COLLIN BS 289C (0091-09-017)

Items: 78

County: COLLIN
Length: N/A
Highway: BS 289C
District: DALLAS
Control Number: 0091-09-017
DBE Goal: 0.0%
Project: C 91-9-17
Guaranty: N/A
Time: 206 WORKING DAYS
Engineer's Estimate: $2,326,392.07
Date: 06/06/2024 (2 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
JENNIFER VORSTER
DEREJE TESEMMA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$2,326,392.07
$2,843,504.70
Over/Under Est: 22.23% $517,112.63
$3,227,197.26
Over/Under Est: 38.72% $900,805.19
Amt Left: 13.49% $383,692.56
Over/Under Est: 45.45% $1,057,387.72
Amt Left: 19% $540,275.09
Delta: -4.85% -$156,582.53
Subcontractor Percentage Amount
USA SWPPP INSPECTIONS, INC.DBA USA EROSION 3.54% $100,660.07
DUSTROL, INC. 2.01% $57,154.44
TRP CONSTRUCTION GROUP, LLC 1.38% $39,240.36
SYNERGY SIGNS & SERVICES LLC 1.24% $35,259.46
BARRICADES UNLIMITED 0.63% $17,914.08
CIVIL TREE SOLUTIONS, LLC 0.59% $16,776.68
HDZ CONSTRUCTION 0.00% $0.00
Total: 9.39% $267,005.09

Bid Items & Bid Tabulations

78 Total 0 of 78
COLLIN  |  BS 289C  |  DALLAS  |  0091-09-017  |  06/06/2024  |  $2,326,392.07  |  C 91-9-17  |  REHAB EXIST ROADWAY  |  206 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAGOE-PUBLIC COMPANY
FNH CONSTRUCTION, LLC
ED BELL CONSTRUCTION COMPANY
PREPARING ROW
STA 77.970 $600.000 $1,500.000 $2,948.000 $1,946.000
REMOVING CONC (DRIVEWAYS)
SY 359.000 $13.000 $25.000 $20.000 $50.000
REMOVING STAB BASE & ASPH PAV (12")
SY 1,144.000 $30.000 $60.000 $40.000 $13.750
EXCAVATION (ROADWAY)
CY 129.000 $12.000 $25.000 $50.000 $129.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 2,952.000 $14.000 $5.000 $50.000 $8.500
BACKFILL (TY A OR B)
STA 77.970 $215.000 $500.000 $450.000 $750.000
BLADING
STA 77.970 $205.000 $440.000 $250.000 $750.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 17,683.000 $0.200 $0.250 $0.500 $0.210
DRILL SEED (TEMP)(WARM OR COOL)
SY 17,683.000 $0.200 $0.200 $0.500 $0.110
VEGETATIVE WATERING
MG 5,262.000 $11.000 $1.000 $10.000 $1.050
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 168.000 $143.000 $125.000 $150.000 $181.500
PLANE ASPH CONC PAV(0" TO 2")
SY 22,059.000 $3.150 $4.100 $5.000 $3.000
FULL-DEPTH REPAIR CRCP (8"-10")
SY 138.000 $350.000 $210.000 $550.000 $343.500
CEM STABIL BKFL
CY 151.000 $190.000 $300.000 $350.000 $287.500
CUT & RESTORE ASPH PAVING
SY 219.000 $150.000 $150.000 $200.000 $178.250
TRENCH EXCAVATION PROTECTION
LF 116.000 $15.000 $13.250 $10.000 $1.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 146.000 $200.000 $300.000 $185.000 $300.000
RIPRAP (MOW STRIP)(4 IN)
CY 62.000 $41.000 $1,400.000 $550.000 $850.000
CONC BOX CULV (8 FT X 8 FT)
LF 84.000 $1,500.000 $910.000 $1,400.000 $1,075.000
RC PIPE (CL III)(18 IN)
LF 409.000 $70.000 $130.000 $85.000 $64.500
RC PIPE (CL III)(24 IN)
LF 242.000 $110.000 $160.000 $150.000 $143.750
RC PIPE (CL III)(42 IN)
LF 54.000 $150.000 $370.000 $350.000 $329.250
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 4.000 $5,500.000 $7,500.000 $6,500.000 $7,500.000
HEADWALL (CH - PW - 0) (DIA= 42 IN)
EA 2.000 $9,000.000 $15,000.000 $15,000.000 $15,000.000
WINGWALL (PW - 1) (HW=10 FT)
EA 2.000 $72,000.000 $75,000.000 $50,000.000 $60,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 18.000 $950.000 $2,100.000 $1,000.000 $1,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 4.000 $1,000.000 $2,700.000 $2,200.000 $1,500.000
SET (TY II) (36 IN) (RCP) (4: 1) (P)
EA 2.000 $4,000.000 $3,900.000 $3,500.000 $5,000.000
CLEAN EXIST CULVERTS
EA 1.000 $2,000.000 $15,000.000 $5,000.000 $8,800.000
REMOV STR (SET)
EA 12.000 $1,100.000 $100.000 $500.000 $750.000
REMOV STR (HEADWALL)
EA 5.000 $787.500 $960.000 $2,500.000 $2,000.000
REMOV STR (PIPE)
LF 777.000 $23.000 $30.000 $50.000 $31.500
MOBILIZATION
LS 1.000 $230,971.000 $275,000.000 $285,000.000 $315,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $12,000.000 $20,000.000 $15,000.000 $42,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 400.000 $28.000 $67.000 $40.000 $65.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 200.000 $40.000 $170.000 $40.000 $75.000
ROCK FILTER DAMS (REMOVE)
LF 600.000 $7.000 $33.000 $15.000 $40.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 82.000 $23.000 $25.000 $50.000 $27.500
CONSTRUCTION EXITS (REMOVE)
SY 82.000 $8.000 $10.000 $20.000 $15.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 5,226.000 $3.600 $6.000 $4.000 $3.050
TEMP SEDMT CONT FENCE (REMOVE)
LF 5,226.000 $0.750 $2.000 $2.000 $1.100
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 662.000 $4.000 $15.000 $18.000 $5.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 662.000 $0.750 $3.000 $9.000 $2.200
DRIVEWAYS (CONC)
SY 216.000 $91.670 $140.000 $85.000 $168.000
DRIVEWAYS (ACP)
SY 968.000 $40.000 $69.000 $55.000 $125.000
RUMBLE STRIPS (SHOULDER)
LF 1,201.000 $0.350 $3.000 $0.500 $3.000
RUMBLE STRIPS (CENTERLINE)
LF 706.000 $0.350 $3.300 $0.500 $6.000
MTL W-BEAM GD FEN (TIM POST)
LF 225.000 $25.000 $31.000 $30.000 $24.750
REMOVE METAL BEAM GUARD FENCE
LF 225.000 $2.500 $6.000 $3.000 $3.300
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,100.000 $4,000.000 $3,250.000 $3,162.500
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $375.000 $370.000 $1,500.000 $275.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 5.000 $235.000 $320.000 $1,150.000 $286.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 14.000 $603.250 $790.000 $1,500.000 $704.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 1.000 $625.000 $870.000 $1,500.000 $774.400
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 2.000 $1,000.000 $1,500.000 $1,500.000 $1,365.100
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 1.000 $1,100.000 $630.000 $1,500.000 $561.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 10.000 $27.000 $35.000 $1,500.000 $39.050
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 6.000 $19.000 $74.000 $100.000 $50.600
WK ZN PAV MRK NON-REMOV (W)6"(DOT)
LF 36.000 $2.000 $4.000 $3.000 $1.380
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 16,363.000 $0.350 $0.550 $1.000 $0.880
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 820.000 $2.000 $3.000 $6.000 $6.000
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 36.000 $3.000 $2.500 $6.000 $1.710
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 200.000 $2.500 $1.200 $6.000 $1.380
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 42.000 $2.000 $5.250 $8.000 $11.550
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 260.000 $6.750 $9.600 $20.000 $16.780
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 4.000 $130.000 $190.000 $250.000 $275.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 4.000 $150.000 $230.000 $250.000 $313.500
REFL PAV MRK TY II (W) (RR XING)
EA 2.000 $375.000 $610.000 $500.000 $632.500
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 14,939.000 $0.680 $0.850 $1.100 $0.940
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 16,363.000 $0.760 $0.850 $1.100 $0.940
REFL PAV MRKR TY I-C
EA 12.000 $8.000 $10.500 $6.000 $7.650
REFL PAV MRKR TY II-A-A
EA 230.000 $5.650 $10.500 $6.000 $7.650
SP MIXES SP-B PG64-22
TON 2,822.000 $107.000 $110.000 $145.000 $150.000
SP MIXES SP-C SAC-B PG64-22
TON 3,113.000 $150.000 $135.000 $170.000 $176.250
TACK COAT
GAL 3,419.000 $3.600 $1.000 $6.000 $1.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $12,000.000 $25,000.000 $16,500.000 $13,000.000
TMA (STATIONARY)
DAY 200.000 $130.000 $150.000 $250.000 $157.500
TMA (MOBILE OPERATION)
HR 200.000 $125.000 $75.000 $55.000 $100.000
Totals: $2,326,392.070 $2,843,504.700 $3,227,197.260 $3,383,779.790