COLEMAN COUNTY ROAD 108 (0923-08-028)

Items: 43

County: COLEMAN
Length: 0.1000 MILES
Highway: COUNTY ROAD 108
District: BROWNWOOD
Control Number: 0923-08-028
DBE Goal: 5.0%
Project: BR 2023(710)
Guaranty: $25,000.00
Time: 141 WORKING DAYS
Engineer's Estimate: $1,244,007.20
Date: 10/02/2024 (1 year ago)
Contract Number: 10243219
Type: BRIDGE REPLACEMENT
Project ID: A00064134
Project Description: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$1,244,007.20
$1,097,424.00
Over/Under Est: -11.78% -$146,583.20
$1,148,028.00
Over/Under Est: -7.72% -$95,979.20
Amt Left: 4.61% $50,604.00
$1,305,357.00
Over/Under Est: 4.93% $61,349.80
Amt Left: 18.95% $207,933.00
Delta: -13.70% -$157,329.00
Over/Under Est: 88.41% $1,099,867.80
Amt Left: 113.58% $1,246,451.00
Delta: -79.56% -$1,038,518.00
Subcontractor Percentage Amount
VINCE CONSTRUCTION LLC 6.38% $70,015.65
BARRICADES UNLIMITED 1.91% $20,960.80
Total: 8.29% $90,976.45

Bid Items & Bid Tabulations

43 Total 0 of 43
COLEMAN  |  COUNTY ROAD 108  |  BROWNWOOD  |  0923-08-028  |  10/02/2024  |  $1,244,007.20  |  BR 2023(710)  |  BRIDGE REPL  |  141 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DELGADO'S CONTRACTORS, LLC
SKYLINE BRIDGE LLC
STX CIVIL
HODGES AND SON CONSTRUCTION COMPANY, INC.
PREPARING ROW
STA 8.300 $2,500.000 $1,000.000 $3,250.000 $3,000.000 $10,000.000
EXCAV (ROADWAY)
CY 128.000 $30.000 $35.000 $20.000 $40.000 $120.000
EXCAV (CHANNEL)
CY 490.000 $35.000 $40.000 $18.000 $30.000 $65.000
EMBANK (FNL)(OC)(TY C)
CY 257.000 $35.000 $80.000 $53.000 $35.000 $150.000
BROADCAST SEED (PERM_RURAL_SAND)
SY 1,988.000 $1.500 $1.000 $1.250 $3.500 $4.000
BROADCAST SEED (PERM_RURAL_CLAY)
SY 2,966.000 $1.500 $1.000 $1.250 $2.000 $4.000
BROADCAST SEED (TEMP_WARM)
SY 2,477.000 $1.000 $1.000 $1.250 $2.000 $2.000
BROADCAST SEED (TEMP_COOL)
SY 2,477.000 $1.000 $1.000 $1.250 $2.000 $2.000
VEGETATIVE WATERING
TGL 51.000 $75.000 $60.000 $1.000 $50.000 $1.000
SOIL RET BLKT(SL_STEEP_CLAY_LONG_SPRY)
SY 4,954.000 $1.500 $2.000 $2.000 $5.000 $4.000
FL BS (CMP IN PLC)(TY A GR 4)(FNAL POS)
CY 385.000 $140.000 $90.000 $113.000 $125.000 $150.000
CEM STABIL BKFL
CY 194.000 $260.000 $250.000 $300.000 $300.000 $300.000
TEMPORARY SPL SHORING
SF 280.000 $50.000 $45.000 $61.000 $25.000 $20.000
DRILL SHAFT (36 IN)
LF 240.000 $330.000 $325.000 $500.000 $465.000 $285.000
CL C CONC (ABUT)
CY 38.000 $1,650.000 $1,500.000 $1,172.000 $1,900.000 $3,000.000
REINF CONC SLAB
SF 1,950.000 $35.000 $28.000 $33.000 $23.000 $50.000
PRESTR CONC GIRDER (TX28)
LF 298.000 $230.000 $250.000 $349.000 $265.000 $500.000
RIPRAP (CONC)(4 IN)
CY 10.000 $1,200.000 $650.000 $1,010.000 $700.000 $900.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 54.000 $185.000 $210.000 $184.000 $185.000 $300.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 603.000 $210.000 $200.000 $176.000 $185.000 $250.000
RAIL (TY T223)
LF 344.000 $160.000 $200.000 $154.000 $200.000 $180.000
ARMOR JOINT (SEALED)
LF 50.000 $240.000 $230.000 $194.000 $190.000 $200.000
CONC BOX CULV (8 FT X 7 FT)
LF 130.000 $1,050.000 $1,000.000 $900.000 $1,500.000 $1,800.000
WINGWALL (PW - 1) (HW=8 FT)
EA 2.000 $42,000.000 $27,500.000 $28,613.000 $35,000.000 $130,000.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 2.000 $30,000.000 $20,000.000 $14,525.000 $20,000.000 $210,000.000
MOBILIZATION
LS 1.000 $113,000.000 $80,000.000 $100,000.000 $107,000.000 $200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $4,500.000 $3,250.000 $2,800.000 $3,000.000 $14,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 130.000 $65.000 $75.000 $40.000 $100.000 $1.000
ROCK FILTER DAMS (REMOVE)
LF 130.000 $20.000 $5.000 $10.000 $10.000 $1.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 944.000 $5.300 $7.000 $4.000 $6.000 $1.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 944.000 $2.000 $1.000 $2.000 $2.000 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 526.000 $8.000 $15.000 $10.000 $10.000 $5.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 526.000 $4.000 $1.000 $4.000 $2.000 $1.000
MTL W-BEAM GD FEN (STEEL POST)
LF 175.000 $38.000 $40.000 $35.000 $40.000 $28.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $3,000.000 $2,500.000 $2,500.000 $3,400.000 $2,000.000
MTL BEAM GD FEN TRANS (TL2)
EA 3.000 $2,000.000 $1,500.000 $1,700.000 $3,000.000 $2,000.000
GUARDRAIL END TREATMENT (INSTALL)
EA 7.000 $3,500.000 $3,500.000 $3,600.000 $3,700.000 $4,000.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL2)
EA 1.000 $25,000.000 $21,000.000 $21,000.000 $30,000.000 $20,000.000
WIRE FENCE (TY C)
LF 160.000 $40.000 $25.000 $22.000 $50.000 $25.000
REMOVE SM RD SN SUP&AM
EA 2.000 $125.000 $250.000 $200.000 $1,100.000 $50.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 6.000 $48.000 $50.000 $47.000 $45.000 $50.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 12.000 $50.000 $50.000 $47.000 $50.000 $50.000
TIP TESTING(DRILL SHAFT)
EA 2.000 $8,500.000 $5,000.000 $6,500.000 $5,000.000 $5,000.000
Totals: $1,244,007.200 $1,097,424.000 $1,148,028.000 $1,305,357.000 $2,343,875.000