Show Job Controls
Bid Cobra

COKE CR (0907-14-010)

Items: 40

County: COKE
Length: N/A
Highway: CR
District: SAN ANGELO
Control Number: 0907-14-010
DBE Goal: N/A
Project: BR 2022(184)
Guaranty: N/A
Time: 84 WORKING DAYS
Engineer's Estimate: $554,581.28
Date: 10/07/2022 (3 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$554,581.28
$659,587.00
Over/Under Est: 18.93% $105,005.72
Over/Under Est: 36.71% $203,578.72
Amt Left: 14.94% $98,573.00
Over/Under Est: 40.19% $222,908.72
Amt Left: 17.88% $117,903.00
Delta: -2.55% -$19,330.00

Bid Items & Bid Tabulations

40 Total 0 of 40
COKE  |  CR  |  SAN ANGELO  |  0907-14-010  |  10/07/2022  |  $554,581.28  |  BR 2022(184)  |  BRIDGE REPL  |  84 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DELGADO'S CONTRACTORS, LLC
HODGES AND SON CONSTRUCTION COMPANY, INC.
BLACKSTONE CONCRETE VENTURES, LLC
PREPARING ROW
STA 5.900 $2,500.000 $2,000.000 $4,200.000 $625.000
REMOVING STAB BASE & ASPH PAV (4" - 6")
SY 900.000 $8.000 $10.000 $10.000 $16.000
EXCAVATION (ROADWAY)
CY 325.000 $10.000 $10.000 $30.000 $35.000
EXCAVATION (CHANNEL)
CY 475.000 $15.000 $10.000 $30.000 $45.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 62.000 $25.000 $30.000 $100.000 $70.000
FURNISHING AND PLACING TOPSOIL (4")
SY 3,402.000 $2.000 $3.000 $3.000 $8.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 3,402.000 $0.250 $1.000 $2.000 $2.000
BROADCAST SEED (TEMP) (WARM)
SY 1,701.000 $0.150 $1.000 $2.000 $2.000
BROADCAST SEED (TEMP) (COOL)
SY 1,701.000 $0.150 $1.000 $2.000 $2.000
VEGETATIVE WATERING
MG 70.000 $20.000 $40.000 $1.000 $36.000
PROOF ROLLING
HR 6.000 $125.000 $100.000 $1.000 $150.000
FL BS (CMP IN PLACE)(TY A GR 1-2)(8")
SY 1,504.000 $15.000 $33.000 $35.000 $18.000
CEM STABIL BKFL
CY 26.000 $85.000 $225.000 $300.000 $450.000
DRILL SHAFT (24 IN)
LF 204.000 $165.000 $300.000 $230.000 $345.000
CL C CONC (ABUT)
CY 18.400 $1,250.000 $1,100.000 $2,000.000 $2,400.000
CL C CONC (CAP)
CY 6.600 $1,275.000 $1,200.000 $2,500.000 $2,200.000
CL C CONC (COLUMN)
CY 3.500 $1,000.000 $1,200.000 $2,500.000 $2,050.000
REINF CONC SLAB
SF 2,600.000 $20.000 $21.000 $25.000 $35.000
PRESTR CONC SLAB BEAM (5SB12)
LF 495.000 $210.000 $252.000 $330.000 $355.000
RIPRAP (CONC)(5 IN)
CY 18.000 $500.000 $550.000 $600.000 $375.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 246.000 $190.000 $150.000 $175.000 $100.000
RIPRAP (MOW STRIP)(4 IN)
CY 24.000 $600.000 $550.000 $600.000 $110.000
RAIL (TY T223)
LF 224.000 $125.000 $100.000 $150.000 $180.000
ARMOR JOINT (SEALED)
LF 52.000 $140.000 $150.000 $150.000 $145.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $26,000.000 $45,000.000 $30,000.000 $80,000.000
MOBILIZATION
LS 1.000 $50,416.480 $55,000.000 $70,000.000 $16,200.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $9,000.000 $10,000.000 $5,000.000 $1,725.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 120.000 $30.000 $35.000 $1.000 $27.000
ROCK FILTER DAMS (REMOVE)
LF 120.000 $10.000 $5.000 $1.000 $15.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 185.000 $7.000 $7.000 $5.000 $9.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 185.000 $2.000 $1.000 $1.000 $3.500
DRIVEWAYS (BASE)
SY 47.000 $35.000 $55.000 $70.000 $33.000
MTL W-BEAM GD FEN (STEEL POST)
LF 100.000 $30.000 $40.000 $35.000 $80.000
MTL BEAM GD FEN TRANS (TL2)
EA 4.000 $1,300.000 $2,000.000 $2,000.000 $1,600.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,500.000 $3,500.000 $3,500.000 $3,300.000
WIRE FENCE (TY C)
LF 66.000 $15.000 $20.000 $30.000 $48.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 4.000 $500.000 $750.000 $1,200.000 $1,450.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 12.000 $30.000 $25.000 $30.000 $195.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 2.000 $100.000 $25.000 $50.000 $350.000
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 1.000 $400.000 $400.000 $500.000 $1,150.000
Totals: $554,581.280 $659,587.000 $758,160.000 $777,490.000