PREPARING ROW
|
STA
|
25.270
|
$6,000.000
|
$50.000
|
$15,000.000
|
$8,400.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
712.000
|
$16.700
|
$15.000
|
$12.000
|
$25.000
|
|
|
REMOVING STAB BASE & ASPH PAV (4"-12")
|
SY
|
659.000
|
$29.550
|
$24.500
|
$12.000
|
$5.000
|
|
|
REMOVING STAB BASE & ASP PAV (18"-24")
|
SY
|
9,554.000
|
$8.000
|
$12.870
|
$12.000
|
$5.000
|
|
|
OBLITERATING ABANDONED ROAD
|
SY
|
669.000
|
$12.000
|
$24.200
|
$53.000
|
$5.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
7,129.000
|
$15.000
|
$17.200
|
$21.000
|
$5.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
3,719.000
|
$15.420
|
$18.850
|
$10.000
|
$35.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
19,799.000
|
$1.500
|
$1.290
|
$0.930
|
$0.750
|
|
|
BLOCK SODDING
|
SY
|
19,799.000
|
$4.350
|
$4.850
|
$5.000
|
$3.000
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
13,117.000
|
$0.200
|
$0.300
|
$0.220
|
$0.120
|
|
|
VEGETATIVE WATERING
|
MG
|
3,536.000
|
$11.000
|
$10.160
|
$16.000
|
$2.100
|
|
|
FL BS (CMP IN PLC)(TY D GR1-2)(12")
|
SY
|
11,557.000
|
$22.000
|
$24.300
|
$25.000
|
$50.000
|
|
|
LIME (HYD, COM, OR QK(SLURRY))
|
TON
|
130.000
|
$256.450
|
$275.000
|
$261.000
|
$315.000
|
|
|
LIME TRT (SUBGRADE)(6")
|
SY
|
11,557.000
|
$3.600
|
$2.300
|
$5.000
|
$10.000
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
2,311.000
|
$5.230
|
$7.050
|
$5.500
|
$6.000
|
|
|
CEM STABIL BKFL
|
CY
|
73.000
|
$107.000
|
$250.000
|
$139.000
|
$300.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
64.000
|
$91.000
|
$100.000
|
$446.000
|
$300.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
141.000
|
$4.320
|
$15.000
|
$5.000
|
$10.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (30 IN)
|
LF
|
11.000
|
$328.640
|
$269.600
|
$312.790
|
$285.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
39.000
|
$461.640
|
$343.800
|
$398.880
|
$365.000
|
|
|
RIPRAP (STONE COMMON)(GROUT)(12 IN)
|
CY
|
36.000
|
$248.110
|
$305.000
|
$279.000
|
$525.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
9.000
|
$540.000
|
$600.000
|
$681.000
|
$945.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
141.000
|
$70.000
|
$60.000
|
$123.000
|
$120.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
67.000
|
$90.000
|
$80.000
|
$199.000
|
$150.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
327.000
|
$101.500
|
$130.000
|
$129.000
|
$175.000
|
|
|
JCTBOX(COMPL)(PJB)(4FTX4FT)
|
EA
|
1.000
|
$5,890.450
|
$7,000.000
|
$6,335.000
|
$12,000.000
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
1.000
|
$6,975.320
|
$8,000.000
|
$7,183.000
|
$13,500.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 30 IN)
|
EA
|
1.000
|
$5,855.410
|
$9,000.000
|
$8,320.000
|
$14,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (3: 1) (P)
|
EA
|
8.000
|
$1,400.000
|
$700.000
|
$934.000
|
$850.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (P)
|
EA
|
4.000
|
$2,000.000
|
$1,200.000
|
$1,307.000
|
$1,150.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (P)
|
EA
|
1.000
|
$3,386.580
|
$3,100.000
|
$2,916.000
|
$3,500.000
|
|
|
REMOV STR (INLET)
|
EA
|
1.000
|
$938.560
|
$1,000.000
|
$583.000
|
$2,500.000
|
|
|
REMOV STR (SET)
|
EA
|
11.000
|
$445.890
|
$250.000
|
$583.000
|
$50.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
2.000
|
$1,450.000
|
$1,000.000
|
$2,267.000
|
$2,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
164.000
|
$20.000
|
$15.000
|
$20.000
|
$10.000
|
|
|
REMOV STR (DRIVEWAY CULVERT)
|
EA
|
7.000
|
$726.870
|
$400.000
|
$1,096.000
|
$50.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$235,196.280
|
$376,000.000
|
$340,000.000
|
$415,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$6,000.000
|
$16,250.000
|
$30,000.000
|
$21,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
80.000
|
$54.110
|
$55.000
|
$57.000
|
$50.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
80.000
|
$12.130
|
$15.000
|
$10.000
|
$25.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,465.000
|
$24.000
|
$28.000
|
$25.000
|
$15.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,465.000
|
$9.600
|
$10.000
|
$8.000
|
$7.500
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,565.000
|
$3.000
|
$3.500
|
$2.450
|
$2.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,565.000
|
$0.630
|
$1.500
|
$0.500
|
$0.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
22.000
|
$4.380
|
$30.000
|
$5.000
|
$12.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
22.000
|
$0.840
|
$15.000
|
$1.000
|
$2.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
6,399.000
|
$85.790
|
$147.000
|
$85.000
|
$94.500
|
|
|
DRIVEWAYS (CONC)
|
SY
|
757.000
|
$100.000
|
$110.000
|
$88.000
|
$125.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,134.000
|
$60.000
|
$55.600
|
$79.300
|
$63.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
3,527.000
|
$0.200
|
$0.750
|
$1.000
|
$1.100
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
2,300.000
|
$0.220
|
$0.750
|
$1.000
|
$1.100
|
|
|
RIGHT OF WAY MARKERS
|
EA
|
15.000
|
$200.000
|
$500.000
|
$500.000
|
$525.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
200.000
|
$25.560
|
$19.500
|
$23.260
|
$25.200
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
200.000
|
$2.650
|
$15.000
|
$4.000
|
$3.680
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
1.000
|
$3,278.930
|
$2,800.000
|
$3,250.000
|
$3,202.500
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
1.000
|
$275.650
|
$500.000
|
$400.000
|
$236.250
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
1.000
|
$248.930
|
$290.000
|
$290.000
|
$366.450
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
2.000
|
$750.670
|
$750.000
|
$750.000
|
$876.750
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
19.000
|
$14.680
|
$19.100
|
$22.160
|
$20.060
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
217.000
|
$23.440
|
$18.460
|
$21.420
|
$19.380
|
|
|
CONDT (PVC) (SCH 40) (3") (BORE)
|
LF
|
158.000
|
$44.920
|
$32.460
|
$37.660
|
$34.080
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
76.000
|
$13.870
|
$21.070
|
$24.450
|
$22.120
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
240.000
|
$1.930
|
$1.460
|
$1.690
|
$1.530
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
692.000
|
$1.610
|
$2.060
|
$2.390
|
$2.160
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
380.000
|
$3.020
|
$2.130
|
$2.470
|
$2.240
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
38.000
|
$3.030
|
$2.400
|
$2.780
|
$2.520
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
228.000
|
$3.170
|
$4.560
|
$5.290
|
$4.790
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
1.000
|
$1,734.810
|
$1,078.000
|
$1,250.710
|
$1,131.900
|
|
|
GROUND BOX TY C (162911)W/APRON
|
EA
|
4.000
|
$1,718.670
|
$1,288.800
|
$1,495.280
|
$1,353.240
|
|
|
ELC SRV TY D 120/240 070(NS)SS(E)PS(U)
|
EA
|
1.000
|
$8,000.000
|
$8,362.000
|
$9,701.670
|
$8,780.100
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
19.000
|
$720.000
|
$856.800
|
$856.800
|
$898.800
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$1,100.000
|
$1,159.000
|
$1,159.000
|
$1,216.950
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
4.000
|
$1,400.000
|
$1,252.000
|
$1,252.600
|
$1,315.230
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
|
EA
|
8.000
|
$97.000
|
$95.000
|
$95.000
|
$89.250
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
6,434.000
|
$0.250
|
$0.500
|
$0.610
|
$0.510
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
6,434.000
|
$0.250
|
$0.500
|
$0.610
|
$0.510
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
40.000
|
$9.680
|
$8.300
|
$4.170
|
$10.500
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
564.000
|
$1.090
|
$2.250
|
$2.000
|
$6.280
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
564.000
|
$1.090
|
$2.250
|
$2.000
|
$6.280
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
400.000
|
$1.200
|
$1.200
|
$1.980
|
$1.520
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
106.000
|
$8.000
|
$9.000
|
$8.330
|
$6.300
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
4.000
|
$161.000
|
$177.000
|
$104.150
|
$183.750
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
4.000
|
$180.000
|
$213.000
|
$104.150
|
$204.750
|
|
REFL PAV MRK TY II (W) (DBL ARROW)
|
EA
|
2.000
|
$95.000
|
$201.000
|
$78.120
|
$236.250
|
|
REFL PAV MRK TY II (W) (TPL ARROW)
|
EA
|
1.000
|
$104.500
|
$300.000
|
$83.320
|
$367.500
|
|
|
PAVEMENT SEALER 4"
|
LF
|
9,813.000
|
$0.150
|
$0.140
|
$0.200
|
$0.260
|
|
|
PAVEMENT SEALER 8"
|
LF
|
400.000
|
$0.290
|
$0.290
|
$0.250
|
$0.580
|
|
|
PAVEMENT SEALER 24"
|
LF
|
106.000
|
$2.050
|
$0.350
|
$1.040
|
$2.100
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
4.000
|
$40.000
|
$1.000
|
$20.830
|
$47.250
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
4.000
|
$45.000
|
$1.000
|
$20.830
|
$47.250
|
|
|
PAVEMENT SEALER (DBL ARROW)
|
EA
|
2.000
|
$39.590
|
$1.000
|
$31.250
|
$68.250
|
|
|
PAVEMENT SEALER (TPL ARROW)
|
EA
|
1.000
|
$35.000
|
$1.000
|
$36.450
|
$84.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
400.000
|
$0.420
|
$0.650
|
$1.040
|
$1.310
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
4,815.000
|
$0.320
|
$0.650
|
$0.890
|
$1.040
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
4,598.000
|
$0.350
|
$0.650
|
$0.890
|
$1.040
|
|
REFL PAV MRKR TY I-C
|
EA
|
39.000
|
$3.790
|
$5.000
|
$4.170
|
$5.250
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
96.000
|
$4.500
|
$5.000
|
$4.170
|
$5.250
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
9,813.000
|
$0.080
|
$0.020
|
$0.200
|
$0.190
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
400.000
|
$0.200
|
$0.090
|
$0.520
|
$0.450
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
106.000
|
$1.010
|
$0.100
|
$0.780
|
$1.050
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
4.000
|
$18.650
|
$1.000
|
$26.040
|
$26.250
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
2.000
|
$30.000
|
$1.000
|
$27.080
|
$36.750
|
|
|
PAV SURF PREP FOR MRK (TPL ARROW)
|
EA
|
1.000
|
$10.000
|
$1.000
|
$29.160
|
$52.500
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
4.000
|
$24.350
|
$1.000
|
$26.040
|
$40.950
|
|
|
INSTALL HWY TRF SIG (ISOLATED)
|
EA
|
1.000
|
$40,000.000
|
$29,278.000
|
$33,968.620
|
$30,741.900
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
8.000
|
$316.260
|
$296.700
|
$344.230
|
$311.540
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
8.000
|
$311.610
|
$296.700
|
$344.230
|
$311.540
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
4.000
|
$313.700
|
$299.100
|
$347.020
|
$314.060
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
8.000
|
$307.630
|
$296.700
|
$344.230
|
$311.540
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
4.000
|
$312.340
|
$296.700
|
$344.240
|
$311.540
|
|
|
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
|
EA
|
8.000
|
$200.680
|
$176.900
|
$205.240
|
$185.750
|
|
|
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
|
EA
|
2.000
|
$270.000
|
$220.350
|
$255.650
|
$231.370
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
225.000
|
$4.210
|
$4.590
|
$5.330
|
$4.820
|
|
|
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
|
LF
|
201.000
|
$3.530
|
$5.640
|
$6.540
|
$5.920
|
|
|
TRF SIG CBL (TY A)(14 AWG)(12 CONDR)
|
LF
|
566.000
|
$4.910
|
$4.240
|
$4.920
|
$4.450
|
|
|
INS TRF SIG PL AM(S)1 ARM(28')LUM
|
EA
|
1.000
|
$12,500.000
|
$11,604.000
|
$13,463.070
|
$12,184.200
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')
|
EA
|
1.000
|
$12,000.000
|
$11,240.400
|
$13,041.220
|
$11,802.420
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')LUM
|
EA
|
2.000
|
$16,895.750
|
$12,927.600
|
$14,998.730
|
$13,573.980
|
|
|
FULL - WIDTH MOWING
|
AC
|
6.000
|
$100.000
|
$3,000.000
|
$101.760
|
$400.000
|
|
|
SP MIXES SP-C SAC-B PG64-22
|
TON
|
2,423.000
|
$165.000
|
$122.900
|
$122.900
|
$157.500
|
|
|
TACK COAT
|
GAL
|
661.000
|
$3.500
|
$9.800
|
$9.800
|
$10.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
3.000
|
$8,250.000
|
$15,000.000
|
$10,825.000
|
$9,000.000
|
|
|
BBU SYSTEM (EXTERNAL BATT CABINET)
|
EA
|
1.000
|
$7,900.000
|
$8,260.800
|
$9,584.260
|
$8,673.840
|
|
|
TMA (STATIONARY)
|
DAY
|
192.000
|
$120.000
|
$150.000
|
$243.600
|
$225.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
64.000
|
$60.000
|
$150.000
|
$70.000
|
$73.500
|
|
|
RVDS(PRESENCE DETECTION ONLY)
|
EA
|
1.000
|
$8,144.120
|
$7,709.900
|
$8,945.100
|
$8,095.400
|
|
|
RVDS(PRESENCE AND ADVANCE DET)
|
EA
|
3.000
|
$10,000.000
|
$7,709.900
|
$8,945.100
|
$8,095.400
|
|
Totals: |
$2,812,182.530
|
$3,312,753.830
|
$3,440,821.340
|
$3,594,297.960
|