Show Job Controls
Bid Cobra

COLLIN US 75 (0047-14-082)

Items: 55

County: COLLIN
Length: N/A
Highway: US 75
District: DALLAS
Control Number: 0047-14-082
DBE Goal: N/A
Project: NH 1702(450)
Guaranty: N/A
Time: 378 WORKING DAYS
Engineer's Estimate: $2,311,463.94
Date: 07/12/2017 (8 years ago)
Contract Number: N/A
Type: LANDSCAPE TREATMENT OF RIGHTS OF WAY AND MEDIANS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$2,311,463.94
1
Awarded
$2,750,000.00
Over/Under Est: 18.97% $438,536.06
Over/Under Est: 23.51% $543,536.06
Amt Left: 3.82% $105,000.00
$3,182,857.00
Over/Under Est: 37.7% $871,393.06
Amt Left: 15.74% $432,857.00
Delta: -11.48% -$327,857.00
$3,474,472.12
Over/Under Est: 50.31% $1,163,008.18
Amt Left: 26.34% $724,472.12
Delta: -9.16% -$291,615.12

Bid Items & Bid Tabulations

55 Total 0 of 55
COLLIN  |  US 75  |  DALLAS  |  0047-14-082  |  07/12/2017  |  $2,311,463.94  |  NH 1702(450)  |  LANDSCAPE TREATMENT OF RIGHTS OF WAY...  |  378 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
AALC, INC.
APEX LANDSCAPE & IRRIGATION, LLC
ENCINO LANDSCAPE, INC.
MCM
PREPARING ROW
AC 19.540 $4,400.000 $1,850.000 $2,500.000 $2,000.000 $4,745.000
EMBANKMENT (FINAL)(ORD COMP)(TY D)
CY 900.000 $30.090 $15.000 $17.500 $30.000 $18.100
EROSION CONTROL COMPOST (1.5")
SY 16,205.000 $1.800 $2.030 $1.500 $2.000 $1.850
COMPOST MANUF TOPSOIL (2")
SY 63,262.000 $1.500 $1.950 $1.630 $3.000 $2.600
FERTILIZER
AC 16.780 $750.000 $201.000 $700.000 $1,000.000 $1,180.000
IRRIGATION SYSTEM
LS 1.000 $300,000.000 $409,538.160 $514,785.320 $500,000.000 $495,000.000
WILDFLOWER SEEDING (MIX 1)
AC 3.300 $2,000.000 $3,002.000 $1,500.000 $3,000.000 $4,150.000
PLANT MATERIAL (1-GAL)
EA 55,287.000 $3.000 $2.000 $3.650 $10.000 $7.300
PLANT MATERIAL (3-GAL)
EA 5,022.000 $8.000 $9.000 $15.000 $20.000 $23.500
PLANT MATERIAL (5-GAL)
EA 104.000 $28.000 $18.000 $17.000 $30.000 $35.500
MULCH
CY 5,797.000 $14.000 $20.950 $20.000 $30.000 $47.000
MULCH
SY 57,619.000 $2.500 $3.000 $3.130 $4.000 $2.950
PLANT MATERIAL (45 GAL) (TREE)
EA 119.000 $340.000 $250.000 $220.000 $400.000 $465.000
IRRIG SYS OPER AND MAINT (SCH A)
MO 12.000 $2,000.000 $750.000 $1,250.000 $3,000.000 $1,800.000
DRILL SHAFT (18 IN)
LF 264.000 $100.000 $85.690 $85.000 $100.000 $175.000
CL A CONC (MISC)
CY 31.500 $750.000 $254.000 $550.000 $700.000 $865.000
RETAINING WALL (STONE)
SF 468.000 $100.000 $175.000 $63.250 $50.000 $92.000
RETAINING WALL (GABION)
SF 2,332.000 $35.000 $60.000 $77.000 $30.000 $59.000
RIPRAP (STONE TY R)(DRY)(8 IN)
CY 950.000 $130.000 $100.000 $100.000 $60.000 $263.000
STR STEEL (MISC NON - BRIDGE)
LB 20,431.000 $4.500 $4.000 $5.000 $5.000 $3.820
GABIONS (3' X 3')(GALV)
CY 515.000 $250.000 $250.000 $315.000 $100.000 $400.000
INLET (COMPL)(TY H)
EA 1.000 $5,000.000 $12,920.000 $13,355.000 $15,000.000 $11,000.000
MANH (COMPL)(TY A)
EA 1.000 $4,700.000 $22,671.000 $18,620.000 $20,000.000 $19,500.000
PIPE (PVC) (SCH 40) (2 IN)
LF 214.000 $18.000 $41.300 $30.000 $50.000 $36.000
PIPE (MISC) (18 IN)
LF 10.000 $100.000 $1,090.000 $251.000 $100.000 $950.000
MOBILIZATION
LS 1.000 $165,000.000 $275,000.000 $282,250.000 $300,000.000 $55,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $4,500.000 $8,500.000 $5,110.000 $3,000.000 $10,550.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 110.000 $30.000 $1.000 $23.000 $20.000 $31.000
CONSTRUCTION EXITS (REMOVE)
SY 110.000 $10.000 $1.000 $9.000 $10.000 $10.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 647.000 $4.550 $0.100 $3.250 $8.000 $5.700
BIODEG EROSN CONT LOGS (REMOVE)
LF 647.000 $1.250 $0.100 $0.750 $1.000 $1.410
CONC CURB (LANDSCAPE)
LF 7,752.000 $12.000 $21.700 $15.000 $10.000 $12.800
CONDT (PVC) (SCH 40) (1")
LF 2,597.000 $15.750 $13.750 $5.000 $5.000 $12.500
CONDT (PVC) (SCH 40) (1 1/2")
LF 362.000 $8.000 $14.500 $5.000 $8.000 $13.560
CONDT (PVC) (SCH 40) (2") (BORE)
LF 338.000 $20.000 $36.000 $22.000 $20.000 $28.600
CONDT (PVC) (SCH 40) (6") (BORE)
LF 932.000 $30.000 $33.000 $25.000 $40.000 $52.000
ELEC CONDR (NO.12) INSULATED
LF 790.000 $1.670 $1.600 $1.500 $5.000 $1.410
ELEC CONDR (NO.10) INSULATED
LF 2,730.000 $1.960 $1.600 $1.600 $4.000 $1.500
ELEC CONDR (NO.8) BARE
LF 30.000 $1.130 $1.950 $1.700 $10.000 $1.620
ELEC CONDR (NO.8) INSULATED
LF 1,570.000 $1.370 $2.000 $1.800 $5.000 $1.670
ELEC CONDR (NO.6) INSULATED
LF 3,559.000 $1.230 $2.150 $1.900 $4.000 $1.990
ELEC CONDR (NO.2/0) BARE
LF 800.000 $2.280 $6.000 $5.350 $5.000 $4.210
GROUND BOX TY B (122322)W/APRON
EA 5.000 $1,000.000 $2,150.000 $2,000.000 $500.000 $1,555.060
ELC SRV TY A 240/480 100(SS)SS(E)SF(U)
EA 1.000 $6,500.000 $12,000.000 $16,000.000 $10,000.000 $10,300.000
ELC SRV TY A 240/480 200(SS)SS(E)SP(U)
EA 1.000 $6,500.000 $10,700.000 $13,900.000 $12,000.000 $10,500.000
INSTALL LED DECORATIVE ILLUM ASSEMBLY
EA 8.000 $11,000.000 $5,000.000 $5,000.000 $3,000.000 $6,750.000
PRE-FILTRATION UNIT
EA 1.000 $22,400.000 $32,320.500 $25,285.000 $30,000.000 $27,500.000
GATE VALVE (18")
EA 1.000 $23,000.000 $33,400.750 $30,285.000 $30,000.000 $29,000.000
VALVE BOX
EA 1.000 $3,000.000 $3,393.000 $2,415.000 $5,000.000 $2,900.000
DE-WATER SLEEVE AND COVER
EA 1.000 $2,600.000 $6,351.000 $5,000.000 $7,000.000 $5,500.000
DE-WATERING PUMP AND APPURTENANCES
EA 1.000 $5,300.000 $12,564.250 $9,055.000 $7,000.000 $5,700.000
SUMP PUMP AND APPURTENANCES
EA 2.000 $7,900.000 $6,568.500 $4,890.000 $10,000.000 $10,700.000
CISTERN (42,000 GAL) AND APPURTENANCES
EA 1.000 $44,500.000 $63,125.750 $69,175.000 $70,000.000 $54,000.000
IRRIG SYSTEM PUMP AND APPURTENANCES
EA 1.000 $29,000.000 $43,492.750 $42,120.000 $35,000.000 $37,000.000
PUMP SYSTEM CONTROLLERS AND CABINET
EA 1.000 $27,000.000 $34,365.000 $31,280.000 $30,000.000 $29,500.000
Totals: $2,311,456.820 $2,750,000.000 $2,855,000.000 $3,182,857.000 $3,474,472.120