PREPARING ROW
|
STA
|
14.530
|
$900.000
|
$2,400.000
|
$8,918.000
|
$3,190.000
|
$11,550.000
|
$10,000.000
|
$17,000.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
70.000
|
$10.000
|
$43.000
|
$49.000
|
$50.600
|
$40.000
|
$20.000
|
$48.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
57.000
|
$25.000
|
$12.000
|
$58.000
|
$50.600
|
$50.000
|
$20.000
|
$39.000
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
338.000
|
$20.000
|
$6.000
|
$22.500
|
$55.000
|
$10.000
|
$20.000
|
$12.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
1,412.000
|
$12.000
|
$15.000
|
$10.000
|
$11.000
|
$10.000
|
$20.000
|
$11.000
|
|
|
REMOVING STAB BASE & ASPH PAV (8"-10")
|
SY
|
70.000
|
$6.000
|
$30.000
|
$9.000
|
$44.000
|
$40.000
|
$20.000
|
$22.000
|
|
|
REMOVING STAB BASE & ASPH PAV (8"-14")
|
SY
|
273.000
|
$10.000
|
$24.000
|
$14.000
|
$49.500
|
$40.000
|
$30.000
|
$22.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,440.000
|
$21.000
|
$60.000
|
$68.750
|
$93.500
|
$35.000
|
$20.000
|
$55.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
74.000
|
$21.000
|
$50.000
|
$31.000
|
$82.500
|
$80.000
|
$50.000
|
$100.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
5,266.000
|
$1.700
|
$4.000
|
$7.450
|
$1.070
|
$1.500
|
$10.000
|
$3.900
|
|
|
BLOCK SODDING
|
SY
|
5,266.000
|
$5.000
|
$5.000
|
$5.350
|
$5.060
|
$5.000
|
$10.000
|
$6.800
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
5,266.000
|
$0.200
|
$1.000
|
$0.300
|
$0.400
|
$0.230
|
$2.000
|
$0.360
|
|
|
VEGETATIVE WATERING
|
MG
|
1,567.000
|
$20.000
|
$10.000
|
$30.000
|
$55.000
|
$3.150
|
$50.000
|
$20.000
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
94.000
|
$350.000
|
$328.000
|
$295.000
|
$434.500
|
$350.000
|
$350.000
|
$295.000
|
|
|
LIME TRT (EXST MATL)(10")
|
SY
|
3,190.000
|
$4.500
|
$20.000
|
$17.250
|
$19.800
|
$15.000
|
$15.000
|
$11.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (11")
|
SY
|
2,877.000
|
$100.000
|
$160.000
|
$152.250
|
$145.000
|
$195.000
|
$150.000
|
$130.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (30 IN)
|
LF
|
11.000
|
$330.000
|
$662.000
|
$408.940
|
$600.000
|
$636.000
|
$400.000
|
$600.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
13.000
|
$400.000
|
$717.000
|
$451.020
|
$650.000
|
$689.000
|
$450.000
|
$650.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
44.000
|
$555.000
|
$772.000
|
$551.930
|
$700.000
|
$742.000
|
$600.000
|
$700.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
102.000
|
$110.000
|
$257.000
|
$297.500
|
$330.000
|
$168.000
|
$150.000
|
$142.000
|
|
|
INLET (COMPL)(PCU)(3FT)(LEFT)
|
EA
|
2.000
|
$6,500.000
|
$9,253.000
|
$18,291.000
|
$16,500.000
|
$13,650.000
|
$12,500.000
|
$6,800.000
|
|
|
INL(CMP)(PAZD-CZ)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
1.000
|
$13,000.000
|
$11,519.000
|
$19,540.000
|
$13,750.000
|
$13,650.000
|
$15,000.000
|
$6,300.000
|
|
|
ADJUSTING INLET (CAP)
|
EA
|
2.000
|
$7,000.000
|
$3,387.000
|
$4,000.000
|
$4,950.000
|
$5,250.000
|
$2,500.000
|
$1,500.000
|
|
|
REMOV STR (INLET)
|
EA
|
1.000
|
$1,500.000
|
$2,541.000
|
$650.000
|
$4,510.000
|
$2,100.000
|
$2,500.000
|
$610.000
|
|
|
REMOV STR (PIPE)
|
LF
|
68.000
|
$22.000
|
$76.000
|
$32.000
|
$16.500
|
$52.500
|
$50.000
|
$26.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$162,502.000
|
$80,000.000
|
$199,112.000
|
$202,000.000
|
$233,000.000
|
$230,000.000
|
$240,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$17,000.000
|
$5,000.000
|
$11,150.000
|
$6,000.000
|
$21,000.000
|
$8,500.000
|
$29,800.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
80.000
|
$35.000
|
$60.000
|
$25.000
|
$33.000
|
$58.300
|
$50.000
|
$30.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
80.000
|
$9.000
|
$23.000
|
$10.000
|
$15.400
|
$29.150
|
$20.000
|
$14.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
172.000
|
$35.000
|
$42.000
|
$15.000
|
$32.450
|
$25.440
|
$50.000
|
$29.500
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
172.000
|
$10.000
|
$13.000
|
$7.000
|
$12.650
|
$12.720
|
$20.000
|
$11.500
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,153.000
|
$2.500
|
$4.000
|
$1.000
|
$3.190
|
$2.650
|
$4.000
|
$2.900
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,153.000
|
$0.750
|
$1.000
|
$0.500
|
$0.990
|
$0.800
|
$2.000
|
$0.900
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
99.000
|
$4.500
|
$6.000
|
$1.000
|
$4.950
|
$5.300
|
$18.000
|
$4.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
66.000
|
$8.000
|
$10.000
|
$1.250
|
$6.600
|
$4.240
|
$18.000
|
$6.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
165.000
|
$1.300
|
$0.500
|
$0.500
|
$1.650
|
$2.120
|
$9.000
|
$1.500
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
1,080.000
|
$80.000
|
$48.000
|
$18.000
|
$22.500
|
$50.000
|
$85.000
|
$168.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
1,080.000
|
$17.000
|
$22.000
|
$14.000
|
$12.000
|
$25.000
|
$20.000
|
$9.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
1,466.000
|
$10.000
|
$5.000
|
$5.580
|
$7.000
|
$6.000
|
$35.000
|
$9.000
|
|
|
CONC SIDEWALKS (6")
|
SY
|
336.000
|
$85.000
|
$154.000
|
$159.590
|
$130.000
|
$150.000
|
$85.000
|
$74.000
|
|
|
CURB RAMPS (TY 5)
|
EA
|
5.000
|
$1,200.000
|
$3,228.000
|
$5,194.240
|
$3,500.000
|
$4,500.000
|
$3,250.000
|
$2,000.000
|
|
|
CONC MEDIAN
|
SY
|
321.000
|
$85.000
|
$170.000
|
$167.000
|
$130.000
|
$150.000
|
$150.000
|
$80.000
|
|
|
CONC MEDIAN(MONO NOSE)
|
SY
|
33.000
|
$250.000
|
$295.000
|
$442.820
|
$320.000
|
$300.000
|
$200.000
|
$113.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
3.000
|
$1,500.000
|
$4,454.000
|
$1,132.000
|
$1,100.000
|
$800.000
|
$2,500.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
3.000
|
$8,000.000
|
$4,454.000
|
$9,479.000
|
$11,000.000
|
$10,000.000
|
$21,000.000
|
$8,369.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
248.000
|
$17.500
|
$22.000
|
$16.250
|
$19.500
|
$20.670
|
$20.000
|
$19.500
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
63.000
|
$24.000
|
$35.000
|
$21.000
|
$32.000
|
$33.920
|
$30.000
|
$32.000
|
|
|
CONDT (PVC) (SCH 40) (3") (BORE)
|
LF
|
424.000
|
$48.000
|
$38.000
|
$36.890
|
$34.000
|
$36.040
|
$45.000
|
$34.000
|
|
|
CONDT (PVC) (SCH 40) (4")
|
LF
|
14.000
|
$30.000
|
$44.000
|
$30.280
|
$40.000
|
$42.400
|
$30.000
|
$40.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
44.000
|
$23.250
|
$28.000
|
$19.560
|
$25.000
|
$26.500
|
$30.000
|
$25.000
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
320.000
|
$1.500
|
$1.000
|
$1.190
|
$1.100
|
$1.170
|
$3.000
|
$1.100
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
1,344.000
|
$2.250
|
$2.000
|
$1.560
|
$1.800
|
$1.910
|
$3.000
|
$1.800
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
728.000
|
$3.000
|
$2.000
|
$1.850
|
$2.000
|
$2.120
|
$3.000
|
$2.000
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
206.000
|
$3.000
|
$3.000
|
$1.850
|
$2.500
|
$2.650
|
$3.000
|
$2.500
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
132.000
|
$4.250
|
$3.000
|
$2.530
|
$3.000
|
$3.180
|
$3.000
|
$3.000
|
|
|
GROUND BOX TY C (162911)W/APRON
|
EA
|
3.000
|
$1,715.000
|
$1,776.000
|
$1,661.070
|
$1,610.000
|
$1,706.600
|
$1,650.000
|
$1,610.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
3.000
|
$1,700.000
|
$1,985.000
|
$1,674.330
|
$1,800.000
|
$1,908.000
|
$1,650.000
|
$1,800.000
|
|
|
ELC SRV TY D 120/240 070(NS)SS(E)PS(U)
|
EA
|
1.000
|
$8,375.000
|
$11,802.000
|
$9,450.680
|
$10,700.000
|
$11,342.000
|
$9,000.000
|
$10,700.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
3.000
|
$735.000
|
$753.000
|
$950.000
|
$1,050.000
|
$1,155.000
|
$1,500.000
|
$947.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$950.000
|
$919.000
|
$1,100.000
|
$1,250.000
|
$1,575.000
|
$1,500.000
|
$1,067.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
2.000
|
$75.000
|
$102.000
|
$65.000
|
$100.000
|
$105.000
|
$100.000
|
$310.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
380.000
|
$1.000
|
$3.000
|
$3.090
|
$3.400
|
$3.100
|
$3.000
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
900.000
|
$1.000
|
$2.000
|
$3.090
|
$3.400
|
$2.070
|
$3.000
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
600.000
|
$1.000
|
$2.000
|
$3.090
|
$3.400
|
$2.070
|
$3.000
|
$3.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,345.000
|
$1.100
|
$2.000
|
$1.650
|
$1.820
|
$1.860
|
$3.000
|
$2.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
570.000
|
$6.750
|
$11.000
|
$5.800
|
$6.380
|
$9.510
|
$20.000
|
$6.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
16.000
|
$130.000
|
$238.000
|
$140.000
|
$154.000
|
$211.830
|
$250.000
|
$133.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
16.000
|
$150.000
|
$336.000
|
$160.000
|
$176.000
|
$299.660
|
$250.000
|
$134.000
|
|
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
|
EA
|
8.000
|
$45.000
|
$139.000
|
$30.000
|
$33.000
|
$124.000
|
$500.000
|
$32.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
2,818.000
|
$0.300
|
$0.500
|
$0.550
|
$0.610
|
$0.520
|
$2.000
|
$0.280
|
|
|
PAVEMENT SEALER 8"
|
LF
|
1,345.000
|
$0.350
|
$1.000
|
$0.750
|
$0.830
|
$0.690
|
$2.000
|
$0.340
|
|
|
PAVEMENT SEALER 24"
|
LF
|
570.000
|
$3.300
|
$2.000
|
$1.890
|
$2.080
|
$2.070
|
$20.000
|
$1.000
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
16.000
|
$24.000
|
$41.000
|
$55.000
|
$60.500
|
$36.170
|
$250.000
|
$17.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
16.000
|
$30.000
|
$52.000
|
$65.000
|
$71.500
|
$46.500
|
$250.000
|
$17.000
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
8.000
|
$13.000
|
$26.000
|
$15.000
|
$16.500
|
$22.730
|
$250.000
|
$10.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
280.000
|
$0.900
|
$6.000
|
$1.250
|
$1.380
|
$5.170
|
$3.000
|
$1.400
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
1,049.000
|
$0.900
|
$3.000
|
$1.250
|
$1.380
|
$3.100
|
$3.000
|
$1.250
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
1,489.000
|
$0.900
|
$3.000
|
$1.250
|
$1.380
|
$3.100
|
$3.000
|
$1.250
|
|
REFL PAV MRKR TY I-C
|
EA
|
18.000
|
$3.500
|
$23.000
|
$6.400
|
$7.040
|
$20.670
|
$6.000
|
$3.400
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
18.000
|
$3.500
|
$23.000
|
$6.400
|
$7.040
|
$20.670
|
$6.000
|
$3.400
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
70.000
|
$3.500
|
$20.000
|
$6.400
|
$7.040
|
$17.570
|
$6.000
|
$3.400
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
1,460.000
|
$0.500
|
$2.000
|
$0.750
|
$0.830
|
$2.070
|
$2.000
|
$0.890
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
1,880.000
|
$0.600
|
$2.000
|
$0.900
|
$0.990
|
$2.070
|
$3.000
|
$0.900
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
46.000
|
$2.800
|
$12.000
|
$3.500
|
$3.850
|
$10.330
|
$20.000
|
$2.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
2,818.000
|
$0.250
|
$0.500
|
$0.150
|
$0.170
|
$0.310
|
$3.000
|
$0.180
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
1,345.000
|
$0.270
|
$0.500
|
$0.250
|
$0.280
|
$0.410
|
$3.000
|
$0.190
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
570.000
|
$1.200
|
$2.000
|
$0.700
|
$0.770
|
$1.960
|
$20.000
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
16.000
|
$16.000
|
$58.000
|
$25.000
|
$27.500
|
$51.670
|
$250.000
|
$16.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
16.000
|
$18.000
|
$64.000
|
$25.000
|
$27.500
|
$56.830
|
$250.000
|
$16.000
|
|
|
PAV SURF PREP FOR MRK (18")(YLD TRI)
|
EA
|
8.000
|
$12.000
|
$46.000
|
$20.000
|
$22.000
|
$41.330
|
$250.000
|
$16.000
|
|
|
INSTALL HWY TRF SIG (ISOLATED)
|
EA
|
1.000
|
$38,375.000
|
$54,597.000
|
$34,902.550
|
$49,500.000
|
$52,470.000
|
$45,000.000
|
$49,500.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
10.000
|
$475.000
|
$463.000
|
$386.270
|
$420.000
|
$445.200
|
$400.000
|
$420.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
4.000
|
$500.000
|
$463.000
|
$392.900
|
$420.000
|
$445.200
|
$400.000
|
$420.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
10.000
|
$475.000
|
$463.000
|
$386.270
|
$420.000
|
$445.200
|
$400.000
|
$420.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
8.000
|
$475.000
|
$463.000
|
$392.900
|
$420.000
|
$445.200
|
$400.000
|
$420.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
10.000
|
$475.000
|
$463.000
|
$386.270
|
$420.000
|
$445.200
|
$400.000
|
$420.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
8.000
|
$475.000
|
$463.000
|
$386.280
|
$420.000
|
$445.200
|
$400.000
|
$420.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
8.000
|
$1,000.000
|
$1,213.000
|
$685.330
|
$1,100.000
|
$1,166.000
|
$1,500.000
|
$1,100.000
|
|
|
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
|
EA
|
10.000
|
$200.000
|
$232.000
|
$294.640
|
$210.000
|
$222.600
|
$300.000
|
$210.000
|
|
|
BACKPLATE W/REF BRDR(5 SEC)(VENT)ALUM
|
EA
|
4.000
|
$230.000
|
$265.000
|
$260.350
|
$240.000
|
$254.400
|
$320.000
|
$240.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
784.000
|
$2.750
|
$3.000
|
$2.160
|
$2.500
|
$2.650
|
$3.000
|
$2.500
|
|
|
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
|
LF
|
253.000
|
$3.750
|
$3.000
|
$3.260
|
$3.000
|
$3.180
|
$4.000
|
$3.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
|
LF
|
618.000
|
$7.500
|
$10.000
|
$6.620
|
$9.000
|
$9.540
|
$7.000
|
$9.000
|
|
|
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
|
LF
|
1,337.000
|
$2.800
|
$3.000
|
$1.780
|
$2.500
|
$2.650
|
$4.000
|
$2.500
|
|
|
INS TRF SIG PL AM(S)1 ARM(32')LUM
|
EA
|
1.000
|
$12,200.000
|
$22,611.000
|
$14,122.490
|
$20,500.000
|
$21,730.000
|
$16,500.000
|
$20,500.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')LUM
|
EA
|
1.000
|
$15,280.000
|
$24,266.000
|
$17,507.790
|
$22,000.000
|
$23,320.000
|
$25,000.000
|
$22,000.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(60')LUM
|
EA
|
2.000
|
$41,000.000
|
$54,046.000
|
$34,569.000
|
$49,000.000
|
$51,940.000
|
$40,000.000
|
$49,000.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
8.000
|
$3,840.000
|
$4,136.000
|
$3,959.390
|
$3,750.000
|
$3,975.000
|
$4,500.000
|
$3,750.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
8.000
|
$1,075.000
|
$1,434.000
|
$862.590
|
$1,300.000
|
$1,378.000
|
$1,850.000
|
$1,300.000
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
1.000
|
$3,900.000
|
$5,294.000
|
$3,903.240
|
$4,800.000
|
$5,088.000
|
$8,500.000
|
$4,800.000
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
773.000
|
$150.000
|
$160.000
|
$125.000
|
$159.500
|
$145.000
|
$185.000
|
$175.700
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
3.000
|
$7,500.000
|
$17,868.000
|
$8,706.450
|
$10,000.000
|
$10,500.000
|
$16,500.000
|
$30,000.000
|
|
|
BBU SYSTEM (EXTERNAL BATT CABINET)
|
EA
|
1.000
|
$8,430.000
|
$11,912.000
|
$7,374.770
|
$10,800.000
|
$11,448.000
|
$8,500.000
|
$10,800.000
|
|
|
TMA (STATIONARY)
|
DAY
|
44.000
|
$250.000
|
$860.000
|
$119.060
|
$300.000
|
$210.000
|
$250.000
|
$290.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
24.000
|
$80.000
|
$74.000
|
$40.210
|
$100.000
|
$105.000
|
$85.000
|
$67.000
|
|
|
RVDS(PRESENCE DETECTION ONLY)
|
EA
|
2.000
|
$9,275.000
|
$11,714.000
|
$6,861.680
|
$10,621.000
|
$11,257.200
|
$15,000.000
|
$10,620.000
|
|
|
RVDS(PRESENCE AND ADVANCE DET)
|
EA
|
2.000
|
$9,775.000
|
$13,955.000
|
$7,922.140
|
$12,652.000
|
$13,411.120
|
$15,000.000
|
$12,652.000
|
|
Totals: |
$1,628,823.800
|
$1,995,099.000
|
$2,026,492.210
|
$2,092,750.390
|
$2,379,377.910
|
$2,429,948.000
|
$2,458,977.590
|