Show Job Controls
Bid Cobra

COLLIN FM 982 (0387-05-026)

Items: 61

County: COLLIN
Length: 5.6790 MILES
Highway: FM 982
District: DALLAS
Control Number: 0387-05-026
DBE Goal: 0.0%
Project: F 2024(993)
Guaranty: $100,000.00
Time: 206 WORKING DAYS
Engineer's Estimate: $6,901,667.65
Date: 11/06/2024 (1 year ago)
Contract Number: 11243015
Type: RESURFACE ROADWAY
Project ID: A00195784
Project Description: MILL AND INLAY WITH INTERSECTION IMPROVEMENTS
Mail/Deliver Bids To: N/A
JENNIFER VORSTER
DEREJE TESEMMA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$6,901,667.65
$5,486,284.92
Over/Under Est: -20.51% -$1,415,382.73
Over/Under Est: -18.36% -$1,267,028.24
Amt Left: 2.7% $148,354.49
Over/Under Est: -10.66% -$735,576.69
Amt Left: 12.39% $679,806.04
Delta: -9.43% -$531,451.55
Over/Under Est: -9.23% -$636,688.84
Amt Left: 14.19% $778,693.89
Delta: -1.60% -$98,887.85
Subcontractor Percentage Amount
STOIC CIVIL CONSTRUCTION, INC. 2.96% $167,652.31
USA SWPPP INSPECTIONS, INC.DBA USA EROSION 2.67% $151,226.91
J & M CONTRACTING, COMPANY 2.25% $127,438.41
TEXAS TRAFFIC AND BARRICADE, LLC 0.44% $24,921.29
SURFACE PREPARATION TECHNOLOGIES, LLC 0.26% $14,726.22
SYNERGY SIGNS & SERVICES LLC 0.13% $7,363.11
Total: 8.71% $493,328.25

Bid Items & Bid Tabulations

61 Total 0 of 61
COLLIN  |  FM 982  |  DALLAS  |  0387-05-026  |  11/06/2024  |  $6,901,667.65  |  F 2024(993)  |  RESURF ROADWAY  |  206 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
AUSTIN BRIDGE & ROAD SERVICES, LP
FOUTSCO PAVING COMPANY, LLC
PEACHTREE CONSTRUCTION, LTD.
TEXAS MATERIALS GROUP, INC.
PREPARING ROW
STA 25.880 $600.000 $21,198.930 $500.000 $950.000 $1,000.000
REMOV CONC (DRIVEWAYS)
SY 238.000 $20.000 $46.950 $50.000 $24.000 $25.000
RMV (10"-14") TRT/UNTRT BASE & ASPH PAV
SY 352.000 $30.000 $60.800 $100.000 $34.500 $40.000
EXCAV (ROADWAY)
CY 124.000 $40.000 $84.840 $100.000 $45.500 $280.000
EMBANK (FNL)(OC)(TY C)
CY 491.000 $20.000 $75.360 $150.000 $52.500 $140.000
BACKFILL (TY A OR B)
STA 25.880 $215.000 $451.810 $200.000 $575.000 $900.000
BLADING
STA 25.880 $205.000 $695.000 $200.000 $200.000 $600.000
DRILL SEED (PERM_RURAL_CLAY)
SY 6,808.000 $0.200 $0.400 $0.400 $0.710 $0.750
DRILL SEED (TEMP_WARM_COOL)
SY 6,808.000 $0.200 $0.410 $0.200 $0.710 $0.700
VEGETATIVE WATERING
TGL 2,026.000 $20.000 $0.140 $1.000 $10.000 $2.000
SP MIXES SP-B PG64-22
TON 3,298.000 $150.000 $118.200 $166.000 $182.500 $141.000
SP MIXES SP-C SAC-B PG64-22
TON 19,359.000 $140.000 $119.140 $132.000 $161.500 $143.000
TACK COAT
GAL 17,607.000 $10.000 $0.100 $0.100 $1.000 $4.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 450.000 $143.000 $223.640 $250.000 $285.000 $225.000
PLANE ASPH CONC PAV(0" TO 2")
SY 159,610.000 $8.000 $2.540 $1.000 $3.350 $4.050
CUT & RESTORING PAV
SY 50.000 $150.000 $200.000 $133.030 $95.000 $150.000
FLOWABLE BACKFILL
CY 24.000 $200.000 $250.000 $250.000 $285.000 $250.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 530.000 $250.000 $237.000 $250.000 $278.000 $250.000
RC PIPE (CL III)(18 IN)
LF 74.000 $100.000 $70.000 $100.000 $122.000 $106.000
RC PIPE (CL III)(24 IN)
LF 174.000 $120.000 $150.000 $130.000 $155.000 $134.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 4.000 $1,000.000 $1,200.000 $1,500.000 $1,750.000 $1,500.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 6.000 $1,200.000 $2,500.000 $2,200.000 $2,550.000 $2,200.000
REMOV STR (SET)
EA 2.000 $1,200.000 $1,000.000 $300.000 $325.000 $300.000
REMOV STR (PIPE)
LF 61.000 $30.000 $50.000 $20.000 $22.000 $20.000
REMOVING ROCK RIPRAP
LF 160.000 $20.000 $225.000 $300.000 $102.000 $80.000
MOBILIZATION
LS 1.000 $705,219.000 $603,491.360 $540,000.000 $550,000.000 $620,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $20,000.000 $18,732.600 $60,000.000 $17,500.000 $40,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $25,000.000 $19,485.000 $15,000.000 $7,500.000 $14,000.000
TMA (STATIONARY)
DAY 206.000 $180.000 $2.000 $1.000 $110.000 $300.000
TMA (MOBILE OPERATION)
HR 206.000 $100.000 $3.000 $1.000 $50.000 $100.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 360.000 $5.900 $64.000 $46.000 $97.000 $113.586
ROCK FILTER DAMS (REMOVE)
LF 360.000 $5.000 $16.000 $16.000 $35.000 $11.473
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 164.000 $23.000 $34.000 $34.000 $58.000 $45.893
CONSTRUCTION EXITS (REMOVE)
SY 164.000 $8.000 $12.000 $12.000 $30.000 $20.652
TEMP SEDMT CONT FENCE (INSTALL)
LF 13,087.000 $4.000 $3.250 $1.000 $4.200 $4.589
TEMP SEDMT CONT FENCE (REMOVE)
LF 13,087.000 $1.000 $1.000 $0.500 $1.800 $1.147
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 147.000 $4.000 $6.000 $6.000 $13.000 $6.884
BIODEG EROSN CONT LOGS (REMOVE)
LF 147.000 $0.750 $1.250 $1.000 $4.500 $2.295
DRIVEWAYS (CONC)
SY 205.000 $120.000 $243.300 $250.000 $150.400 $125.000
DRIVEWAYS (ACP)
SY 743.000 $70.000 $92.310 $125.000 $105.500 $125.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 65,264.000 $0.750 $0.120 $0.320 $0.260 $0.240
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 29,399.000 $0.750 $0.120 $0.230 $0.260 $0.240
MAILBOX INSTALL-S (RR-POST) TY 4
EA 6.000 $235.000 $285.000 $285.000 $510.000 $285.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 1.000 $600.000 $850.000 $850.000 $1,200.000 $850.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 3.000 $1,200.000 $1,155.000 $1,155.000 $1,700.000 $1,155.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 1.000 $1,000.000 $1,365.000 $1,365.000 $1,800.000 $1,365.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 87,036.000 $0.350 $0.320 $0.410 $0.440 $0.410
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 4,353.000 $2.000 $1.150 $1.000 $3.000 $1.000
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 21.000 $3.000 $1.000 $1.800 $2.000 $1.800
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 141.000 $2.500 $1.200 $2.000 $2.100 $2.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,072.000 $2.500 $0.890 $1.000 $1.050 $1.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 395.000 $6.750 $6.800 $7.650 $8.200 $7.650
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 17.000 $130.000 $155.000 $151.000 $167.000 $151.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 17.000 $150.000 $175.000 $181.000 $201.000 $181.000
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 1,255.000 $7.000 $7.000 $8.550 $9.200 $8.550
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 80,612.000 $2.000 $0.570 $0.660 $0.720 $0.660
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 87,036.000 $1.000 $0.570 $0.660 $0.720 $0.660
REFL PAV MRKR TY I-C
EA 7,612.000 $8.000 $3.880 $3.850 $4.200 $3.850
REFL PAV MRKR TY II-A-A
EA 6,900.000 $6.000 $3.880 $3.850 $4.200 $3.850
ELIM EXT PM & MRKS (4")
LF 31,042.000 $2.000 $0.600 $0.390 $0.390 $0.390
PAV SURF PREP FOR MRK (6")
LF 31,042.000 $2.000 $0.180 $0.020 $0.020 $0.020
Totals: $6,901,667.650 $5,486,284.931 $5,634,639.410 $6,166,090.960 $6,264,978.845