COLLIN FM 547 (1014-01-013)

Items: 95

County: COLLIN
Length: 7.8710 MILES
Highway: FM 547
District: DALLAS
Control Number: 1014-01-013
DBE Goal: 0.0%
Project: C 1014-1-13
Guaranty: $100,000.00
Time: 238 WORKING DAYS
Engineer's Estimate: $22,962,770.42
Date: 05/02/2025 (1 year ago)
Contract Number: 5253202
Type: REHABILITATE EXISTING ROADWAY
Project ID: A00045158
Project Description: REHABILITATE EXISTING PAVEMENT AND ADD SHOULDERS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
JENNIFER VORSTER
DEREJE TESEMMA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (8)
E
Engineer's Estimate
$22,962,770.42
$16,422,403.23
Over/Under Est: -28.48% -$6,540,367.19
Over/Under Est: -27.5% -$6,313,693.32
Amt Left: 1.38% $226,673.87
Over/Under Est: -16.47% -$3,782,382.33
Amt Left: 16.79% $2,757,984.86
Delta: -15.20% -$2,531,310.99
Over/Under Est: -15.18% -$3,485,774.70
Amt Left: 18.6% $3,054,592.49
Delta: -1.55% -$296,607.63
Over/Under Est: -11.98% -$2,752,056.43
Amt Left: 23.07% $3,788,310.76
Delta: -3.77% -$733,718.27
Over/Under Est: -6.38% -$1,465,848.17
Amt Left: 30.9% $5,074,519.02
Delta: -6.36% -$1,286,208.26
Over/Under Est: -1.68% -$385,451.01
Amt Left: 37.48% $6,154,916.18
Delta: -5.03% -$1,080,397.16
Over/Under Est: 6.1% $1,400,456.55
Amt Left: 48.35% $7,940,823.74
Delta: -7.91% -$1,785,907.56
Subcontractor Percentage Amount
RK HALL, LLC 22.83% $3,821,508.78
BAHENA CONSTRUCTION CO., INC. 10.56% $1,767,636.12
TEXOP CONSTRUCTION 1.12% $187,476.56
TRAFFIC HIGHWAY MAINTENANCE, LLC 0.74% $123,868.44
STRIPE-A-ZONE, LLC 0.74% $123,868.44
MARCOMS CONSTRUCTION LLC 0.56% $93,738.28
CATOCON, INC. 0.38% $63,608.12
SURFACE PREPARATION TECHNOLOGIES, LLC 0.15% $25,108.47
TEXAS TRAFFIC AND BARRICADE, LLC 0.15% $25,108.47
SITE BARRICADES 0.15% $25,108.47
Total: 37.38% $6,257,030.15

Bid Items & Bid Tabulations

95 Total 0 of 95
COLLIN  |  FM 547  |  DALLAS  |  1014-01-013  |  05/02/2025  |  $22,962,770.42  |  C 1014-1-13  |  REHAB EXIST ROADWAY  |  238 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
A. K. GILLIS & SONS, LLC
D. L. LENNON INCORPORATED - CONTRACTOR
AUSTIN BRIDGE & ROAD SERVICES, LP
FOUTSCO PAVING COMPANY, LLC
HIGHWAY 19 CONSTRUCTION LLC
ED BELL CONSTRUCTION COMPANY
GREY SKY CONSTRUCTION LLC
HARPER BROTHERS CONSTRUCTION LLC
PREPARING ROW
STA 409.070 $2,671.250 $350.000 $350.000 $4,688.770 $500.000 $280.000 $5,250.000 $5,623.000 $2,500.000
REMOV CONC (DRIVEWAYS)
SY 1,794.000 $30.000 $12.000 $18.500 $20.000 $11.000 $25.000 $25.000 $20.000 $20.000
RMV (6") TRT/UNTRT BASE & ASPH PAV
SY 2,412.000 $60.000 $9.240 $15.000 $5.250 $20.000 $6.000 $10.500 $20.000 $12.000
EXCAV (ROADWAY)
CY 24,434.000 $25.000 $22.000 $16.000 $11.070 $9.000 $15.000 $1.000 $20.000 $2.000
EMBANK (FNL)(DC)(TY C)
CY 26,715.000 $30.000 $22.000 $19.000 $21.170 $14.000 $30.000 $27.500 $30.000 $30.000
BACKFILL (TY A OR B)
STA 409.070 $450.000 $275.000 $365.000 $123.300 $200.000 $350.000 $630.000 $250.000 $475.000
BLADING
STA 409.070 $30.000 $250.000 $315.000 $875.670 $150.000 $250.000 $1,050.000 $250.000 $325.000
DRILL SEED (PERM_RURAL_CLAY)
SY 222,501.000 $0.300 $0.180 $0.180 $0.290 $0.180 $0.360 $0.250 $0.300 $0.290
DRILL SEED (TEMP_WARM_COOL)
SY 222,501.000 $0.660 $0.160 $0.160 $0.210 $0.100 $0.350 $0.150 $0.300 $0.210
VEGETATIVE WATERING
TGL 66,199.000 $10.000 $0.010 $0.010 $0.130 $0.010 $1.000 $1.000 $1.000 $10.000
FL BS (CMP IN PLC)(TY D GR 1-2) (10")
SY 140,712.000 $36.520 $25.290 $25.000 $21.060 $33.300 $35.000 $27.500 $25.000 $42.000
FL BS (RDWY DEL) (TY D GR 1-2)
TON 35,182.000 $59.000 $49.770 $50.000 $37.270 $7.000 $60.000 $37.500 $60.000 $47.000
REWORK BS MTL (TY C)(12")(ORD COMP)
SY 107,225.000 $5.400 $2.900 $2.300 $4.410 $7.000 $2.500 $5.250 $8.000 $10.000
CEMENT
TON 738.000 $250.000 $220.000 $240.000 $220.040 $250.000 $215.000 $280.000 $300.000 $350.000
CEMENT TRT (EXIST MATL & NEW BASE)(6")
SY 145,302.000 $2.500 $2.850 $2.160 $2.420 $6.500 $2.500 $2.000 $6.000 $5.000
PRIME COAT(MC-30 OR AE-P)
GAL 28,145.000 $7.300 $6.170 $5.000 $4.660 $1.000 $6.850 $6.350 $6.000 $6.050
ASPH (CRS-2P)
GAL 35,182.000 $4.000 $5.260 $5.000 $4.410 $3.000 $4.310 $6.240 $6.000 $5.950
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
GAL 29,552.000 $8.200 $5.460 $5.000 $5.040 $3.000 $4.940 $6.500 $6.000 $6.200
AGGR (TY-B OR L, GR-3)(SAC-B)
CY 1,352.000 $250.000 $172.840 $144.000 $258.000 $400.000 $248.000 $323.780 $250.000 $308.650
SP MIXES SP-C SAC-B PG64-22
TON 24,844.000 $130.000 $128.400 $143.400 $109.100 $164.000 $148.000 $134.690 $155.000 $128.400
PLANE & TEXT ASPH CONC PAV(0" TO 6")
SY 107,225.000 $5.000 $5.570 $7.621 $5.250 $5.600 $5.000 $6.300 $6.000 $5.270
CUT & RESTORING PAV
SY 265.000 $266.250 $75.000 $20.000 $183.700 $20.000 $250.000 $315.000 $200.000 $250.000
TRENCH EXCAVATION PROTECTION
LF 172.000 $50.000 $15.000 $5.000 $10.830 $5.000 $10.000 $30.000 $10.000 $15.000
TEMPORARY SPL SHORING
SF 2,404.000 $50.000 $5.000 $75.000 $91.000 $60.000 $55.000 $90.000 $55.000 $1.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 599.000 $250.000 $290.620 $250.000 $215.440 $250.000 $180.000 $426.000 $150.000 $210.000
CONC BOX CULV (6 FT X 5 FT)(EXTEND)
LF 58.000 $1,100.000 $1,200.000 $1,100.000 $803.520 $1,100.000 $650.000 $1,144.000 $1,000.000 $1,585.000
CONC BOX CULV (9 FT X 5 FT)(EXTEND)
LF 28.000 $1,162.500 $1,500.000 $1,250.000 $1,004.390 $1,250.000 $900.000 $1,300.000 $2,000.000 $2,370.000
RC PIPE (CL III)(24 IN)
LF 5,990.000 $115.000 $80.000 $68.500 $70.310 $69.000 $83.000 $71.240 $95.000 $175.000
RC PIPE (CL III)(30 IN)
LF 45.000 $220.000 $115.000 $112.000 $90.400 $112.000 $139.000 $116.480 $116.000 $395.000
RC PIPE (CL III)(36 IN)
LF 65.000 $265.000 $160.000 $150.000 $150.660 $150.000 $201.000 $156.000 $130.000 $375.000
RC PIPE (CL III)(48 IN)
LF 67.000 $400.000 $275.000 $250.000 $251.100 $250.000 $300.000 $260.000 $250.000 $515.000
RC PIPE (CL V)(24 IN)
LF 121.000 $200.000 $105.000 $90.000 $90.400 $90.000 $185.000 $93.600 $120.000 $375.000
RC PIPE (CL V)(36 IN)
LF 98.000 $250.000 $200.000 $190.000 $170.750 $190.000 $331.000 $197.600 $150.000 $365.000
HEADWALL (CH - FW - 0) (DIA= 24 IN)
EA 1.000 $17,500.000 $6,000.000 $5,800.000 $7,030.760 $5,800.000 $4,500.000 $6,500.000 $3,000.000 $10,225.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 7.000 $9,000.000 $6,500.000 $6,300.000 $6,603.890 $6,300.000 $450.000 $7,500.000 $3,250.000 $13,815.000
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 1.000 $11,000.000 $8,000.000 $7,850.000 $9,541.740 $7,850.000 $600.000 $9,000.000 $3,850.000 $14,825.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 4.000 $14,000.000 $10,000.000 $9,500.000 $11,801.630 $9,500.000 $7,500.000 $11,500.000 $4,500.000 $16,695.000
HEADWALL (CH - PW - 0) (DIA= 48 IN)
EA 1.000 $16,000.000 $15,000.000 $11,000.000 $13,810.420 $11,000.000 $10,500.000 $14,000.000 $12,500.000 $18,450.000
WINGWALL (PW - 1) (HW=6 FT)
EA 4.000 $15,000.000 $22,000.000 $28,500.000 $17,576.900 $28,500.000 $18,000.000 $30,000.000 $20,000.000 $53,000.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 5.000 $1,700.000 $1,200.000 $1,000.000 $1,155.050 $1,000.000 $1,100.000 $1,500.000 $2,500.000 $2,445.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 8.000 $2,000.000 $1,275.000 $1,100.000 $1,205.270 $1,100.000 $1,300.000 $1,575.000 $2,850.000 $2,385.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 332.000 $1,200.000 $1,300.000 $1,100.000 $1,381.040 $1,100.000 $1,800.000 $1,000.000 $1,500.000 $2,485.000
SET (TY II) (30 IN) (RCP) (3: 1) (C)
EA 1.000 $4,200.000 $1,700.000 $2,000.000 $1,506.590 $2,000.000 $3,100.000 $3,000.000 $3,500.000 $3,820.000
SET (TY II) (48 IN) (RCP) (4: 1) (C)
EA 2.000 $6,500.000 $9,000.000 $8,500.000 $7,784.060 $8,500.000 $10,500.000 $10,000.000 $12,500.000 $10,725.000
CLEAN EXIST CULVERTS
EA 11.000 $4,000.000 $1,200.000 $1,000.000 $2,510.990 $1,000.000 $2,500.000 $4,000.000 $1,500.000 $7,475.000
REMOV STR (SET)
EA 101.000 $250.000 $125.000 $148.000 $175.770 $148.000 $500.000 $350.000 $500.000 $845.000
REMOV STR (WINGWALL)
EA 16.000 $3,150.000 $1,000.000 $900.000 $1,004.390 $900.000 $1,000.000 $6,000.000 $1,500.000 $2,615.000
REMOV STR (HEADWALL)
EA 15.000 $3,300.000 $1,000.000 $900.000 $753.300 $900.000 $500.000 $4,500.000 $1,500.000 $1,695.000
REMOV STR (PIPE)
LF 3,797.000 $21.900 $8.000 $5.000 $15.070 $5.000 $50.000 $17.500 $50.000 $65.000
REMOV STR (BOX CULVERT)
LF 13.000 $225.500 $100.000 $100.000 $200.880 $100.000 $100.000 $750.000 $100.000 $750.000
MOBILIZATION
LS 1.000 $2,114,219.860 $905,756.446 $871,500.000 $2,109,843.120 $1,900,000.000 $2,000,000.000 $1,825,000.000 $2,000,000.000 $1,330,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $20,000.000 $10,800.000 $6,231.000 $77,251.840 $100,000.000 $10,000.000 $63,000.000 $8,500.000 $61,250.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,000.000 $17,500.000 $22,000.000 $21,650.000 $28,000.000 $15,000.000 $20,000.000 $20,000.000 $30,000.000
TMA (STATIONARY)
DAY 238.000 $450.000 $150.000 $265.000 $500.000 $1.000 $300.000 $157.500 $250.000 $250.000
TMA (MOBILE OPERATION)
HR 40.000 $150.000 $150.000 $175.000 $200.000 $65.000 $100.000 $157.500 $55.000 $350.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 750.000 $71.180 $50.000 $50.000 $91.000 $35.000 $85.000 $70.290 $30.000 $91.000
ROCK FILTER DAMS (REMOVE)
LF 905.000 $11.000 $12.000 $12.000 $15.000 $7.000 $10.000 $13.850 $15.000 $15.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 339.000 $28.000 $30.000 $30.000 $40.560 $15.000 $36.000 $38.340 $40.000 $40.560
CONSTRUCTION EXITS (REMOVE)
SY 339.000 $10.000 $10.000 $10.000 $12.000 $5.000 $11.000 $11.720 $20.000 $12.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 8,042.000 $5.000 $4.500 $3.890 $3.530 $3.000 $3.550 $3.780 $4.000 $3.530
TEMP SEDMT CONT FENCE (REMOVE)
LF 8,042.000 $1.250 $1.000 $0.350 $0.880 $0.300 $1.000 $1.330 $2.000 $0.880
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,463.000 $6.000 $5.500 $5.500 $4.370 $4.000 $6.000 $5.590 $18.000 $4.370
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 5,350.000 $9.000 $7.000 $7.000 $5.230 $4.000 $6.000 $6.390 $18.000 $5.230
BIODEG EROSN CONT LOGS (REMOVE)
LF 6,813.000 $2.000 $0.750 $0.300 $0.880 $0.300 $1.000 $1.330 $9.000 $0.880
ROCK FILTER DAMS (INSTALL) (TY 2) 6:1
LF 155.000 $85.000 $60.000 $60.000 $102.000 $50.000 $50.000 $52.190 $50.000 $102.000
DRIVEWAYS (CONC)
SY 1,830.000 $130.000 $159.050 $177.050 $149.820 $98.000 $110.000 $175.000 $100.000 $155.000
DRIVEWAYS (ACP)
SY 7,427.000 $75.000 $82.800 $79.800 $84.540 $80.000 $84.000 $90.000 $50.000 $70.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 78,645.000 $1.000 $0.165 $1.140 $0.060 $0.160 $0.250 $0.130 $0.500 $0.060
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 38,296.000 $0.750 $0.165 $1.160 $0.080 $0.160 $0.250 $0.130 $0.500 $0.080
REMOVE METAL BEAM GUARD FENCE
LF 104.000 $5.410 $10.000 $25.000 $5.000 $5.000 $3.000 $10.650 $3.000 $5.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $315.000 $500.000 $500.000 $375.000 $375.000 $480.000 $372.750 $1,500.000 $375.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 74.000 $315.000 $225.000 $269.000 $225.000 $322.000 $315.000 $282.230 $1,000.000 $320.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 18.000 $275.000 $250.000 $370.000 $250.000 $357.000 $355.000 $292.880 $1,000.000 $355.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 72.000 $710.000 $660.000 $800.000 $660.000 $630.000 $710.000 $692.250 $1,150.000 $635.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 18.000 $900.000 $685.000 $890.000 $685.000 $750.000 $355.000 $740.180 $1,150.000 $355.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 3.000 $960.000 $800.000 $950.000 $800.000 $740.000 $880.000 $782.780 $1,150.000 $735.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 4.000 $944.800 $890.000 $1,050.000 $890.000 $1,190.000 $1,100.000 $953.180 $1,150.000 $1,185.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $1,175.000 $990.000 $1,300.000 $990.000 $1,300.000 $1,500.000 $1,171.500 $1,150.000 $1,299.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 5.000 $1,169.000 $995.000 $1,630.000 $995.000 $1,525.000 $1,500.000 $1,336.580 $1,150.000 $1,525.000
RELOCATE SM RD SN SUP&AM TY S80
EA 1.000 $650.000 $550.000 $1,500.000 $550.000 $755.000 $800.000 $639.000 $1,000.000 $750.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 81,697.000 $0.520 $0.270 $0.270 $0.270 $0.270 $0.270 $0.290 $0.300 $0.240
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 81,697.000 $0.520 $0.270 $0.270 $0.270 $0.270 $0.270 $0.290 $0.300 $0.240
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 41.000 $1.500 $2.450 $3.000 $5.000 $4.000 $5.000 $4.820 $6.000 $3.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,043.000 $1.400 $2.450 $3.000 $2.000 $4.000 $2.000 $4.890 $6.000 $3.000
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 453.000 $1.500 $1.800 $1.800 $1.800 $1.000 $1.800 $1.920 $3.000 $1.250
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 38.000 $2.000 $3.000 $3.000 $3.000 $2.000 $3.000 $3.200 $6.000 $1.550
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 704.000 $2.850 $1.500 $1.500 $1.500 $7.750 $1.500 $1.600 $6.000 $0.980
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 219.000 $9.250 $10.000 $10.000 $10.000 $7.750 $10.000 $10.650 $20.000 $13.250
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 4.000 $200.000 $195.000 $195.000 $195.000 $160.000 $195.000 $207.680 $250.000 $220.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 4.000 $225.000 $250.000 $250.000 $250.000 $170.000 $195.000 $266.250 $250.000 $250.000
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 85,497.000 $1.000 $0.570 $0.570 $0.570 $0.550 $0.570 $0.610 $0.650 $0.650
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 8,840.000 $1.000 $0.600 $0.600 $0.600 $0.590 $0.600 $0.640 $0.650 $0.680
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 23,753.000 $1.000 $0.570 $0.570 $0.570 $0.570 $0.570 $0.610 $0.650 $0.650
REFL PAV MRKR TY I-C
EA 35.000 $6.000 $5.500 $5.500 $5.500 $4.500 $5.500 $5.860 $6.000 $5.250
REFL PAV MRKR TY II-A-A
EA 741.000 $6.000 $5.500 $5.500 $5.500 $4.000 $5.500 $5.860 $6.000 $5.250
Totals: $22,962,770.418 $16,422,403.221 $16,649,077.095 $19,180,388.092 $19,476,995.720 $20,210,713.990 $21,496,922.250 $22,577,319.410 $24,363,226.970
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $422,843.97
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $634,265.96
Total: $1,057,109.93