|
|
PREPARING ROW
|
STA
|
329.170
|
$600.000
|
$500.000
|
$675.000
|
$2,108.000
|
$3,000.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
1,493.000
|
$14.000
|
$14.000
|
$21.000
|
$9.000
|
$20.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
10,089.000
|
$11.000
|
$11.460
|
$15.000
|
$11.000
|
$20.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
12,677.000
|
$12.000
|
$11.610
|
$17.500
|
$19.000
|
$25.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
460.170
|
$200.000
|
$249.430
|
$210.000
|
$230.000
|
$1,000.000
|
|
|
BLADING
|
STA
|
329.170
|
$100.000
|
$198.060
|
$315.000
|
$260.000
|
$100.000
|
|
|
STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
197,182.000
|
$0.120
|
$0.200
|
$0.140
|
$0.210
|
$0.220
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
197,182.000
|
$0.120
|
$0.070
|
$0.070
|
$0.075
|
$0.070
|
|
|
VEGETATIVE WATERING
|
MG
|
58,667.000
|
$2.500
|
$1.050
|
$1.050
|
$0.001
|
$0.010
|
|
|
FL BS (RDWY DEL) (TY D GR 1-2)
|
TON
|
6,500.000
|
$25.000
|
$28.970
|
$20.000
|
$24.000
|
$32.000
|
|
|
FL BS (CMP IN PLACE)(TY D GR 1-2)(11")
|
SY
|
40,162.000
|
$15.000
|
$15.890
|
$14.500
|
$18.000
|
$22.000
|
|
|
FL BS (CMP IN PLC)(TY D GR-1-2)(9")
|
SY
|
44,070.000
|
$14.000
|
$13.050
|
$12.100
|
$15.100
|
$22.000
|
|
|
FL BS (CMP IN PLACE) (TY D GR 1-2)(10")
|
SY
|
20,999.000
|
$14.000
|
$14.510
|
$13.250
|
$16.400
|
$22.000
|
|
|
REWRKING BS MATL (TY C)(10")(ORD COMP)
|
SY
|
15,931.000
|
$1.000
|
$1.830
|
$1.000
|
$2.520
|
$7.000
|
|
|
REWORK BS MTL (TY C) (11") (ORD COMP)
|
SY
|
33,238.000
|
$1.000
|
$1.860
|
$1.100
|
$2.250
|
$7.000
|
|
|
REWORK BS MTL (TY C)(13"-15.5")(OC)
|
SY
|
33,434.000
|
$1.000
|
$1.850
|
$1.550
|
$2.250
|
$7.000
|
|
|
CEMENT
|
TON
|
618.000
|
$150.000
|
$137.000
|
$155.890
|
$165.000
|
$185.000
|
|
|
CEMENT TREAT (EXIST MATL) (6")
|
SY
|
41,549.000
|
$3.000
|
$1.940
|
$2.000
|
$2.200
|
$2.750
|
|
|
CEMENT TREAT (MX EXST MTL & NW BS) (6")
|
SY
|
21,724.000
|
$3.000
|
$1.950
|
$2.000
|
$2.200
|
$3.000
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
45,591.000
|
$3.000
|
$1.940
|
$2.250
|
$2.250
|
$3.500
|
|
|
EMULS ASPH (PRIME)(MS-2 OR SS-1)
|
GAL
|
21,048.000
|
$4.000
|
$4.390
|
$4.400
|
$4.000
|
$3.150
|
|
|
ASPH (CRS-2P)
|
GAL
|
17,539.000
|
$4.000
|
$4.390
|
$3.600
|
$3.900
|
$3.650
|
|
|
ASPH (RC-250)
|
GAL
|
9,825.000
|
$4.250
|
$4.640
|
$4.100
|
$4.000
|
$4.250
|
|
|
AGGR(TY-B GR-5 SAC-B)
|
CY
|
285.000
|
$130.000
|
$137.870
|
$150.000
|
$175.000
|
$155.000
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
14,738.000
|
$4.000
|
$3.790
|
$2.800
|
$3.750
|
$3.000
|
|
|
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
|
CY
|
668.000
|
$120.000
|
$138.320
|
$152.500
|
$195.000
|
$150.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
|
SY
|
5,288.000
|
$115.000
|
$54.980
|
$73.500
|
$75.000
|
$6.500
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
52,891.000
|
$2.000
|
$0.640
|
$2.100
|
$2.250
|
$0.650
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 4")
|
SY
|
82,603.000
|
$2.500
|
$0.780
|
$3.150
|
$3.250
|
$1.750
|
|
|
CEM STABIL BKFL
|
CY
|
591.000
|
$180.000
|
$215.000
|
$95.000
|
$110.000
|
$115.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
338.000
|
$90.000
|
$110.000
|
$123.000
|
$160.000
|
$175.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
613.000
|
$15.000
|
$18.000
|
$4.000
|
$13.000
|
$15.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
5,679.000
|
$30.000
|
$25.820
|
$21.000
|
$53.000
|
$5.000
|
|
|
RIPRAP (STONE COMMON)(GROUT)(12 IN)
|
CY
|
141.000
|
$200.000
|
$150.000
|
$295.000
|
$110.000
|
$285.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
131.000
|
$450.000
|
$475.000
|
$630.000
|
$575.000
|
$550.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
168.000
|
$230.000
|
$300.000
|
$240.000
|
$525.000
|
$575.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
112.000
|
$400.000
|
$375.000
|
$335.000
|
$600.000
|
$625.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)
|
LF
|
56.000
|
$500.000
|
$400.000
|
$336.000
|
$650.000
|
$675.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
|
LF
|
37.000
|
$570.000
|
$500.000
|
$445.000
|
$475.000
|
$510.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
|
LF
|
58.000
|
$550.000
|
$525.000
|
$446.000
|
$485.000
|
$525.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
|
LF
|
49.000
|
$600.000
|
$550.000
|
$475.000
|
$500.000
|
$550.000
|
|
|
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
|
LF
|
15.000
|
$700.000
|
$600.000
|
$700.000
|
$555.000
|
$600.000
|
|
|
CONC BOX CULV (10 FT X 8 FT)(EXTEND)
|
LF
|
46.000
|
$1,100.000
|
$1,200.000
|
$1,000.000
|
$950.000
|
$1,050.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
4,102.000
|
$50.000
|
$42.000
|
$52.500
|
$51.000
|
$55.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
934.000
|
$60.000
|
$58.000
|
$63.000
|
$98.000
|
$110.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
436.000
|
$100.000
|
$85.000
|
$84.000
|
$115.000
|
$125.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
32.000
|
$125.000
|
$115.000
|
$126.000
|
$145.000
|
$165.000
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
177.000
|
$85.000
|
$85.000
|
$73.500
|
$110.000
|
$115.000
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX5FT-3FTX5FT)
|
EA
|
1.000
|
$5,500.000
|
$8,500.000
|
$7,350.000
|
$3,600.000
|
$4,100.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 24 IN)
|
EA
|
2.000
|
$4,500.000
|
$4,500.000
|
$3,150.000
|
$3,600.000
|
$4,100.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
7.000
|
$4,500.000
|
$4,800.000
|
$4,200.000
|
$4,600.000
|
$5,200.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 30 IN)
|
EA
|
2.000
|
$6,500.000
|
$5,500.000
|
$5,250.000
|
$6,200.000
|
$6,900.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 24 IN)
|
EA
|
3.000
|
$5,000.000
|
$5,000.000
|
$4,200.000
|
$5,200.000
|
$5,700.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 30 IN)
|
EA
|
2.000
|
$7,000.000
|
$6,000.000
|
$6,600.000
|
$7,700.000
|
$8,600.000
|
|
|
WINGWALL (PW - 1) (HW=10 FT)
|
EA
|
4.000
|
$31,000.000
|
$38,000.000
|
$31,500.000
|
$33,000.000
|
$37,000.000
|
|
|
WINGWALL (PW - 1) (HW=3 FT)
|
EA
|
7.000
|
$10,000.000
|
$7,500.000
|
$8,400.000
|
$4,650.000
|
$5,100.000
|
|
|
WINGWALL (PW - 1) (HW=4 FT)
|
EA
|
6.000
|
$11,000.000
|
$9,500.000
|
$8,450.000
|
$6,700.000
|
$7,400.000
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
5.000
|
$12,000.000
|
$13,000.000
|
$10,500.000
|
$9,000.000
|
$9,700.000
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
2.000
|
$16,000.000
|
$16,000.000
|
$11,550.000
|
$13,000.000
|
$14,300.000
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
1.000
|
$17,000.000
|
$18,000.000
|
$14,700.000
|
$16,000.000
|
$17,800.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
287.000
|
$650.000
|
$575.000
|
$945.000
|
$925.000
|
$975.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
7.000
|
$700.000
|
$750.000
|
$1,050.000
|
$950.000
|
$1,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
38.000
|
$1,000.000
|
$1,000.000
|
$1,365.000
|
$1,000.000
|
$1,100.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
18.000
|
$2,300.000
|
$2,600.000
|
$2,520.000
|
$2,650.000
|
$2,800.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$4,000.000
|
$5,500.000
|
$5,250.000
|
$3,700.000
|
$4,000.000
|
|
|
REMOV STR (INLET)
|
EA
|
2.000
|
$750.000
|
$1,000.000
|
$400.000
|
$860.000
|
$925.000
|
|
|
REMOV STR (SET)
|
EA
|
30.000
|
$300.000
|
$225.000
|
$400.000
|
$530.000
|
$575.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
29.000
|
$1,300.000
|
$1,000.000
|
$3,150.000
|
$1,250.000
|
$1,375.000
|
|
|
REMOV STR (PIPE)
|
LF
|
4,440.000
|
$12.000
|
$12.000
|
$13.650
|
$27.000
|
$29.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
275.000
|
$50.000
|
$60.000
|
$84.000
|
$220.000
|
$230.000
|
|
|
REMOV STR (RET WALL)
|
LF
|
7.000
|
$55.000
|
$60.000
|
$126.000
|
$158.000
|
$250.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$920,000.000
|
$1,047,655.000
|
$959,000.000
|
$1,225,238.000
|
$1,235,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
24.000
|
$8,000.000
|
$8,400.000
|
$31,500.000
|
$40,000.000
|
$40,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,020.000
|
$25.000
|
$28.000
|
$27.500
|
$32.000
|
$30.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,020.000
|
$8.500
|
$6.000
|
$12.500
|
$6.250
|
$8.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
498.000
|
$16.000
|
$20.000
|
$10.500
|
$21.000
|
$25.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
498.000
|
$8.500
|
$5.000
|
$5.250
|
$5.250
|
$7.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
7,745.000
|
$2.500
|
$2.000
|
$1.500
|
$2.100
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
7,745.000
|
$0.700
|
$0.500
|
$0.100
|
$0.550
|
$0.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
2,100.000
|
$3.500
|
$4.000
|
$3.000
|
$4.550
|
$4.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,100.000
|
$0.800
|
$0.500
|
$1.000
|
$0.550
|
$0.500
|
|
|
DRIVEWAYS (CONC)
|
SY
|
1,505.000
|
$90.000
|
$95.000
|
$84.000
|
$120.000
|
$110.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
13,558.000
|
$38.000
|
$42.790
|
$52.500
|
$45.000
|
$50.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
24,524.000
|
$0.700
|
$0.200
|
$0.400
|
$0.100
|
$0.320
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
12,262.000
|
$0.700
|
$0.200
|
$0.400
|
$0.090
|
$0.320
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,675.000
|
$20.000
|
$15.370
|
$18.550
|
$20.000
|
$16.250
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$800.000
|
$1,375.200
|
$1,962.810
|
$1,585.000
|
$1,500.000
|
|
|
SHORT RADIUS
|
LF
|
25.000
|
$30.000
|
$32.440
|
$30.840
|
$27.000
|
$35.000
|
|
|
DRIVEWAY TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$850.000
|
$922.010
|
$824.060
|
$900.000
|
$975.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,475.000
|
$2.750
|
$1.690
|
$2.130
|
$3.250
|
$1.750
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$250.000
|
$101.400
|
$281.780
|
$175.000
|
$110.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
17.000
|
$2,450.000
|
$2,319.460
|
$2,472.170
|
$2,800.000
|
$2,400.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
10.000
|
$260.000
|
$33.800
|
$239.240
|
$275.000
|
$35.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
89.000
|
$225.000
|
$218.000
|
$231.800
|
$285.000
|
$230.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
13.000
|
$270.000
|
$252.000
|
$267.950
|
$365.000
|
$265.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
4.000
|
$300.000
|
$528.000
|
$561.420
|
$685.000
|
$555.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
110.000
|
$450.000
|
$424.000
|
$450.840
|
$475.000
|
$445.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
9.000
|
$700.000
|
$444.000
|
$472.110
|
$695.000
|
$470.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
5.000
|
$600.000
|
$539.000
|
$573.120
|
$625.000
|
$565.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
2.000
|
$660.000
|
$669.000
|
$711.350
|
$800.000
|
$700.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
14.000
|
$750.000
|
$787.000
|
$836.820
|
$1,050.000
|
$790.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
1.000
|
$850.000
|
$898.000
|
$954.840
|
$1,035.000
|
$950.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
8.000
|
$850.000
|
$923.000
|
$981.430
|
$1,000.000
|
$975.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
69.000
|
$55.000
|
$50.000
|
$53.170
|
$60.000
|
$53.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
68.000
|
$25.000
|
$20.000
|
$21.270
|
$36.000
|
$21.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
15,001.000
|
$0.350
|
$0.500
|
$0.530
|
$0.550
|
$0.530
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
26,050.000
|
$0.800
|
$1.750
|
$0.800
|
$0.800
|
$0.790
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
8,182.000
|
$0.800
|
$2.250
|
$2.000
|
$1.100
|
$0.790
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
117.000
|
$2.000
|
$1.000
|
$1.060
|
$1.100
|
$1.050
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
124.000
|
$0.950
|
$1.000
|
$1.060
|
$1.100
|
$1.050
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
66.000
|
$3.250
|
$5.000
|
$5.320
|
$5.250
|
$5.250
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
498.000
|
$6.500
|
$5.500
|
$5.850
|
$5.650
|
$5.780
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
100.000
|
$0.400
|
$1.000
|
$1.060
|
$1.100
|
$1.050
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
90,712.000
|
$0.400
|
$0.420
|
$0.450
|
$0.470
|
$0.440
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
2,928.000
|
$0.550
|
$0.650
|
$0.690
|
$0.700
|
$0.680
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
1,152.000
|
$0.450
|
$0.500
|
$0.530
|
$0.550
|
$0.530
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
91,537.000
|
$0.400
|
$0.420
|
$0.450
|
$0.450
|
$0.440
|
|
REFL PAV MRKR TY I-C
|
EA
|
10.000
|
$4.000
|
$5.000
|
$5.320
|
$5.500
|
$5.250
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,552.000
|
$4.000
|
$3.200
|
$3.400
|
$3.450
|
$3.360
|
|
|
SP MIXES SP-C SAC-B PG64-22
|
TON
|
16,991.000
|
$80.000
|
$91.950
|
$88.000
|
$89.000
|
$93.000
|
|
|
TACK COAT
|
GAL
|
9,487.000
|
$3.500
|
$3.950
|
$6.000
|
$3.350
|
$0.530
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
10.000
|
$12,000.000
|
$5,000.000
|
$5,000.000
|
$17,100.000
|
$3,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
445.000
|
$225.000
|
$100.000
|
$157.500
|
$315.000
|
$225.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
490.000
|
$100.000
|
$75.000
|
$73.500
|
$75.000
|
$75.000
|
|
Totals: |
$9,948,671.530
|
$9,596,783.183
|
$10,579,577.860
|
$12,439,438.237
|
$13,506,341.210
|