PREPARING ROW
|
STA
|
129.000
|
$130.000
|
$310.000
|
$380.000
|
$1,582.540
|
|
|
PREP ROW (TREE)(24"-30"DIA)
|
EA
|
3.000
|
$1,200.000
|
$2,000.000
|
$2,000.000
|
$1,575.050
|
|
|
REMOVING CONC (CURB)
|
LF
|
186.000
|
$12.000
|
$15.000
|
$15.000
|
$10.600
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
10,935.000
|
$12.000
|
$14.000
|
$24.000
|
$7.640
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
4,300.000
|
$15.000
|
$11.000
|
$19.000
|
$7.770
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
AC
|
10.500
|
$835.000
|
$500.000
|
$480.000
|
$711.020
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
AC
|
5.250
|
$685.000
|
$500.000
|
$440.000
|
$450.010
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
AC
|
5.250
|
$685.000
|
$500.000
|
$440.000
|
$450.010
|
|
|
PROOF ROLLING
|
HR
|
4.000
|
$100.000
|
$100.000
|
$200.000
|
$73.470
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
14,219.000
|
$45.000
|
$45.000
|
$61.000
|
$63.250
|
|
|
PRIME COAT (RC-250)
|
GAL
|
8,074.000
|
$5.000
|
$5.000
|
$6.000
|
$5.040
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
29,354.000
|
$5.000
|
$5.000
|
$4.450
|
$4.170
|
|
|
AGGR(TY-B GR-5 SAC-B)
|
CY
|
294.000
|
$150.000
|
$120.000
|
$190.000
|
$131.660
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
668.000
|
$100.000
|
$120.000
|
$165.000
|
$176.640
|
|
|
PLAN & TEXT CONC PAV(0" TO 1")
|
SY
|
22,532.000
|
$0.750
|
$1.000
|
$1.000
|
$2.220
|
|
|
PLAN & TEXT CONC PAV(0" TO 1-1/2")
|
SY
|
889.000
|
$2.000
|
$3.000
|
$2.000
|
$3.550
|
|
|
PLAN & TEXT ASPH CONC PAV (1")
|
SY
|
33,798.000
|
$0.750
|
$1.100
|
$1.000
|
$2.320
|
|
|
CL C CONC (CULV)
|
CY
|
3.800
|
$2,000.000
|
$1,400.000
|
$4,400.000
|
$1,406.290
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
12.000
|
$1,200.000
|
$560.000
|
$1,000.000
|
$562.520
|
|
|
RETROFIT RAIL (TY T631)
|
LF
|
430.000
|
$80.000
|
$90.000
|
$105.000
|
$10.130
|
|
|
CMP AR (GAL STL DES 3)
|
LF
|
166.000
|
$110.000
|
$125.000
|
$210.000
|
$123.750
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
|
EA
|
4.000
|
$5,500.000
|
$8,400.000
|
$9,500.000
|
$8,437.750
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
2.000
|
$8,500.000
|
$10,650.000
|
$11,000.000
|
$10,687.810
|
|
|
SET (TY I)(S= 7 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
2.000
|
$10,000.000
|
$11,760.000
|
$15,500.000
|
$11,812.850
|
|
|
SET (TY II) (42 IN) (CMP) (4: 1) (C)
|
EA
|
2.000
|
$3,500.000
|
$7,850.000
|
$4,700.000
|
$7,875.230
|
|
|
SET (TY II) (DES 3) (CMP) (6: 1) (P)
|
EA
|
12.000
|
$2,000.000
|
$3,375.000
|
$2,650.000
|
$3,375.100
|
|
|
SET (TY II) (DES 4) (CMP) (4: 1) (C)
|
EA
|
2.000
|
$3,000.000
|
$4,000.000
|
$3,650.000
|
$3,937.620
|
|
|
REMOV STR (PIPE)
|
EA
|
6.000
|
$400.000
|
$560.000
|
$1,550.000
|
$562.520
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$280,000.000
|
$195,000.000
|
$120,000.000
|
$398,285.900
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$5,000.000
|
$3,000.000
|
$6,250.000
|
$18,228.440
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
80.000
|
$15.000
|
$10.000
|
$15.000
|
$12.960
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,200.000
|
$5.000
|
$5.000
|
$4.000
|
$2.590
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,200.000
|
$1.000
|
$2.000
|
$1.000
|
$1.130
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,400.000
|
$7.000
|
$6.000
|
$5.000
|
$2.250
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,400.000
|
$1.000
|
$2.000
|
$1.000
|
$0.900
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1) (6:1)
|
LF
|
80.000
|
$40.000
|
$65.000
|
$50.000
|
$67.500
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
450.000
|
$65.000
|
$100.000
|
$95.000
|
$101.250
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
1,350.000
|
$6.000
|
$18.000
|
$17.000
|
$16.880
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
450.000
|
$15.000
|
$25.000
|
$30.000
|
$25.310
|
|
|
CONC CURB (MOD) (TYPE I)
|
LF
|
186.000
|
$65.000
|
$56.000
|
$52.500
|
$56.250
|
|
|
INTERSECTIONS (ACP)
|
SY
|
372.000
|
$50.000
|
$45.000
|
$60.000
|
$95.680
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
629.000
|
$30.000
|
$30.000
|
$30.000
|
$44.530
|
|
|
TURNOUTS (ACP)
|
SY
|
15.000
|
$60.000
|
$75.000
|
$60.000
|
$375.800
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
25,748.000
|
$0.400
|
$0.370
|
$0.300
|
$0.190
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
12,874.000
|
$0.300
|
$0.370
|
$0.300
|
$0.270
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
800.000
|
$31.000
|
$39.000
|
$37.000
|
$41.630
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,300.000
|
$4.000
|
$2.250
|
$3.000
|
$3.380
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$2,500.000
|
$3,415.000
|
$3,800.000
|
$3,937.620
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
6.000
|
$2,000.000
|
$2,750.000
|
$2,650.000
|
$2,812.580
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,000.000
|
$1,100.000
|
$1,100.000
|
$1,125.030
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$10,000.000
|
$7,700.000
|
$7,000.000
|
$7,875.230
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 2
|
EA
|
1.000
|
$350.000
|
$540.000
|
$600.000
|
$483.770
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$625.000
|
$775.000
|
$1,125.000
|
$951.780
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
3.000
|
$695.000
|
$960.000
|
$1,200.000
|
$1,121.660
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$760.000
|
$1,350.000
|
$1,550.000
|
$1,562.670
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
10.000
|
$340.000
|
$540.000
|
$805.000
|
$714.400
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
9.000
|
$430.000
|
$640.000
|
$900.000
|
$748.150
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
16.000
|
$115.000
|
$22.500
|
$110.000
|
$197.320
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
16.000
|
$30.000
|
$22.000
|
$30.000
|
$20.250
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
36.000
|
$30.000
|
$25.750
|
$110.000
|
$39.380
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
|
EA
|
12.000
|
$60.000
|
$100.000
|
$100.000
|
$101.250
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
24,000.000
|
$0.500
|
$0.340
|
$0.330
|
$0.340
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
24,000.000
|
$0.500
|
$0.390
|
$0.380
|
$0.390
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
300.000
|
$3.000
|
$5.120
|
$5.000
|
$5.230
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
2,488.000
|
$1.500
|
$1.750
|
$2.000
|
$1.140
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
738.000
|
$0.600
|
$1.000
|
$1.000
|
$1.010
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
34.000
|
$11.000
|
$22.000
|
$22.000
|
$22.500
|
|
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
|
EA
|
4.000
|
$400.000
|
$880.000
|
$880.000
|
$900.030
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
4,172.000
|
$0.500
|
$0.450
|
$0.450
|
$0.460
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
25,544.000
|
$0.600
|
$0.400
|
$0.400
|
$0.420
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
25,848.000
|
$0.600
|
$0.400
|
$0.400
|
$0.410
|
|
REFL PAV MRKR TY I-C
|
EA
|
210.000
|
$5.000
|
$5.120
|
$5.000
|
$5.230
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
324.000
|
$5.000
|
$5.120
|
$5.000
|
$5.230
|
|
|
SP MIXES SP-C SAC-B PG76-22
|
TON
|
8,654.000
|
$100.000
|
$122.660
|
$141.000
|
$127.850
|
|
|
BONDING COURSE
|
GAL
|
5,398.000
|
$2.000
|
$3.500
|
$4.000
|
$4.490
|
|
|
TMA (STATIONARY)
|
DAY
|
100.000
|
$261.000
|
$250.000
|
$300.000
|
$328.150
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
320.000
|
$65.000
|
$70.000
|
$60.000
|
$63.600
|
|
Totals: |
$2,950,129.900
|
$3,177,408.860
|
$3,768,855.100
|
$4,041,742.247
|