COLLIN US 380 (0135-02-069)

Items: 33

County: COLLIN
Length: N/A
Highway: US 380
District: DALLAS
Control Number: 0135-02-069
DBE Goal: N/A
Project: STP 2023(168)HES
Guaranty: N/A
Time: 140 WORKING DAYS
Engineer's Estimate: $2,304,266.00
Date: 11/03/2022 (3 years ago)
Contract Number: N/A
Type: INSTALL ILLUMINATION
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$2,304,266.00
Over/Under Est: -13.2% -$304,266.02
$2,180,604.91
Over/Under Est: -5.37% -$123,661.09
Amt Left: 9.03% $180,604.93
$2,216,600.79
Over/Under Est: -3.8% -$87,665.21
Amt Left: 10.83% $216,600.81
Delta: -1.65% -$35,995.88
Subcontractor Percentage Amount
NORTH TEXAS INTELLIGENT TRANSPORTATION SYSTEMS LLC 4.67% $93,400.00
LONE STAR EROSION CONTROL 3.98% $79,600.00
SUPERIOR TRAFFIC CONTROL, LLC 0.85% $17,000.00
Total: 9.50% $190,000.00

Bid Items & Bid Tabulations

33 Total 0 of 33
COLLIN  |  US 380  |  DALLAS  |  0135-02-069  |  11/03/2022  |  $2,304,266.00  |  STP 2023(168)HES  |  INSTL ILLUM  |  140 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, LLC
MICA CORPORATION
SICE, INC.
DRILL SHAFT (HIGH MAST POLE) (54 IN)
LF 150.000 $800.000 $628.570 $457.000 $637.814
DRILL SHAFT (HIGH MAST POLE) (60 IN)
LF 237.000 $1,000.000 $704.740 $531.000 $721.293
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 152.000 $350.000 $231.420 $189.000 $99.563
RIPRAP (CONC)(4 IN)
CY 32.680 $750.000 $938.880 $875.000 $855.268
RIPRAP (MOW STRIP)(4 IN)
CY 46.360 $750.000 $821.400 $830.000 $785.948
MOBILIZATION
LS 1.000 $300,000.000 $165,887.940 $213,500.000 $196,000.077
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $5,000.000 $4,182.410 $29,310.000 $5,557.095
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 750.000 $2.000 $2.340 $11.050 $3.673
BIODEG EROSN CONT LOGS (REMOVE)
LF 750.000 $1.000 $2.940 $5.800 $1.020
MTL W-BEAM GD FEN (TIM POST)
LF 1,875.000 $75.000 $24.850 $19.850 $25.443
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 10.000 $2,000.000 $1,076.490 $1,290.000 $1,348.810
GUARDRAIL END TREATMENT (INSTALL)
EA 10.000 $4,000.000 $3,106.240 $3,055.000 $3,433.333
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 20.000 $1,500.000 $1,077.840 $1,290.000 $1,384.431
HI MST IL POLE (125 FT)( 80 MPH)
EA 5.000 $47,000.000 $36,780.670 $34,155.000 $42,481.446
HI MST IL POLE (150 FT)( 80 MPH)
EA 8.000 $55,000.000 $45,713.620 $40,690.000 $50,746.042
LED HI MST IL ASM (6 FIXT) (ASYM)(TY B)
EA 1.000 $9,500.000 $29,480.310 $26,230.000 $28,277.642
LED HI MST IL AM(6 FIXT)ASYM(TY A)SHLD
EA 12.000 $9,000.000 $30,065.310 $29,315.000 $29,607.241
CONDT (PVC) (SCH 40) (2")
LF 8,003.000 $12.000 $10.900 $12.500 $11.980
CONDT (PVC) (SCH 40) (2") (BORE)
LF 1,491.000 $25.000 $15.990 $30.300 $21.655
CONDT (PVC) (SCH 80) (2")
LF 105.000 $15.000 $12.990 $21.400 $24.867
CONDT (RM) (1")
LF 918.000 $40.000 $25.290 $27.850 $20.193
ELEC CONDR (NO.12) BARE
LF 948.000 $1.500 $0.970 $1.250 $2.355
ELEC CONDR (NO.12) INSULATED
LF 1,896.000 $2.500 $1.070 $1.350 $2.148
ELEC CONDR (NO.8) BARE
LF 9,914.000 $2.000 $1.270 $1.550 $1.619
ELEC CONDR (NO.8) INSULATED
LF 20,526.000 $2.500 $1.470 $1.710 $1.692
GROUND BOX TY A (122311)
EA 13.000 $900.000 $817.410 $945.000 $978.868
GROUND BOX TY A (122311)W/APRON
EA 19.000 $1,200.000 $993.390 $1,471.000 $1,278.917
ELC SRV TY A 240/480 060(NS)AL(E)PS(U)
EA 9.000 $6,500.000 $6,559.200 $8,610.000 $9,569.804
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 10.000 $500.000 $173.740 $196.000 $471.399
TMA (STATIONARY)
DAY 110.000 $200.000 $202.490 $244.000 $703.972
RDWY LIGHTING ASSY (30 FT)(TY 1)
EA 2.000 $5,000.000 $4,106.760 $4,422.000 $4,217.091
RDWY LIGHTING ASSY (30 FT)(TY 2)
EA 13.000 $5,500.000 $4,899.330 $5,886.000 $5,245.431
RDWY LIGHTING ASSY (40 FT)(TY 1)
EA 4.000 $6,000.000 $4,989.420 $4,800.000 $4,640.127
Totals: $2,304,266.000 $1,999,999.992 $2,180,604.910 $2,216,600.898