Show Job Controls
Bid Cobra

COLEMAN SAN SABA (0923-08-030)

Items: 40

County: COLEMAN
Length: 0.0210 MILES
Highway: SAN SABA
District: BROWNWOOD
Control Number: 0923-08-030
DBE Goal: 6.5%
Project: BR 2024(070)
Guaranty: $37,000.00
Time: 150 WORKING DAYS
Engineer's Estimate: $1,861,061.00
Date: 10/01/2024 (1 year ago)
Contract Number: 10243022
Type: BRIDGE REPLACEMENT
Project ID: A00135430
Project Description: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$1,861,061.00
$1,621,100.00
Over/Under Est: -12.89% -$239,961.00
Over/Under Est: -8.17% -$152,051.00
Amt Left: 5.42% $87,910.00
$1,897,442.50
Over/Under Est: 1.95% $36,381.50
Amt Left: 17.05% $276,342.50
Delta: -11.03% -$188,432.50
Over/Under Est: 3.47% $64,506.57
Amt Left: 18.78% $304,467.57
Delta: -1.48% -$28,125.07
$2,246,130.00
Over/Under Est: 20.69% $385,069.00
Amt Left: 38.56% $625,030.00
Delta: -16.65% -$320,562.43
$2,296,108.00
Over/Under Est: 23.38% $435,047.00
Amt Left: 41.64% $675,008.00
Delta: -2.23% -$49,978.00
Subcontractor Percentage Amount
LONE STAR PAVING COMPANY 9.76% $164,175.08
MORRIS COUNTY CONTRACTORS, L.L.C. 5.67% $95,376.30
WOLFE CONSTRUCTION GROUP, INCORPORATED 1.21% $20,353.67
FC TRAFFIC CONTROL, INC. 0.84% $14,129.82
Total: 17.48% $294,034.87

Bid Items & Bid Tabulations

40 Total 0 of 40
COLEMAN  |  SAN SABA  |  BROWNWOOD  |  0923-08-030  |  10/01/2024  |  $1,861,061.00  |  BR 2024(070)  |  BRIDGE REPL  |  150 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SKYLINE BRIDGE LLC
DELGADO'S CONTRACTORS, LLC
CK NEWBERRY, LLC
PROJECT ALLIED RESOURCES, LLC
STX CIVIL
FNH CONSTRUCTION, LLC
PREPARING ROW
STA 7.600 $3,000.000 $3,650.000 $1,000.000 $5,000.000 $3,010.000 $6,000.000 $18,500.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 49.000 $45.000 $65.000 $20.000 $50.000 $24.600 $20.000 $10.000
REMOV CONC (CURB OR CURB & GUTTER)
LF 252.000 $30.000 $21.000 $15.000 $15.000 $18.400 $20.000 $30.000
REMOV CONC (RETAINING WALLS)
SY 45.000 $150.000 $100.000 $20.000 $300.000 $106.000 $50.000 $100.000
EXCAV (ROADWAY)
CY 1,874.000 $30.000 $17.000 $35.000 $30.000 $31.700 $50.000 $20.000
EMBANK (FNL)(OC)(TY C)
CY 662.000 $35.000 $40.000 $100.000 $65.000 $34.500 $35.000 $30.000
BROADCAST SEED (TEMP_WARM)
SY 744.000 $1.500 $4.500 $1.000 $1.000 $1.910 $5.000 $4.000
BROADCAST SEED (TEMP_COOL)
SY 744.000 $1.500 $4.500 $1.000 $1.000 $1.950 $5.000 $2.000
BOND FBR MTRX SEED (PERM)(RURAL)(CLAY)
SY 1,485.000 $1.500 $6.000 $1.000 $3.500 $4.750 $2.000 $2.000
VEGETATIVE WATERING
TGL 20.000 $50.000 $1.000 $60.000 $50.000 $95.000 $60.000 $50.000
FL BS (CMP IN PLC)(TY A GR 4)(FNAL POS)
CY 493.000 $140.000 $82.000 $100.000 $125.000 $86.000 $95.000 $100.000
PRIME COAT (MC-30)
GAL 904.000 $15.000 $17.000 $15.000 $10.000 $7.100 $20.000 $10.000
ASPH (AC-20-5TR)
GAL 1,267.000 $15.000 $15.000 $15.000 $8.000 $7.300 $20.000 $10.000
AGGR (TY-PB, GR-4)
CY 32.000 $850.000 $700.000 $800.000 $750.000 $281.000 $800.000 $350.000
SP MIXES SP-C SAC-B PG76-22
TON 341.000 $275.000 $400.000 $350.000 $250.000 $258.000 $400.000 $400.000
CEM STABIL BKFL
CY 273.000 $260.000 $347.000 $275.000 $200.000 $324.000 $155.000 $250.000
TRENCH EXCAVATION PROTECTION
LF 229.000 $26.000 $21.000 $25.000 $35.000 $38.400 $15.000 $10.000
RIPRAP (STONE COMMON)(GROUT)(12 IN)
CY 173.000 $185.000 $183.000 $300.000 $300.000 $311.000 $300.000 $185.000
RAIL (TY C1W)
LF 363.000 $350.000 $343.000 $250.000 $350.000 $286.000 $325.000 $200.000
CONC BOX CULV (9 FT X 4 FT)
LF 560.000 $1,000.000 $750.000 $1,000.000 $800.000 $1,300.000 $1,500.000 $1,500.000
RC PIPE (CL III)(24 IN)
LF 100.000 $175.000 $150.000 $125.000 $125.000 $214.000 $100.000 $125.000
INLET (COMPL)(PCO)(5FT)(BOTH)
EA 1.000 $8,000.000 $8,000.000 $4,500.000 $13,000.000 $14,200.000 $10,000.000 $15,000.000
WINGWALL (FW - S) (HW=6 FT)
EA 1.000 $26,000.000 $20,000.000 $22,000.000 $30,000.000 $10,300.000 $35,000.000 $35,000.000
WINGWALL (PW - 1) (HW=6 FT)
EA 5.000 $28,000.000 $21,000.000 $26,000.000 $35,000.000 $20,700.000 $30,000.000 $40,000.000
REMOV STR (PIPE)
LF 43.000 $49.500 $50.000 $25.000 $100.000 $27.500 $15.000 $50.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 3.000 $35,000.000 $12,500.000 $10,000.000 $50,000.000 $30,500.000 $45,000.000 $40,000.000
MOBILIZATION
LS 1.000 $165,700.000 $150,000.000 $125,000.000 $180,000.000 $192,000.000 $185,000.000 $215,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $5,000.000 $3,400.000 $2,500.000 $12,000.000 $7,370.000 $2,500.000 $8,500.000
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 240.000 $80.000 $40.000 $75.000 $50.000 $66.000 $100.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 240.000 $18.000 $11.000 $7.000 $25.000 $17.200 $15.000 $15.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 914.000 $4.500 $4.000 $7.000 $6.000 $5.800 $8.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 914.000 $1.500 $2.000 $1.000 $3.000 $1.670 $2.000 $2.000
CONC CURB (TY II)
LF 1,078.000 $45.000 $89.000 $50.000 $35.000 $19.100 $55.000 $55.000
DRIVEWAYS (CONC)
SY 93.000 $144.000 $200.000 $125.000 $225.000 $135.000 $125.000 $125.000
CONC SIDEWALKS (4")
SY 618.000 $110.000 $85.000 $100.000 $80.000 $113.000 $95.000 $75.000
CURB RAMPS (TY 10)
EA 3.000 $2,700.000 $6,500.000 $3,000.000 $6,000.000 $4,630.000 $3,500.000 $3,250.000
WIRE FENCE (TY A)
LF 62.000 $37.760 $30.000 $40.000 $55.000 $37.700 $50.000 $10.000
WIRE FENCE (TY C)
LF 196.000 $31.030 $25.000 $50.000 $45.000 $30.900 $50.000 $20.000
WIRE FENCE (REMOVE)
LF 182.000 $5.000 $8.000 $25.000 $15.000 $7.700 $15.000 $5.000
STONE MASONRY (ROCK WALL)
SF 218.000 $150.000 $75.000 $100.000 $60.000 $28.600 $70.000 $85.000
Totals: $1,861,061.000 $1,621,100.000 $1,709,010.000 $1,897,442.500 $1,925,567.570 $2,246,130.000 $2,296,108.000