COLLIN FM 455 (0816-04-104)

Items: 102

County: COLLIN
Length: N/A
Highway: FM 455
District: DALLAS
Control Number: 0816-04-104
DBE Goal: 750.0%
Project: BR 2B24(272)
Guaranty: N/A
Time: 305 WORKING DAYS
Engineer's Estimate: $11,431,172.45
Date: 07/10/2024 (1 year ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
JENNIFER VORSTER
DEREJE TESEMMA
GERALD WALTMAN
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$11,431,172.45
$9,581,000.00
Over/Under Est: -16.19% -$1,850,172.45
Over/Under Est: -13.49% -$1,542,166.65
Amt Left: 3.21% $308,005.80
$10,976,559.89
Over/Under Est: -3.98% -$454,612.56
Amt Left: 14.57% $1,395,559.89
Delta: -11.00% -$1,087,554.09
Over/Under Est: -3.82% -$436,271.92
Amt Left: 14.76% $1,413,900.53
Delta: -0.17% -$18,340.64
Over/Under Est: 0.21% $23,892.42
Amt Left: 19.56% $1,874,064.87
Delta: -4.19% -$460,164.34
Over/Under Est: 4.29% $490,180.17
Amt Left: 24.43% $2,340,352.62
Delta: -4.07% -$466,287.75
Subcontractor Percentage Amount
REYNOLDS ASPHALT & CONSTRUCTION COMPANY 12.17% $1,166,007.70
WYLIE DRILLING & DRAINAGE, INC. 5.55% $531,745.50
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 3.88% $371,742.80
SOUTHERN CROSS CONTRACTORS, LLC 3.22% $308,508.20
A.E.A. TRANSPORTATION 2.10% $201,201.00
TRAFFIC HIGHWAY MAINTENANCE, LLC 1.80% $172,458.00
A. E. MOORE CONSTRUCTION, INC. 1.35% $129,343.50
DUSTROL, INC. 0.96% $91,977.60
TORO BRAVO CONSTRUCTION, LLC 0.85% $81,438.50
FC TRAFFIC CONTROL, INC. 0.32% $30,659.20
1 PRIORITY ENVIRONMENTAL SERVICES, LLC 0.18% $17,245.80
DFW REBAR, INC. 0.00% $0.00
Total: 32.38% $3,102,327.80

Bid Items & Bid Tabulations

102 Total 0 of 102
COLLIN  |  FM 455  |  DALLAS  |  0816-04-104  |  07/10/2024  |  $11,431,172.45  |  BR 2B24(272)  |  BRIDGE REPL  |  305 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HARPER BROTHERS CONSTRUCTION LLC
INDUS ROAD & BRIDGE, INC.
RPM XCONSTRUCTION, LLC
MP HEAVY CONSTRUCTION INC
STERLING DELAWARE HOLDING COMPANY
ED BELL CONSTRUCTION COMPANY
PREPARING ROW
STA 47.430 $13,000.000 $9,000.000 $7,499.980 $14,680.000 $6,800.000 $12,061.000 $9,450.000
REMOVING CONC (PAV)
SY 2,837.000 $30.000 $10.000 $18.000 $10.000 $11.190 $5.000 $15.000
REMOVING CONC (RIPRAP)
SY 595.000 $50.000 $25.000 $13.000 $19.000 $27.990 $9.000 $15.000
REMOVING CONCRETE(MOW STRIP)
LF 703.000 $50.000 $25.000 $10.000 $3.600 $18.660 $6.000 $10.000
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 5,066.000 $15.000 $10.000 $3.900 $6.500 $5.600 $5.000 $7.000
REMOVING STAB BASE & ASPH PAV(13"-18")
SY 10,944.000 $15.000 $21.000 $11.000 $15.500 $8.400 $14.000 $16.000
EXCAVATION (ROADWAY)
CY 14,324.000 $30.000 $20.000 $15.000 $20.000 $16.790 $30.000 $22.000
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
CY 31,077.000 $25.000 $7.000 $21.000 $22.000 $27.050 $50.000 $33.000
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
CY 1,889.000 $45.000 $28.000 $35.000 $45.000 $42.910 $40.000 $44.000
COMPOST MANUF TOPSOIL (4")
SY 49,011.000 $3.000 $2.000 $1.500 $2.380 $6.810 $2.000 $1.160
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 49,011.000 $0.250 $1.000 $0.350 $0.190 $0.290 $0.350 $0.180
DRILL SEED (TEMP)(WARM OR COOL)
SY 61,264.000 $1.000 $1.000 $0.350 $0.160 $0.250 $0.340 $0.160
VEGETATIVE WATERING
MG 18,227.000 $12.000 $12.000 $18.000 $1.000 $19.320 $6.000 $1.000
FL BS (CMP IN PLC)(TY D GR1-2)(8")
SY 20,916.000 $23.000 $18.000 $17.000 $20.000 $17.730 $30.000 $27.500
LIME TRT (EXST MATL) (12")
SY 20,916.000 $9.000 $8.000 $6.000 $12.000 $7.650 $14.000 $7.500
LIME (HYD, COM, OR QK(SLURRY))
TON 589.000 $310.000 $371.000 $325.000 $340.000 $389.990 $403.000 $400.000
PRIME COAT(MC-30 OR AE-P)
GAL 4,184.000 $10.000 $8.000 $8.000 $8.700 $12.130 $7.950 $8.350
CEM STABIL BKFL
CY 348.000 $200.000 $194.000 $250.000 $245.000 $212.720 $250.000 $525.000
TRENCH EXCAVATION PROTECTION
LF 67.000 $30.000 $5.000 $44.000 $10.000 $18.660 $1.000 $42.000
TEMPORARY SPL SHORING
SF 2,689.000 $45.000 $90.000 $44.000 $47.000 $33.590 $12.000 $73.500
DRILL SHAFT (18 IN)
LF 120.000 $150.000 $250.000 $160.000 $276.000 $173.810 $137.000 $175.000
DRILL SHAFT (36 IN)
LF 1,768.000 $300.000 $400.000 $250.000 $300.000 $280.000 $215.000 $350.000
CL C CONC (ABUT)(HPC)
CY 174.900 $1,400.000 $1,600.000 $800.000 $1,746.000 $1,306.170 $1,500.000 $1,500.000
CL C CONC (CAP)(HPC)
CY 129.000 $1,650.000 $1,800.000 $1,200.000 $1,599.000 $1,726.020 $1,700.000 $1,500.000
CL C CONC (COLUMN)(HPC)
CY 53.400 $1,800.000 $2,000.000 $1,350.000 $2,070.000 $1,539.420 $2,000.000 $2,500.000
REINF CONC SLAB (HPC)
SF 23,230.000 $25.000 $35.000 $23.000 $31.600 $27.990 $30.000 $28.000
APPROACH SLAB (HPC)
CY 360.000 $750.000 $682.000 $700.000 $738.000 $671.750 $700.000 $400.000
PRESTR CONC GIRDER (TX28)
LF 1,571.870 $250.000 $240.000 $220.000 $274.000 $239.590 $250.000 $250.000
PRESTR CONC GIRDER (TX40)
LF 1,430.280 $300.000 $256.000 $220.000 $293.000 $241.830 $230.000 $250.000
RIPRAP (CONC)(4 IN)
CY 22.000 $550.000 $964.000 $555.000 $593.000 $559.790 $800.000 $1,000.000
RIPRAP (STONE COMMON)(DRY)(6 IN)
CY 252.000 $225.000 $201.000 $190.000 $343.000 $167.940 $140.000 $215.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 932.000 $200.000 $156.000 $180.000 $289.000 $177.270 $240.000 $195.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 720.000 $225.000 $122.000 $180.000 $274.000 $186.600 $180.000 $185.000
RIPRAP (MOW STRIP)(4 IN)
CY 130.000 $700.000 $738.000 $650.000 $945.000 $387.190 $837.000 $1,000.000
RAIL (TY T223)(HPC)
LF 1,164.100 $175.000 $119.000 $150.000 $231.000 $163.270 $180.000 $189.000
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
LF 288.000 $160.000 $136.000 $140.000 $146.000 $167.000 $170.000 $125.000
CONC BOX CULV (9 FT X 5 FT)
LF 104.000 $1,700.000 $835.000 $880.000 $1,000.000 $1,586.070 $900.000 $945.000
RC PIPE (CL III)(24 IN)
LF 192.000 $165.000 $125.000 $95.000 $122.000 $117.560 $120.000 $105.000
WINGWALL (PW - 1) (HW=8 FT)
EA 2.000 $24,000.000 $53,381.000 $45,000.000 $76,000.000 $44,783.140 $60,000.000 $63,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 6.000 $2,000.000 $1,831.000 $3,000.000 $3,000.000 $2,071.220 $2,500.000 $1,365.000
REMOV STR (SET)
EA 8.000 $550.000 $408.000 $900.000 $600.000 $1,026.280 $450.000 $525.000
REMOV STR (PIPE)
LF 240.000 $35.000 $13.000 $25.000 $33.000 $27.990 $30.000 $31.500
REMOV STR (BOX CULVERT)
LF 66.000 $230.000 $371.000 $120.000 $160.000 $90.500 $200.000 $210.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 3.000 $80,000.000 $35,000.000 $37,000.000 $55,000.000 $37,320.000 $50,000.000 $84,000.000
MOBILIZATION
LS 1.000 $1,011,587.000 $396,264.420 $980,000.000 $500,000.000 $1,150,000.000 $1,135,000.000 $1,175,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 19.000 $15,000.000 $8,921.000 $19,000.000 $4,666.000 $9,062.340 $8,000.000 $26,250.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 1,199.000 $40.000 $50.000 $35.000 $35.730 $55.980 $32.000 $31.500
ROCK FILTER DAMS (REMOVE)
LF 1,199.000 $15.000 $10.000 $13.500 $13.400 $11.200 $12.000 $15.750
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 840.000 $30.000 $15.000 $35.000 $36.850 $16.790 $33.000 $52.500
CONSTRUCTION EXITS (REMOVE)
SY 840.000 $15.000 $5.000 $12.500 $12.280 $7.460 $11.000 $31.500
TEMP SEDMT CONT FENCE (INSTALL)
LF 8,141.000 $4.000 $4.000 $3.400 $3.350 $4.660 $4.310 $2.900
TEMP SEDMT CONT FENCE (REMOVE)
LF 8,141.000 $1.000 $1.000 $1.000 $1.120 $1.210 $1.000 $1.050
CONSTRUCTING DETOURS
SY 3,539.500 $120.000 $95.000 $135.000 $145.000 $121.290 $84.000 $110.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 22.000 $5,000.000 $3,077.000 $2,850.000 $3,000.000 $3,664.070 $3,500.000 $6,300.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 2,790.000 $50.000 $18.000 $45.000 $65.000 $41.230 $18.000 $31.500
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 360.000 $40.000 $54.000 $55.000 $87.000 $93.300 $18.000 $52.500
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 100.000 $40.000 $61.000 $60.000 $91.000 $93.300 $18.000 $84.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 3,890.000 $8.000 $2.000 $8.000 $7.000 $17.000 $10.000 $15.750
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 420.000 $10.000 $15.000 $9.000 $10.000 $15.860 $8.000 $31.500
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 80.000 $10.000 $81.000 $9.000 $11.000 $15.860 $8.000 $42.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 2,790.000 $12.000 $1.520 $14.000 $8.000 $16.800 $11.000 $15.750
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 360.000 $10.000 $11.000 $12.000 $10.000 $15.860 $11.000 $31.500
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 100.000 $10.000 $9.000 $14.000 $12.000 $15.860 $11.000 $42.000
INTRSCT, DRVWAYS, & TURNOUT (ACP)
SY 1,615.000 $70.000 $104.000 $125.000 $85.160 $139.950 $69.000 $89.250
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 7,402.000 $1.000 $0.500 $0.900 $1.380 $1.210 $0.200 $2.710
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 3,701.000 $1.000 $0.500 $0.900 $3.500 $1.460 $0.300 $1.070
RIGHT OF WAY MARKERS
EA 23.000 $138.000 $399.000 $420.000 $525.000 $462.760 $399.000 $418.950
MTL W-BEAM GD FEN (STEEL POST)
LF 1,875.000 $40.000 $25.000 $26.000 $29.930 $22.390 $28.500 $29.930
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 14.000 $2,250.000 $2,235.000 $2,300.000 $2,310.000 $3,172.140 $2,675.030 $3,204.050
REMOVE METAL BEAM GUARD FENCE
LF 1,250.000 $20.000 $2.000 $2.500 $2.630 $4.660 $2.500 $2.630
RM MTL BM GD FEN TRANS (T101)
EA 16.000 $320.000 $185.000 $190.000 $157.500 $1,492.770 $250.000 $157.500
GUARDRAIL END TREATMENT (INSTALL)
EA 17.000 $3,250.000 $3,000.000 $3,100.000 $3,018.750 $3,577.990 $2,950.000 $3,018.750
GUARDRAIL END TREATMENT (REMOVE)
EA 20.000 $425.000 $225.000 $230.000 $262.500 $279.890 $250.000 $262.500
CRASH CUSH ATTEN (MOVE & RESET)
EA 16.000 $2,000.000 $1,340.000 $1,100.000 $1,407.000 $1,212.880 $1,154.550 $2,625.000
CRASH CUSH ATTEN (REMOVE)
EA 8.000 $1,200.000 $955.000 $800.000 $1,003.000 $886.330 $800.000 $1,050.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 8.000 $10,000.000 $6,265.000 $7,800.000 $8,279.000 $11,662.280 $9,100.000 $11,550.000
WIRE FENCE (TY D)
LF 125.000 $50.000 $150.000 $52.000 $21.000 $186.600 $45.000 $157.500
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 1.000 $400.000 $315.000 $390.000 $315.000 $466.490 $315.000 $330.750
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 16.000 $900.000 $629.000 $700.000 $781.200 $709.070 $629.000 $660.450
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $950.000 $699.000 $750.000 $875.700 $783.700 $699.000 $733.950
IN SM RD SN SUP&AM TY10BWG(1)SB(P-BM)
EA 2.000 $1,000.000 $895.000 $1,000.000 $1,209.600 $1,007.620 $895.000 $939.750
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 3.000 $1,250.000 $1,098.000 $1,100.000 $1,310.400 $1,231.540 $1,098.000 $1,152.900
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 3.000 $1,400.000 $1,269.000 $1,300.000 $1,549.800 $1,427.460 $1,269.000 $1,332.450
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 28.000 $45.000 $20.000 $22.000 $18.900 $24.260 $21.000 $21.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 42.000 $30.000 $25.000 $27.000 $18.900 $27.990 $22.000 $21.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 41,975.000 $1.000 $1.450 $1.100 $1.170 $1.030 $1.050 $1.520
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 416.000 $10.000 $13.000 $6.500 $7.000 $5.600 $6.000 $13.650
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 27,198.000 $1.000 $1.450 $1.100 $1.170 $1.030 $1.050 $1.520
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 92.000 $10.000 $18.000 $7.000 $7.950 $6.530 $7.500 $18.640
REFL PAV MRK TY II (W) 6" (BRK)
LF 255.000 $0.500 $5.000 $2.800 $2.990 $2.330 $1.000 $5.250
PAVEMENT SEALER 6"
LF 1,860.000 $0.400 $1.000 $1.600 $1.820 $1.400 $0.270 $1.050
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 11,621.000 $1.200 $1.230 $1.300 $1.400 $1.070 $0.750 $1.290
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 12,164.000 $1.000 $1.230 $1.300 $1.400 $1.070 $0.750 $1.290
REFL PAV MRKR TY II-A-A
EA 147.000 $7.000 $28.000 $5.500 $5.840 $4.660 $5.000 $28.880
ELIM EXT PAV MRK & MRKS (4")
LF 10,498.000 $1.000 $2.000 $0.400 $0.440 $0.470 $0.550 $6.300
ELIM EXT PAV MRK & MRKS (24")
LF 20.000 $5.000 $28.000 $2.800 $2.920 $2.330 $5.000 $105.000
FULL - WIDTH MOWING
CYC 12.000 $110.000 $3,000.000 $3,500.000 $4,300.000 $3,358.740 $2,801.650 $4,200.000
SP MIXES SP-C SAC-B PG64-22
TON 4,548.000 $150.000 $160.000 $177.000 $204.750 $187.360 $156.650 $165.000
TACK COAT
GAL 1,232.000 $4.000 $14.000 $15.000 $8.400 $2.430 $14.000 $14.000
ASBESTOS ABATEMENT (OTHER)
SF 218.000 $150.000 $80.000 $82.000 $86.500 $116.620 $31.650 $126.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 100.000 $100.000 $100.000 $216.000 $100.000 $79.300 $42.000 $126.000
TMA (MOBILE OPERATION)
HR 20.000 $100.000 $116.000 $220.000 $150.000 $93.300 $150.000 $126.000
Totals: $11,431,172.450 $9,581,000.000 $9,889,005.801 $10,976,559.890 $10,994,900.529 $11,455,064.870 $11,921,352.620