Show Job Controls
Bid Cobra

COKE US 277 (0264-05-029)

Items: 181

County: COKE
Length: N/A
Highway: US 277
District: SAN ANGELO
Control Number: 0264-05-029
DBE Goal: N/A
Project: F 2023(774)
Guaranty: N/A
Time: 557 WORKING DAYS
Engineer's Estimate: $36,832,762.55
Date: 06/01/2023 (3 years ago)
Contract Number: N/A
Type: HIGHWAY IMPROVEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$36,832,762.55
$41,866,305.49
Over/Under Est: 13.67% $5,033,542.94
$45,333,300.00
Over/Under Est: 23.08% $8,500,537.45
Amt Left: 8.28% $3,466,994.51
$45,620,464.64
Over/Under Est: 23.86% $8,787,702.09
Amt Left: 8.97% $3,754,159.15
Delta: -0.63% -$287,164.64
Subcontractor Percentage Amount
COPPELL CONSTRUCTION CO., INC. 18.66% $7,816,672.41
J & M CONTRACTING, COMPANY 11.43% $4,788,026.03
HJC FARMS, INC. 1.75% $733,074.85
M & D FOUNDATION DRILLING INDUSTRIES, INC. 1.10% $460,789.91
DOUBLE A CONTRACTING, L.P. 0.74% $309,985.94
REXCON ENTERPRISES, LLC 0.54% $226,205.95
CONTRACTORS SERVICE, LTD. 0.47% $196,882.96
CHEROKEE SERVICES 0.07% $29,322.99
PROFESSIONAL TRAFFIC CONTROL LLC 0.07% $29,322.99
TORO BRAVO CONSTRUCTION, LLC 0.04% $16,756.00
SK CONCRETE SERVICES LLC 0.03% $12,567.00
S & S BRIDGE PAINTING, INC. 0.02% $8,378.00
Total: 34.92% $14,627,985.03

Bid Items & Bid Tabulations

181 Total 0 of 181
COKE  |  US 277  |  SAN ANGELO  |  0264-05-029  |  06/01/2023  |  $36,832,762.55  |  F 2023(774)  |  HWY IMPRV  |  557 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
J. H. STRAIN & SONS, INC.
WEBBER, LLC
GILVIN-TERRILL, LTD.
PREPARING ROW
STA 731.000 $200.000 $2,000.000 $6,100.000 $500.000
PREPARING ROW (TREE) (6" TO 24" DIA)
EA 37.000 $2,000.000 $1,500.000 $1,500.000 $2,000.000
PREPARING ROW(TREE)(24" TO 36" DIA.)
EA 4.000 $2,500.000 $3,000.000 $2,500.000 $1,750.000
REMOVING CONC (RIPRAP)
SY 503.000 $65.000 $40.000 $46.250 $21.480
REMOVING CONC (DRIVEWAYS)
SY 128.000 $50.000 $30.000 $24.900 $25.000
REMOVING STAB BASE & ASPH PAV (4" - 6")
SY 5,963.000 $8.000 $14.750 $4.050 $20.000
REMOVE STAB BASE & ASPH PAV (12"-22")
SY 18,876.000 $18.000 $12.000 $3.850 $20.000
EXCAVATION (ROADWAY)
CY 22,029.000 $25.000 $23.000 $14.800 $20.000
EXCAVATION (CHANNEL)
CY 559.740 $30.000 $50.000 $60.000 $20.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 25,913.000 $20.000 $25.000 $28.100 $20.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 6,991.000 $50.000 $40.000 $65.000 $75.000
BACKFILL (TY A OR B)
STA 696.000 $230.000 $300.000 $255.000 $300.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 298,177.000 $0.400 $0.300 $0.200 $0.200
DRILL SEED (TEMP)(WARM OR COOL)
SY 298,177.000 $0.400 $0.300 $0.200 $0.200
PROOF ROLLING
HR 99.000 $125.000 $200.000 $162.000 $250.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 17,874.000 $110.000 $70.000 $80.950 $65.000
LIME (HYDRATED LIME (SLURRY))
TON 1,562.000 $230.000 $415.000 $380.000 $400.000
LIME TRT (SUBGRADE)(8")
SY 74,399.000 $7.000 $7.000 $11.100 $10.000
PRIME COAT (MC-30)
GAL 16,087.000 $10.000 $6.000 $7.600 $6.500
ASPH (CRS-2P)
GAL 97,065.000 $5.500 $6.500 $7.000 $5.000
AGGR(TY-PB GR-3 SAC-B)
CY 847.000 $225.000 $200.000 $311.000 $160.000
AGGR(TY-PB GR-4 SAC-B)
CY 3,494.000 $150.000 $200.000 $273.000 $160.000
ASPH (AC-20-5TR OR AC-20XP)
GAL 97,065.000 $5.500 $6.000 $7.500 $5.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 9,723.000 $85.000 $64.000 $126.000 $80.000
PLANE ASPH CONC PAV(0" TO 2")
SY 34,798.000 $2.000 $3.000 $1.500 $3.500
PLANE ASPH CONC PAV(0" TO 3")
SY 8,067.000 $5.000 $5.200 $4.850 $4.000
PLANE ASPH CONC PAV (2")
SY 24,821.000 $4.000 $2.700 $3.150 $3.000
CEM STABIL BKFL
CY 442.000 $300.000 $320.000 $202.000 $200.000
CUT & RESTORING PAV
SY 10.070 $200.000 $220.000 $160.000 $250.000
CUT & RESTORE ASPH PAVING
SY 144.670 $200.000 $220.000 $160.000 $250.000
CUT AND RESTORE PAV (FLEX BASE)
SY 17.580 $60.000 $55.000 $160.000 $100.000
FLOWABLE BACKFILL
CY 81.680 $400.000 $330.000 $360.000 $300.000
TEMPORARY SPL SHORING
SF 11,973.000 $45.000 $77.000 $35.500 $75.000
DRILL SHAFT (18 IN)
LF 115.000 $175.000 $165.000 $100.000 $160.000
DRILL SHAFT (36 IN)
LF 1,650.000 $450.000 $320.000 $250.000 $310.000
DRILL SHAFT (42 IN)
LF 400.000 $500.000 $440.000 $350.000 $400.000
CL B CONC (FLUME)
CY 35.000 $860.000 $1,000.000 $1,000.000 $2,000.000
CL C CONC (ABUT)
CY 78.500 $1,400.000 $1,540.000 $1,590.000 $2,000.000
CL C CONC (CAP)
CY 177.800 $1,600.000 $1,430.000 $1,690.000 $2,000.000
CL C CONC (COLUMN)
CY 109.600 $1,600.000 $1,914.000 $1,700.000 $2,000.000
CL C CONC (RAIL FOUNDATION)
CY 5.100 $1,000.000 $1,200.000 $1,860.000 $2,000.000
REINF CONC SLAB
SF 54,230.000 $25.000 $30.800 $31.400 $32.500
APPROACH SLAB
CY 90.000 $900.000 $1,067.000 $606.000 $2,000.000
RETAINING WALL (MSE)
SF 6,897.000 $70.000 $139.500 $50.250 $75.000
RETAINING WALL (TEMP WALL)
SF 956.000 $30.000 $50.000 $1.000 $70.000
PRESTR CONC GIRDER (TX54)
LF 6,517.000 $230.000 $244.200 $195.000 $250.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 247.250 $250.000 $264.000 $225.000 $225.000
RIPRAP (CONC)(5 IN)
CY 30.800 $650.000 $1,050.000 $600.000 $950.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 161.880 $215.000 $160.000 $300.000 $200.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 3,323.000 $200.000 $290.000 $236.000 $300.000
RIPRAP (MOW STRIP)(4 IN)
CY 398.000 $615.000 $745.000 $920.000 $700.000
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 764.000 $25.000 $51.700 $43.000 $50.000
RAIL (TY SSTR)
LF 1,452.400 $100.000 $118.000 $54.500 $85.000
RAIL (TY SSTR) (W/DRAIN SLOTS)
LF 971.000 $100.000 $105.000 $55.000 $100.000
RETROFIT RAIL (TY T222)
LF 1,236.000 $300.000 $330.000 $137.000 $300.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 228.000 $220.000 $247.500 $180.000 $250.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 159.000 $700.000 $770.000 $650.000 $800.000
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
LF 6.000 $735.000 $800.000 $675.000 $800.000
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
LF 8.000 $775.000 $825.000 $725.000 $800.000
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
LF 114.000 $900.000 $990.000 $850.000 $1,000.000
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
LF 89.000 $770.000 $935.000 $900.000 $900.000
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
LF 102.000 $915.000 $1,100.000 $950.000 $1,200.000
CONC BOX CULV (7 FT X 3 FT)(EXTEND)
LF 18.000 $1,300.000 $990.000 $1,200.000 $1,000.000
CONC BOX CULV (8 FT X 6 FT)(EXTEND)
LF 28.000 $940.000 $1,320.000 $1,300.000 $1,500.000
CONC BOX CULV (8 FT X 8 FT)(EXTEND)
LF 54.000 $1,300.000 $1,650.000 $1,500.000 $2,000.000
RC PIPE (CL IV)(18 IN)
LF 37.000 $110.000 $100.000 $100.000 $100.000
WINGWALL (FW - S) (HW=3 FT)
EA 3.000 $9,500.000 $8,250.000 $6,700.000 $10,000.000
WINGWALL (FW - S) (HW=4 FT)
EA 1.000 $7,600.000 $13,750.000 $8,500.000 $15,000.000
WINGWALL (FW - S) (HW=8 FT)
EA 1.000 $20,000.000 $26,400.000 $20,100.000 $50,000.000
WINGWALL (PW - 1) (HW=10 FT)
EA 1.000 $50,000.000 $71,500.000 $39,500.000 $30,000.000
WINGWALL (PW - 1) (HW=4 FT)
EA 1.000 $16,000.000 $27,500.000 $13,200.000 $70,000.000
WINGWALL (PW - 1) (HW=7 FT)
EA 1.000 $30,000.000 $50,000.000 $23,500.000 $30,000.000
WINGWALL (PW - 1) (HW=8 FT)
EA 1.000 $35,000.000 $54,000.000 $27,000.000 $50,000.000
SET (TY I)(S=10 FT)(HW=10 FT)(3:1)(C)
EA 1.000 $21,000.000 $51,700.000 $16,000.000 $50,000.000
SET (TY I)(S=10 FT)(HW=11 FT)(3:1)(C)
EA 1.000 $21,000.000 $54,000.000 $22,000.000 $50,000.000
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
EA 9.000 $8,600.000 $8,800.000 $7,500.000 $10,000.000
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
EA 2.000 $9,200.000 $9,400.000 $8,500.000 $9,000.000
SET (TY I)(S=3 FT)(HW= 5 FT)(4:1)(C)
EA 3.000 $9,700.000 $10,500.000 $11,200.000 $10,000.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
EA 2.000 $8,500.000 $10,500.000 $7,900.000 $10,000.000
SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1) (C)
EA 8.000 $11,200.000 $18,700.000 $11,500.000 $20,000.000
SET (TY I)(S= 5 FT)(HW= 6 FT)(4:1) (C)
EA 18.000 $15,000.000 $21,000.000 $11,800.000 $20,000.000
SET (TY I)(S= 5 FT)(HW= 7 FT)(4:1) (C)
EA 6.000 $18,000.000 $22,000.000 $13,750.000 $20,000.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
EA 9.000 $9,500.000 $18,150.000 $9,500.000 $20,000.000
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C)
EA 1.000 $12,000.000 $19,250.000 $12,100.000 $20,000.000
SET (TY I)(S= 6 FT)(HW= 7 FT)(3:1) (C)
EA 4.000 $13,000.000 $21,000.000 $13,900.000 $20,000.000
SET (TY I)(S= 6 FT)(HW= 7 FT)(4:1) (C)
EA 14.000 $15,000.000 $23,100.000 $14,000.000 $25,000.000
SET (TY I)(S= 6 FT)(HW= 8 FT)(3:1) (C)
EA 4.000 $16,000.000 $25,300.000 $14,300.000 $25,000.000
SET (TY I)(S= 6 FT)(HW= 8 FT)(4:1) (C)
EA 4.000 $16,000.000 $27,500.000 $14,500.000 $30,000.000
SET (TY I)(S= 8 FT)(HW= 10 FT(3:1) (C)
EA 5.000 $21,000.000 $37,400.000 $15,750.000 $40,000.000
SET (TY I)(S= 8 FT)(HW= 7 FT)(4:1) (C)
EA 12.000 $23,500.000 $30,800.000 $18,000.000 $30,000.000
SET (TY I)(S= 8 FT)(HW= 8 FT)(3:1) (C)
EA 4.000 $20,000.000 $33,000.000 $19,200.000 $30,000.000
SET (TY I)(S= 8 FT)(HW= 9 FT)(3:1) (C)
EA 8.000 $20,000.000 $35,200.000 $19,500.000 $35,000.000
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 3.000 $1,500.000 $1,100.000 $2,100.000 $1,000.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 1.000 $1,600.000 $1,320.000 $2,404.550 $1,200.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 56.000 $1,400.000 $1,650.000 $2,030.000 $15,000.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $1,700.000 $2,200.000 $3,610.000 $2,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 18.000 $2,100.000 $2,750.000 $2,590.000 $2,500.000
SET (TY II) (30 IN) (RCP) (6: 1) (C)
EA 2.000 $3,500.000 $4,400.000 $5,960.000 $4,000.000
CLEAN EXIST CULVERTS
EA 38.000 $2,500.000 $1,650.000 $2,500.000 $2,000.000
REMOV STR (PIPE)
LF 3.000 $40.000 $1,650.000 $300.000 $1,500.000
REMOV STR (BRIDGE 500 - 999 FT LENGTH)
EA 1.000 $750,000.000 $295,000.000 $550,750.000 $2,000,000.000
REMOV STR (DRIVEWAY CULVERT)
EA 22.000 $900.000 $1,650.000 $1,460.000 $2,000.000
MOBILIZATION
LS 1.000 $3,540,000.000 $4,100,000.000 $4,400,000.000 $4,500,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 27.000 $8,000.000 $23,055.000 $14,300.000 $150,000.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 4,628.000 $35.000 $30.000 $48.750 $50.000
CONSTRUCTION EXITS (REMOVE)
SY 4,628.000 $10.000 $10.000 $14.600 $15.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 37,787.000 $4.500 $6.000 $4.550 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 37,787.000 $1.500 $2.000 $1.150 $1.500
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 7,220.000 $8.000 $8.000 $6.600 $7.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 7,220.000 $3.500 $2.000 $1.150 $1.500
CONSTRUCTING DETOURS
SY 260.000 $105.000 $200.000 $204.000 $100.000
PTB(FRN&INSTL)(SSCB OR CSB)(TY1)OR(STL)
LF 4,470.000 $45.000 $72.250 $44.750 $76.000
PTB(MOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 8,940.000 $10.000 $7.000 $7.450 $8.000
PTB(REMOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 4,470.000 $15.000 $25.000 $21.900 $8.000
DRIVEWAYS (CONC)
SY 130.000 $172.000 $220.000 $150.000 $200.000
DRIVEWAYS (ACP)
SY 2,942.000 $85.000 $75.000 $71.700 $25.000
DRIVEWAYS (SURF TREAT)
SY 1,595.000 $50.000 $45.000 $115.000 $10.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 138,028.000 $0.500 $0.180 $0.050 $0.300
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 69,014.000 $0.500 $0.180 $0.050 $0.400
MTL W-BEAM GD FEN (STEEL POST)
LF 3,339.000 $40.000 $35.500 $29.900 $34.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 20.000 $2,500.000 $2,915.000 $20.000 $3,000.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 50.000 $35.000 $31.150 $50.000 $30.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 75.000 $80.000 $64.000 $101.000 $60.000
REMOVE METAL BEAM GUARD FENCE
LF 3,838.000 $3.000 $2.200 $5.000 $2.000
GUARDRAIL END TREATMENT (INSTALL)
EA 28.000 $3,350.000 $3,650.000 $3,320.000 $3,300.000
GUARDRAIL END TREATMENT (REMOVE)
EA 24.000 $330.000 $220.000 $475.000 $200.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 50.000 $1,600.000 $2,750.000 $1,260.000 $2,500.000
CRASH CUSH ATTEN (REMOVE)
EA 16.000 $1,000.000 $1,650.000 $1,140.000 $1,500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 16.000 $10,000.000 $7,700.000 $9,670.000 $7,000.000
WIRE FENCE (TY A)
LF 180.000 $25.000 $22.000 $25.000 $20.000
WIRE FENCE (TY C)
LF 96.000 $25.000 $24.000 $25.000 $22.000
WIRE FENCE (TY D)
LF 85.000 $25.000 $27.500 $25.000 $25.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 1.000 $340.000 $385.000 $350.000 $350.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 3.000 $600.000 $810.000 $800.000 $735.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 62.000 $775.000 $950.000 $529.000 $865.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 39.000 $950.000 $1,062.000 $654.000 $965.000
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
EA 6.000 $1,250.000 $1,500.000 $860.000 $1,350.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 5.000 $1,250.000 $1,220.000 $924.000 $1,110.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 9.000 $1,250.000 $1,400.000 $977.000 $1,265.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 9.000 $1,350.000 $1,540.000 $1,140.000 $1,400.000
REMOVE SM RD SN SUP&AM
EA 117.000 $150.000 $110.000 $75.000 $100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 112.000 $35.000 $32.000 $18.000 $29.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 109.000 $80.000 $140.000 $44.000 $125.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 975.000 $1.000 $1.000 $0.450 $1.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 157,185.000 $0.700 $0.200 $0.350 $0.250
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 157,230.000 $0.700 $0.200 $0.350 $0.250
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 14,101.000 $1.750 $2.750 $1.350 $1.000
REFL PAV MRK TY I (W)6"(DOT)(090MIL)
LF 2,141.000 $2.500 $1.200 $0.700 $1.250
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
LF 218.000 $2.000 $3.300 $1.200 $4.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 5,103.000 $1.500 $1.100 $1.200 $1.250
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 380.000 $10.000 $11.000 $6.000 $9.000
REFL PAV MRK TY I (Y)12"(SLD)(090MIL)
LF 1,199.000 $4.750 $7.700 $3.000 $4.500
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
LF 11,620.000 $0.750 $0.820 $0.650 $0.750
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 146,900.000 $1.000 $0.760 $0.600 $0.650
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
LF 8,454.000 $1.000 $0.760 $0.650 $0.750
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 100,224.000 $0.750 $0.760 $0.600 $0.650
PREFAB PAV MRK TY C (W) (ARROW)
EA 12.000 $250.000 $365.000 $174.000 $275.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 16.000 $475.000 $605.000 $428.000 $650.000
PREFAB PAV MRK TY C (W) (WORD)
EA 12.000 $300.000 $530.000 $234.000 $375.000
REFL PAV MRKR TY I-C
EA 873.000 $6.000 $4.700 $3.750 $5.000
REFL PAV MRKR TY II-A-A
EA 2,053.000 $5.000 $4.500 $3.750 $5.000
REFL PAV MRKR TY II-C-R
EA 35.000 $6.000 $11.000 $3.750 $5.000
ELIM EXT PAV MRK & MRKS (4")
LF 1,603.000 $1.500 $2.000 $0.850 $3.500
ELIM EXT PAV MRK & MRKS (ARROW)
EA 2.000 $95.000 $90.000 $65.000 $300.000
FULL - WIDTH MOWING
CYC 6.000 $14,000.000 $6,000.000 $5,000.000 $5,000.000
ANTI - GRAFFITI COATNG(PERMNENT-TY III)
SF 6,523.000 $1.750 $2.750 $2.200 $5.000
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 63.500 $80.000 $198.000 $110.000 $150.000
SP MIXES SP-C SAC-B PG70-22
TON 81,410.000 $130.000 $144.710 $173.800 $129.500
TACK COAT
GAL 30,032.000 $5.000 $3.000 $3.150 $6.000
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 22.000 $450.000 $385.000 $535.000 $1,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 660.000 $140.000 $125.000 $72.500 $115.000
TMA (STATIONARY)
DAY 660.000 $250.000 $200.000 $428.000 $335.000
TMA (MOBILE OPERATION)
DAY 20.000 $475.000 $300.000 $771.000 $950.000
1
RC PIPE (CL III)(18 IN)
LF 583.000 $105.000 $82.500 $0.000 $80.000
1
RC PIPE (CL III)(24 IN)
LF 242.000 $125.000 $171.000 $0.000 $175.000
1
RC PIPE (CL III)(30 IN)
LF 20.000 $145.000 $275.000 $0.000 $300.000
1A
RC PIPE (CL III)(18 IN)
LF 40.000 $105.000 $0.000 $245.000 $0.000
1A
RC PIPE (CL III)(24 IN)
LF 25.000 $125.000 $0.000 $250.000 $0.000
1A
THERMOPLASTIC PIPE (30 IN)(PP)(TYPE I)
LF 20.000 $145.000 $0.000 $245.000 $0.000
1A
THERMOPLASTIC PIPE (24 IN)(PP)(TYPE I)
LF 217.000 $125.000 $0.000 $185.000 $0.000
1A
THERMOPLASTIC PIPE (18 IN)(PP)(TYPE I)
LF 543.000 $105.000 $0.000 $162.000 $0.000
Totals: $36,927,127.550 $41,866,305.490 $45,333,300.000 $45,620,464.640