000
DRILL SHAFT (24 IN)
LF 1,311.000 $250.000 $135.000 $140.000 $136.400 $150.000 $181.000 $455.000
DRILL SHAFT (36 IN)
LF 720.000 $360.000 $175.000 $170.000 $200.000 $185.000 $187.000 $660.000
CL C CONC (ABUT)(HPC)
CY 127.200 $1,600.000 $957.010 $1,500.000 $1,638.400 $2,500.000 $1,400.000 $5,300.000
CL C CONC (CAP)(HPC)
CY 37.600 $1,600.000 $1,400.000 $2,300.000 $2,104.430 $2,500.000 $2,100.000 $3,900.000
CL C CONC (COLUMN)(HPC)
CY 23.500 $2,400.000 $1,500.000 $2,000.000 $3,165.190 $2,500.000 $3,926.500 $5,450.000
REINF CONC SLAB (HPC)
SF 3,675.000 $25.000 $31.000 $32.000 $40.420 $50.000 $55.000 $35.000
REINF CONC SLAB (SLAB BEAM)(HPC)
SF 8,393.000 $25.000 $25.000 $19.000 $20.830 $25.000 $47.000 $21.000
APPROACH SLAB (HPC)
CY 275.800 $650.000 $825.000 $700.000 $958.050 $800.000 $952.000 $1,300.000
PRESTR CONC SLAB BEAM (4SB12)
LF 654.500 $200.000 $210.000 $270.000 $213.490 $350.000 $390.000 $300.000
PRESTR CONC SLAB BEAM (5SB12)
LF 374.000 $200.000 $260.000 $285.000 $228.180 $450.000 $300.000 $280.000
PRESTR CONC SLAB BEAM (5SB15)
LF 692.500 $300.000 $260.000 $290.000 $296.180 $400.000 $331.000 $250.000
PRESTR CONC GIRDER (TX28)
LF 668.600 $220.000 $230.000 $265.000 $240.000 $350.000 $340.000 $240.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 690.000 $200.000 $170.000 $166.000 $181.270 $161.000 $249.500 $210.000
RIPRAP (STONE PROTECTION)(15 IN)
CY 2,397.000 $250.000 $170.000 $160.000 $144.720 $187.000 $180.000 $200.000
RIPRAP (MOW STRIP)(4 IN)
CY 48.000 $545.000 $700.000 $750.000 $956.470 $650.000 $1,170.000 $750.000
RAIL (TY T221)(HPC)
LF 304.000 $100.000 $170.000 $156.000 $143.940 $150.000 $234.500 $170.000
RAIL (TY T223)(HPC)
LF 436.000 $162.000 $190.000 $148.000 $154.050 $175.000 $226.000 $185.000
ARMOR JOINT (SEALED)
LF 49.000 $172.000 $200.000 $175.000 $135.700 $150.000 $283.000 $140.000
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
LF 134.000 $105.000 $160.000 $155.000 $176.310 $115.000 $281.000 $120.000
TYPE A JOINT
LF 100.000 $30.000 $75.000 $17.000 $134.760 $15.000 $268.500 $165.000
REMOV STR (HEADWALL)
EA 2.000 $1,500.000 $10,000.000 $5,000.000 $8,792.170 $7,500.000 $623.500 $17,200.000
REMOV STR (BOX CULVERT)
LF 165.000 $75.000 $96.000 $50.000 $121.900 $100.000 $102.500 $105.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 2.000 $46,000.000 $50,000.000 $70,500.000 $45,000.070 $50,000.000 $112,145.000 $55,640.000
MOBILIZATION
LS 1.000 $451,782.000 $480,000.010 $551,028.680 $556,930.000 $475,000.000 $599,635.050 $575,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $12,000.000 $10,000.000 $11,500.000 $3,257.350 $11,550.000 $2,268.000 $2,700.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 120.000 $30.000 $37.000 $50.000 $30.230 $47.250 $62.500 $35.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 175.000 $55.000 $74.000 $107.000 $60.450 $57.750 $143.500 $72.000
ROCK FILTER DAMS (REMOVE)
LF 295.000 $12.000 $15.000 $20.000 $12.090 $31.500 $26.000 $15.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,467.000 $25.000 $35.000 $30.000 $28.210 $10.000 $10.500 $33.000
CONSTRUCTION EXITS (REMOVE)
SY 1,467.000 $8.000 $11.000 $9.000 $9.070 $5.000 $10.500 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,441.000 $3.000 $4.000 $3.200 $2.770 $2.100 $4.500 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,441.000 $0.800 $1.000 $0.750 $0.760 $0.530 $1.000 $1.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 154.000 $5.000 $4.000 $3.600 $3.270 $4.730 $7.500 $4.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 154.000 $1.500 $1.000 $0.850 $0.860 $2.630 $2.500 $1.000
CONSTRUCTING DETOURS
SY 722.000 $90.000 $213.000 $140.000 $150.000 $150.000 $150.000 $160.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 9.000 $2,400.000 $3,500.000 $6,000.000 $3,375.390 $3,150.000 $16,057.000 $6,000.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 1,140.000 $60.000 $25.000 $55.000 $35.000 $40.000 $150.000 $103.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 750.000 $12.000 $8.000 $4.500 $10.000 $10.000 $7.500 $6.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 1,140.000 $8.000 $12.000 $13.000 $20.000 $5.000 $19.500 $17.000
RIGHT OF WAY MARKERS
EA 8.000 $550.000 $240.000 $425.000 $503.790 $525.000 $550.000 $325.000
MTL W-BEAM GD FEN (TIM POST)
LF 300.000 $25.000 $30.000 $22.000 $18.830 $21.000 $20.000 $23.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $2,100.000 $2,000.000 $2,000.000 $1,717.850 $3,002.780 $1,844.000 $1,500.000
MTL BEAM GD FEN TRANS (TL2)
EA 4.000 $1,400.000 $1,300.000 $1,100.000 $1,152.470 $2,138.620 $1,011.000 $1,000.000
REMOVE METAL BEAM GUARD FENCE
LF 1,070.000 $4.000 $4.000 $2.400 $2.070 $2.100 $2.000 $1.750
REMOVE TERMINAL ANCHOR SECTION
EA 3.000 $180.000 $180.000 $250.000 $206.720 $210.000 $202.500 $180.000
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $3,200.000 $2,800.000 $3,000.000 $2,823.810 $2,861.250 $2,758.000 $2,550.000
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $300.000 $280.000 $250.000 $413.440 $210.000 $202.500 $560.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 4.000 $2,004.000 $1,700.000 $1,250.000 $827.320 $1,500.000 $1,260.000 $1,300.000
CRASH CUSH ATTEN (REMOVE)
EA 6.000 $982.000 $1,200.000 $1,000.000 $704.820 $750.000 $670.000 $850.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 6.000 $10,000.000 $9,000.000 $8,000.000 $8,050.700 $9,500.000 $7,595.000 $8,700.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 7.000 $750.000 $600.000 $660.000 $602.530 $627.900 $700.000 $710.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $635.000 $700.000 $780.000 $698.250 $727.650 $1,000.000 $825.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 14.000 $25.000 $34.000 $17.000 $55.420 $15.750 $25.000 $6.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 12.000 $30.000 $32.000 $22.000 $57.430 $21.000 $30.000 $8.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 5,912.000 $0.800 $1.000 $1.100 $1.160 $1.030 $3.000 $1.000
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 96.000 $7.000 $8.000 $8.500 $9.440 $8.350 $9.000 $9.500
PAVEMENT SEALER 6"
LF 670.000 $0.250 $0.600 $0.600 $0.590 $0.530 $0.500 $0.500
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 2,956.000 $0.750 $1.300 $1.300 $1.470 $1.300 $1.000 $1.500
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 370.000 $1.000 $1.300 $1.300 $1.470 $1.300 $1.000 $1.500
REFL PAV MRKR TY II-A-A
EA 18.000 $7.000 $6.000 $5.500 $5.940 $5.250 $10.000 $6.000
ELIM EXT PAV MRK & MRKS (4")
LF 3,326.000 $0.500 $1.200 $1.200 $1.370 $1.210 $0.500 $1.400
PAV SURF PREP FOR MRK (6")
LF 3,326.000 $0.100 $1.200 $0.600 $0.650 $0.580 $0.100 $0.500
FULL - WIDTH MOWING
CYC 6.000 $3,800.000 $3,500.000 $3,700.000 $2,015.160 $1,000.000 $4,779.500 $1,120.000
LITTER REMOVAL
CYC 6.000 $2,700.000 $2,000.000 $2,200.000 $1,511.370 $1,750.000 $962.500 $750.000
SP MIXES SP-C SAC-B PG64-22
TON 507.000 $150.000 $285.000 $290.000 $293.210 $275.000 $250.000 $325.000
TACK COAT
GAL 195.000 $5.000 $5.000 $40.000 $4.630 $4.000 $4.000 $4.500
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $12,400.000 $25,000.000 $15,000.000 $18,438.570 $10,000.000 $1,290.500 $20,350.000
TMA (STATIONARY)
DAY 712.000 $230.000 $200.000 $250.000 $109.720 $165.000 $2.000 $500.000
TMA (MOBILE OPERATION)
DAY 4.000 $700.000 $1,000.000 $800.000 $644.730 $1,000.000 $932.500 $1,500.000
Totals: $5,137,605.650 $4,898,841.152 $5,510,286.811 $5,569,299.993 $5,630,846.810 $6,118,000.000 $7,399,984.600