Show Job Controls
Bid Cobra

COLLIN FM 546 (1013-01-038)

Items: 127

County: COLLIN
Length: N/A
Highway: FM 546
District: DALLAS
Control Number: 1013-01-038
DBE Goal: N/A
Project: STP 2023(356)HES
Guaranty: N/A
Time: 90 WORKING DAYS
Engineer's Estimate: $2,812,182.53
Date: 01/06/2023 (3 years ago)
Contract Number: N/A
Type: INTERSECTION IMPROVEMENT
Mail/Deliver Bids To: N/A
JENNIFER VORSTER
GERALD WALTMAN
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$2,812,182.53
$3,312,753.83
Over/Under Est: 17.8% $500,571.30
Over/Under Est: 22.35% $628,638.81
Amt Left: 3.87% $128,067.51
Over/Under Est: 27.81% $782,115.43
Amt Left: 8.5% $281,544.13
Delta: -4.46% -$153,476.62

Bid Items & Bid Tabulations

127 Total 0 of 127
COLLIN  |  FM 546  |  DALLAS  |  1013-01-038  |  01/06/2023  |  $2,812,182.53  |  STP 2023(356)HES  |  INTERS IMPRV  |  90 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
A. K. GILLIS & SONS, LLC
RAGLE CONSTRUCTION, INC.
ED BELL CONSTRUCTION COMPANY
PREPARING ROW
STA 25.270 $6,000.000 $50.000 $15,000.000 $8,400.000
REMOVING CONC (DRIVEWAYS)
SY 712.000 $16.700 $15.000 $12.000 $25.000
REMOVING STAB BASE & ASPH PAV (4"-12")
SY 659.000 $29.550 $24.500 $12.000 $5.000
REMOVING STAB BASE & ASP PAV (18"-24")
SY 9,554.000 $8.000 $12.870 $12.000 $5.000
OBLITERATING ABANDONED ROAD
SY 669.000 $12.000 $24.200 $53.000 $5.000
EXCAVATION (ROADWAY)
CY 7,129.000 $15.000 $17.200 $21.000 $5.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 3,719.000 $15.420 $18.850 $10.000 $35.000
COMPOST MANUF TOPSOIL (4")
SY 19,799.000 $1.500 $1.290 $0.930 $0.750
BLOCK SODDING
SY 19,799.000 $4.350 $4.850 $5.000 $3.000
DRILL SEED (TEMP)(WARM OR COOL)
SY 13,117.000 $0.200 $0.300 $0.220 $0.120
VEGETATIVE WATERING
MG 3,536.000 $11.000 $10.160 $16.000 $2.100
FL BS (CMP IN PLC)(TY D GR1-2)(12")
SY 11,557.000 $22.000 $24.300 $25.000 $50.000
LIME (HYD, COM, OR QK(SLURRY))
TON 130.000 $256.450 $275.000 $261.000 $315.000
LIME TRT (SUBGRADE)(6")
SY 11,557.000 $3.600 $2.300 $5.000 $10.000
PRIME COAT (MULTI OPTION)
GAL 2,311.000 $5.230 $7.050 $5.500 $6.000
CEM STABIL BKFL
CY 73.000 $107.000 $250.000 $139.000 $300.000
CUT & RESTORE ASPH PAVING
SY 64.000 $91.000 $100.000 $446.000 $300.000
TRENCH EXCAVATION PROTECTION
LF 141.000 $4.320 $15.000 $5.000 $10.000
DRILL SHAFT (TRF SIG POLE) (30 IN)
LF 11.000 $328.640 $269.600 $312.790 $285.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 39.000 $461.640 $343.800 $398.880 $365.000
RIPRAP (STONE COMMON)(GROUT)(12 IN)
CY 36.000 $248.110 $305.000 $279.000 $525.000
RIPRAP (MOW STRIP)(4 IN)
CY 9.000 $540.000 $600.000 $681.000 $945.000
RC PIPE (CL III)(18 IN)
LF 141.000 $70.000 $60.000 $123.000 $120.000
RC PIPE (CL III)(24 IN)
LF 67.000 $90.000 $80.000 $199.000 $150.000
RC PIPE (CL III)(30 IN)
LF 327.000 $101.500 $130.000 $129.000 $175.000
JCTBOX(COMPL)(PJB)(4FTX4FT)
EA 1.000 $5,890.450 $7,000.000 $6,335.000 $12,000.000
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
EA 1.000 $6,975.320 $8,000.000 $7,183.000 $13,500.000
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 1.000 $5,855.410 $9,000.000 $8,320.000 $14,000.000
SET (TY II) (18 IN) (RCP) (3: 1) (P)
EA 8.000 $1,400.000 $700.000 $934.000 $850.000
SET (TY II) (24 IN) (RCP) (3: 1) (P)
EA 4.000 $2,000.000 $1,200.000 $1,307.000 $1,150.000
SET (TY II) (30 IN) (RCP) (3: 1) (P)
EA 1.000 $3,386.580 $3,100.000 $2,916.000 $3,500.000
REMOV STR (INLET)
EA 1.000 $938.560 $1,000.000 $583.000 $2,500.000
REMOV STR (SET)
EA 11.000 $445.890 $250.000 $583.000 $50.000
REMOV STR (HEADWALL)
EA 2.000 $1,450.000 $1,000.000 $2,267.000 $2,500.000
REMOV STR (PIPE)
LF 164.000 $20.000 $15.000 $20.000 $10.000
REMOV STR (DRIVEWAY CULVERT)
EA 7.000 $726.870 $400.000 $1,096.000 $50.000
MOBILIZATION
LS 1.000 $235,196.280 $376,000.000 $340,000.000 $415,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $6,000.000 $16,250.000 $30,000.000 $21,000.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 80.000 $54.110 $55.000 $57.000 $50.000
ROCK FILTER DAMS (REMOVE)
LF 80.000 $12.130 $15.000 $10.000 $25.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,465.000 $24.000 $28.000 $25.000 $15.000
CONSTRUCTION EXITS (REMOVE)
SY 1,465.000 $9.600 $10.000 $8.000 $7.500
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,565.000 $3.000 $3.500 $2.450 $2.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,565.000 $0.630 $1.500 $0.500 $0.500
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 22.000 $4.380 $30.000 $5.000 $12.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 22.000 $0.840 $15.000 $1.000 $2.000
CONSTRUCTING DETOURS
SY 6,399.000 $85.790 $147.000 $85.000 $94.500
DRIVEWAYS (CONC)
SY 757.000 $100.000 $110.000 $88.000 $125.000
DRIVEWAYS (ACP)
SY 1,134.000 $60.000 $55.600 $79.300 $63.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 3,527.000 $0.200 $0.750 $1.000 $1.100
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 2,300.000 $0.220 $0.750 $1.000 $1.100
RIGHT OF WAY MARKERS
EA 15.000 $200.000 $500.000 $500.000 $525.000
MTL W-BEAM GD FEN (TIM POST)
LF 200.000 $25.560 $19.500 $23.260 $25.200
REMOVE METAL BEAM GUARD FENCE
LF 200.000 $2.650 $15.000 $4.000 $3.680
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $3,278.930 $2,800.000 $3,250.000 $3,202.500
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $275.650 $500.000 $400.000 $236.250
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 1.000 $248.930 $290.000 $290.000 $366.450
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 2.000 $750.670 $750.000 $750.000 $876.750
CONDT (PVC) (SCH 40) (2")
LF 19.000 $14.680 $19.100 $22.160 $20.060
CONDT (PVC) (SCH 40) (3")
LF 217.000 $23.440 $18.460 $21.420 $19.380
CONDT (PVC) (SCH 40) (3") (BORE)
LF 158.000 $44.920 $32.460 $37.660 $34.080
CONDT (PVC) (SCH 80) (2")
LF 76.000 $13.870 $21.070 $24.450 $22.120
ELEC CONDR (NO.12) INSULATED
LF 240.000 $1.930 $1.460 $1.690 $1.530
ELEC CONDR (NO.8) INSULATED
LF 692.000 $1.610 $2.060 $2.390 $2.160
ELEC CONDR (NO.6) BARE
LF 380.000 $3.020 $2.130 $2.470 $2.240
ELEC CONDR (NO.6) INSULATED
LF 38.000 $3.030 $2.400 $2.780 $2.520
ELEC CONDR (NO.4) INSULATED
LF 228.000 $3.170 $4.560 $5.290 $4.790
GROUND BOX TY A (122311)W/APRON
EA 1.000 $1,734.810 $1,078.000 $1,250.710 $1,131.900
GROUND BOX TY C (162911)W/APRON
EA 4.000 $1,718.670 $1,288.800 $1,495.280 $1,353.240
ELC SRV TY D 120/240 070(NS)SS(E)PS(U)
EA 1.000 $8,000.000 $8,362.000 $9,701.670 $8,780.100
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 19.000 $720.000 $856.800 $856.800 $898.800
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $1,100.000 $1,159.000 $1,159.000 $1,216.950
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 4.000 $1,400.000 $1,252.000 $1,252.600 $1,315.230
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 8.000 $97.000 $95.000 $95.000 $89.250
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 6,434.000 $0.250 $0.500 $0.610 $0.510
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 6,434.000 $0.250 $0.500 $0.610 $0.510
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 40.000 $9.680 $8.300 $4.170 $10.500
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 564.000 $1.090 $2.250 $2.000 $6.280
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 564.000 $1.090 $2.250 $2.000 $6.280
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 400.000 $1.200 $1.200 $1.980 $1.520
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 106.000 $8.000 $9.000 $8.330 $6.300
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 4.000 $161.000 $177.000 $104.150 $183.750
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 4.000 $180.000 $213.000 $104.150 $204.750
REFL PAV MRK TY II (W) (DBL ARROW)
EA 2.000 $95.000 $201.000 $78.120 $236.250
REFL PAV MRK TY II (W) (TPL ARROW)
EA 1.000 $104.500 $300.000 $83.320 $367.500
PAVEMENT SEALER 4"
LF 9,813.000 $0.150 $0.140 $0.200 $0.260
PAVEMENT SEALER 8"
LF 400.000 $0.290 $0.290 $0.250 $0.580
PAVEMENT SEALER 24"
LF 106.000 $2.050 $0.350 $1.040 $2.100
PAVEMENT SEALER (ARROW)
EA 4.000 $40.000 $1.000 $20.830 $47.250
PAVEMENT SEALER (WORD)
EA 4.000 $45.000 $1.000 $20.830 $47.250
PAVEMENT SEALER (DBL ARROW)
EA 2.000 $39.590 $1.000 $31.250 $68.250
PAVEMENT SEALER (TPL ARROW)
EA 1.000 $35.000 $1.000 $36.450 $84.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 400.000 $0.420 $0.650 $1.040 $1.310
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 4,815.000 $0.320 $0.650 $0.890 $1.040
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 4,598.000 $0.350 $0.650 $0.890 $1.040
REFL PAV MRKR TY I-C
EA 39.000 $3.790 $5.000 $4.170 $5.250
REFL PAV MRKR TY II-A-A
EA 96.000 $4.500 $5.000 $4.170 $5.250
PAV SURF PREP FOR MRK (4")
LF 9,813.000 $0.080 $0.020 $0.200 $0.190
PAV SURF PREP FOR MRK (8")
LF 400.000 $0.200 $0.090 $0.520 $0.450
PAV SURF PREP FOR MRK (24")
LF 106.000 $1.010 $0.100 $0.780 $1.050
PAV SURF PREP FOR MRK (ARROW)
EA 4.000 $18.650 $1.000 $26.040 $26.250
PAV SURF PREP FOR MRK (DBL ARROW)
EA 2.000 $30.000 $1.000 $27.080 $36.750
PAV SURF PREP FOR MRK (TPL ARROW)
EA 1.000 $10.000 $1.000 $29.160 $52.500
PAV SURF PREP FOR MRK (WORD)
EA 4.000 $24.350 $1.000 $26.040 $40.950
INSTALL HWY TRF SIG (ISOLATED)
EA 1.000 $40,000.000 $29,278.000 $33,968.620 $30,741.900
VEH SIG SEC (12")LED(GRN)
EA 8.000 $316.260 $296.700 $344.230 $311.540
VEH SIG SEC (12")LED(YEL)
EA 8.000 $311.610 $296.700 $344.230 $311.540
VEH SIG SEC (12")LED(YEL ARW)
EA 4.000 $313.700 $299.100 $347.020 $314.060
VEH SIG SEC (12")LED(RED)
EA 8.000 $307.630 $296.700 $344.230 $311.540
VEH SIG SEC (12")LED(RED ARW)
EA 4.000 $312.340 $296.700 $344.240 $311.540
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 8.000 $200.680 $176.900 $205.240 $185.750
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
EA 2.000 $270.000 $220.350 $255.650 $231.370
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 225.000 $4.210 $4.590 $5.330 $4.820
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 201.000 $3.530 $5.640 $6.540 $5.920
TRF SIG CBL (TY A)(14 AWG)(12 CONDR)
LF 566.000 $4.910 $4.240 $4.920 $4.450
INS TRF SIG PL AM(S)1 ARM(28')LUM
EA 1.000 $12,500.000 $11,604.000 $13,463.070 $12,184.200
INS TRF SIG PL AM(S)1 ARM(36')
EA 1.000 $12,000.000 $11,240.400 $13,041.220 $11,802.420
INS TRF SIG PL AM(S)1 ARM(36')LUM
EA 2.000 $16,895.750 $12,927.600 $14,998.730 $13,573.980
FULL - WIDTH MOWING
AC 6.000 $100.000 $3,000.000 $101.760 $400.000
SP MIXES SP-C SAC-B PG64-22
TON 2,423.000 $165.000 $122.900 $122.900 $157.500
TACK COAT
GAL 661.000 $3.500 $9.800 $9.800 $10.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $8,250.000 $15,000.000 $10,825.000 $9,000.000
BBU SYSTEM (EXTERNAL BATT CABINET)
EA 1.000 $7,900.000 $8,260.800 $9,584.260 $8,673.840
TMA (STATIONARY)
DAY 192.000 $120.000 $150.000 $243.600 $225.000
TMA (MOBILE OPERATION)
HR 64.000 $60.000 $150.000 $70.000 $73.500
RVDS(PRESENCE DETECTION ONLY)
EA 1.000 $8,144.120 $7,709.900 $8,945.100 $8,095.400
RVDS(PRESENCE AND ADVANCE DET)
EA 3.000 $10,000.000 $7,709.900 $8,945.100 $8,095.400
Totals: $2,812,182.530 $3,312,753.830 $3,440,821.340 $3,594,297.960