COLLIN US 380 (0135-02-062)

Items: 27

County: COLLIN
Length: N/A
Highway: US 380
District: DALLAS
Control Number: 0135-02-062
DBE Goal: N/A
Project: STP 2020(658)HES
Guaranty: N/A
Time: 120 WORKING DAYS
Engineer's Estimate: $987,279.40
Date: 03/05/2020 (6 years ago)
Contract Number: N/A
Type: INSTALLATION OF ILLUMINATION & DMS REHABILITATION
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$987,279.40
Over/Under Est: -16.1% -$158,917.46
Over/Under Est: -8.13% -$80,256.57
Amt Left: 9.5% $78,660.89
Over/Under Est: -3.53% -$34,858.09
Amt Left: 14.98% $124,059.37
Delta: -5.01% -$45,398.48
$1,304,504.26
Over/Under Est: 32.13% $317,224.86
Amt Left: 57.48% $476,142.32
Delta: -36.97% -$352,082.95
$1,313,327.27
Over/Under Est: 33.02% $326,047.87
Amt Left: 58.55% $484,965.33
Delta: -0.68% -$8,823.01

Bid Items & Bid Tabulations

27 Total 0 of 27
COLLIN  |  US 380  |  DALLAS  |  0135-02-062  |  03/05/2020  |  $987,279.40  |  STP 2020(658)HES  |  INSTL OF ILLUM & DMS REHAB  |  120 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FLORIDA TRAFFIC CONTROL DEVICES, INC.
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC.
AMERICAN LIGHTING AND SIGNALIZATION, LLC
ALTUS CONSTRUCTION LLC
MICA CORPORATION
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 416.000 $225.000 $270.090 $166.690 $399.340 $273.680 $207.250
CL A CONC (MISC)
CY 1.610 $600.000 $2,002.420 $1,007.250 $1,895.800 $773.440 $4,555.000
MOBILIZATION
LS 1.000 $80,000.000 $82,059.500 $99,302.020 $95,598.640 $128,509.290 $128,500.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $10,000.000 $4,271.500 $7,747.000 $7,378.740 $17,848.510 $14,275.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 200.000 $5.000 $8.470 $6.720 $4.860 $4.160 $12.350
BIODEG EROSN CONT LOGS (REMOVE)
LF 200.000 $0.750 $1.820 $2.030 $2.130 $0.710 $6.600
CONDT (PVC) (SCH 40) (2")
LF 1,656.000 $10.500 $9.500 $9.290 $11.450 $11.900 $14.150
CONDT (PVC) (SCH 40) (2") (BORE)
LF 7,200.000 $22.500 $15.280 $19.640 $12.460 $31.530 $30.100
CONDT (PVC) (SCH 40) (3")
LF 580.000 $11.000 $12.520 $10.970 $19.210 $13.980 $36.850
ELEC CONDR (NO.8) BARE
LF 9,180.000 $1.150 $0.910 $1.100 $1.230 $1.730 $1.590
ELEC CONDR (NO.8) INSULATED
LF 18,968.000 $1.250 $1.020 $1.190 $1.230 $1.770 $1.680
ELEC CONDR (NO.6) BARE
LF 3,869.000 $1.400 $1.050 $1.320 $1.410 $2.180 $1.750
ELEC CONDR (NO.6) INSULATED
LF 3,894.000 $1.700 $1.190 $1.450 $1.830 $2.230 $1.860
ELEC CONDR (NO.4) INSULATED
LF 3,714.000 $1.750 $1.490 $1.760 $2.340 $2.320 $2.050
ELEC CONDR (NO.2) INSULATED
LF 5,760.000 $2.750 $2.180 $2.250 $2.750 $3.440 $3.150
GROUND BOX TY A (122311)
EA 1.000 $750.000 $785.540 $1,024.950 $1,286.190 $1,070.910 $1,516.000
GROUND BOX TY A (122311)W/APRON
EA 1.000 $1,000.000 $785.540 $1,082.450 $1,700.570 $1,308.890 $1,865.000
ELC SRV TY A 240/480 060(NS)AL(E)GC(O)
EA 2.000 $6,000.000 $6,041.060 $5,599.450 $5,519.600 $10,114.160 $8,085.000
ITS COM CBL (ETHERNET)
LF 251.000 $3.250 $1.830 $9.270 $5.260 $4.690 $14.600
FIBER OPTIC CBL (SNGLE-MODE)(6 FIBER)
LF 5,304.000 $5.000 $3.190 $9.570 $5.440 $5.950 $6.900
RELOCATE FIBER OPTIC CABLE
LF 133.000 $3.000 $13.940 $4.960 $33.240 $5.950 $47.550
CONDUIT (PREPARE)
LF 8,919.000 $2.250 $8.370 $1.110 $0.930 $2.800 $3.960
GROUND BOX (PREPARE)
EA 40.000 $325.000 $274.760 $377.000 $216.110 $475.960 $830.000
INSTALL DMS (FOUNDATION MTD CABINET)
EA 8.000 $17,000.000 $6,475.520 $15,278.750 $21,145.100 $22,013.160 $26,475.000
REMOVE EXIST FIB OPT DMS SYS(TY-2)
EA 8.000 $5,325.000 $2,157.690 $5,325.000 $2,376.450 $6,336.220 $9,065.000
TMA (STATIONARY)
DAY 28.000 $200.000 $349.200 $224.600 $534.080 $297.480 $264.000
ROADWAY LIGHTING ASSEMBLY (TY 1)
EA 52.000 $4,200.000 $4,031.180 $3,534.700 $3,211.180 $4,462.130 $3,830.000
Totals: $987,279.400 $828,361.946 $907,022.832 $952,421.318 $1,304,504.268 $1,313,327.270