PREPARING ROW
|
STA
|
731.000
|
$200.000
|
$2,000.000
|
$6,100.000
|
$500.000
|
|
|
|
PREPARING ROW (TREE) (6" TO 24" DIA)
|
EA
|
37.000
|
$2,000.000
|
$1,500.000
|
$1,500.000
|
$2,000.000
|
|
|
|
PREPARING ROW(TREE)(24" TO 36" DIA.)
|
EA
|
4.000
|
$2,500.000
|
$3,000.000
|
$2,500.000
|
$1,750.000
|
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
503.000
|
$65.000
|
$40.000
|
$46.250
|
$21.480
|
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
128.000
|
$50.000
|
$30.000
|
$24.900
|
$25.000
|
|
|
|
REMOVING STAB BASE & ASPH PAV (4" - 6")
|
SY
|
5,963.000
|
$8.000
|
$14.750
|
$4.050
|
$20.000
|
|
|
|
REMOVE STAB BASE & ASPH PAV (12"-22")
|
SY
|
18,876.000
|
$18.000
|
$12.000
|
$3.850
|
$20.000
|
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
22,029.000
|
$25.000
|
$23.000
|
$14.800
|
$20.000
|
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
559.740
|
$30.000
|
$50.000
|
$60.000
|
$20.000
|
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
25,913.000
|
$20.000
|
$25.000
|
$28.100
|
$20.000
|
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
6,991.000
|
$50.000
|
$40.000
|
$65.000
|
$75.000
|
|
|
|
BACKFILL (TY A OR B)
|
STA
|
696.000
|
$230.000
|
$300.000
|
$255.000
|
$300.000
|
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
298,177.000
|
$0.400
|
$0.300
|
$0.200
|
$0.200
|
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
298,177.000
|
$0.400
|
$0.300
|
$0.200
|
$0.200
|
|
|
|
PROOF ROLLING
|
HR
|
99.000
|
$125.000
|
$200.000
|
$162.000
|
$250.000
|
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
17,874.000
|
$110.000
|
$70.000
|
$80.950
|
$65.000
|
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
1,562.000
|
$230.000
|
$415.000
|
$380.000
|
$400.000
|
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
74,399.000
|
$7.000
|
$7.000
|
$11.100
|
$10.000
|
|
|
|
PRIME COAT (MC-30)
|
GAL
|
16,087.000
|
$10.000
|
$6.000
|
$7.600
|
$6.500
|
|
|
|
ASPH (CRS-2P)
|
GAL
|
97,065.000
|
$5.500
|
$6.500
|
$7.000
|
$5.000
|
|
|
|
AGGR(TY-PB GR-3 SAC-B)
|
CY
|
847.000
|
$225.000
|
$200.000
|
$311.000
|
$160.000
|
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
3,494.000
|
$150.000
|
$200.000
|
$273.000
|
$160.000
|
|
|
|
ASPH (AC-20-5TR OR AC-20XP)
|
GAL
|
97,065.000
|
$5.500
|
$6.000
|
$7.500
|
$5.000
|
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
9,723.000
|
$85.000
|
$64.000
|
$126.000
|
$80.000
|
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
34,798.000
|
$2.000
|
$3.000
|
$1.500
|
$3.500
|
|
|
|
PLANE ASPH CONC PAV(0" TO 3")
|
SY
|
8,067.000
|
$5.000
|
$5.200
|
$4.850
|
$4.000
|
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
24,821.000
|
$4.000
|
$2.700
|
$3.150
|
$3.000
|
|
|
|
CEM STABIL BKFL
|
CY
|
442.000
|
$300.000
|
$320.000
|
$202.000
|
$200.000
|
|
|
|
CUT & RESTORING PAV
|
SY
|
10.070
|
$200.000
|
$220.000
|
$160.000
|
$250.000
|
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
144.670
|
$200.000
|
$220.000
|
$160.000
|
$250.000
|
|
|
|
CUT AND RESTORE PAV (FLEX BASE)
|
SY
|
17.580
|
$60.000
|
$55.000
|
$160.000
|
$100.000
|
|
|
|
FLOWABLE BACKFILL
|
CY
|
81.680
|
$400.000
|
$330.000
|
$360.000
|
$300.000
|
|
|
|
TEMPORARY SPL SHORING
|
SF
|
11,973.000
|
$45.000
|
$77.000
|
$35.500
|
$75.000
|
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
115.000
|
$175.000
|
$165.000
|
$100.000
|
$160.000
|
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,650.000
|
$450.000
|
$320.000
|
$250.000
|
$310.000
|
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
400.000
|
$500.000
|
$440.000
|
$350.000
|
$400.000
|
|
|
|
CL B CONC (FLUME)
|
CY
|
35.000
|
$860.000
|
$1,000.000
|
$1,000.000
|
$2,000.000
|
|
|
|
CL C CONC (ABUT)
|
CY
|
78.500
|
$1,400.000
|
$1,540.000
|
$1,590.000
|
$2,000.000
|
|
|
|
CL C CONC (CAP)
|
CY
|
177.800
|
$1,600.000
|
$1,430.000
|
$1,690.000
|
$2,000.000
|
|
|
|
CL C CONC (COLUMN)
|
CY
|
109.600
|
$1,600.000
|
$1,914.000
|
$1,700.000
|
$2,000.000
|
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
5.100
|
$1,000.000
|
$1,200.000
|
$1,860.000
|
$2,000.000
|
|
|
|
REINF CONC SLAB
|
SF
|
54,230.000
|
$25.000
|
$30.800
|
$31.400
|
$32.500
|
|
|
|
APPROACH SLAB
|
CY
|
90.000
|
$900.000
|
$1,067.000
|
$606.000
|
$2,000.000
|
|
|
|
RETAINING WALL (MSE)
|
SF
|
6,897.000
|
$70.000
|
$139.500
|
$50.250
|
$75.000
|
|
|
|
RETAINING WALL (TEMP WALL)
|
SF
|
956.000
|
$30.000
|
$50.000
|
$1.000
|
$70.000
|
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
6,517.000
|
$230.000
|
$244.200
|
$195.000
|
$250.000
|
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
247.250
|
$250.000
|
$264.000
|
$225.000
|
$225.000
|
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
30.800
|
$650.000
|
$1,050.000
|
$600.000
|
$950.000
|
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
161.880
|
$215.000
|
$160.000
|
$300.000
|
$200.000
|
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
3,323.000
|
$200.000
|
$290.000
|
$236.000
|
$300.000
|
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
398.000
|
$615.000
|
$745.000
|
$920.000
|
$700.000
|
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL3)
|
LF
|
764.000
|
$25.000
|
$51.700
|
$43.000
|
$50.000
|
|
|
|
RAIL (TY SSTR)
|
LF
|
1,452.400
|
$100.000
|
$118.000
|
$54.500
|
$85.000
|
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS)
|
LF
|
971.000
|
$100.000
|
$105.000
|
$55.000
|
$100.000
|
|
|
|
RETROFIT RAIL (TY T222)
|
LF
|
1,236.000
|
$300.000
|
$330.000
|
$137.000
|
$300.000
|
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
228.000
|
$220.000
|
$247.500
|
$180.000
|
$250.000
|
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
159.000
|
$700.000
|
$770.000
|
$650.000
|
$800.000
|
|
|
|
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
|
LF
|
6.000
|
$735.000
|
$800.000
|
$675.000
|
$800.000
|
|
|
|
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
|
LF
|
8.000
|
$775.000
|
$825.000
|
$725.000
|
$800.000
|
|
|
|
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
|
LF
|
114.000
|
$900.000
|
$990.000
|
$850.000
|
$1,000.000
|
|
|
|
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
|
LF
|
89.000
|
$770.000
|
$935.000
|
$900.000
|
$900.000
|
|
|
|
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
|
LF
|
102.000
|
$915.000
|
$1,100.000
|
$950.000
|
$1,200.000
|
|
|
|
CONC BOX CULV (7 FT X 3 FT)(EXTEND)
|
LF
|
18.000
|
$1,300.000
|
$990.000
|
$1,200.000
|
$1,000.000
|
|
|
|
CONC BOX CULV (8 FT X 6 FT)(EXTEND)
|
LF
|
28.000
|
$940.000
|
$1,320.000
|
$1,300.000
|
$1,500.000
|
|
|
|
CONC BOX CULV (8 FT X 8 FT)(EXTEND)
|
LF
|
54.000
|
$1,300.000
|
$1,650.000
|
$1,500.000
|
$2,000.000
|
|
|
|
RC PIPE (CL IV)(18 IN)
|
LF
|
37.000
|
$110.000
|
$100.000
|
$100.000
|
$100.000
|
|
|
|
WINGWALL (FW - S) (HW=3 FT)
|
EA
|
3.000
|
$9,500.000
|
$8,250.000
|
$6,700.000
|
$10,000.000
|
|
|
|
WINGWALL (FW - S) (HW=4 FT)
|
EA
|
1.000
|
$7,600.000
|
$13,750.000
|
$8,500.000
|
$15,000.000
|
|
|
|
WINGWALL (FW - S) (HW=8 FT)
|
EA
|
1.000
|
$20,000.000
|
$26,400.000
|
$20,100.000
|
$50,000.000
|
|
|
|
WINGWALL (PW - 1) (HW=10 FT)
|
EA
|
1.000
|
$50,000.000
|
$71,500.000
|
$39,500.000
|
$30,000.000
|
|
|
|
WINGWALL (PW - 1) (HW=4 FT)
|
EA
|
1.000
|
$16,000.000
|
$27,500.000
|
$13,200.000
|
$70,000.000
|
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
1.000
|
$30,000.000
|
$50,000.000
|
$23,500.000
|
$30,000.000
|
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
1.000
|
$35,000.000
|
$54,000.000
|
$27,000.000
|
$50,000.000
|
|
|
|
SET (TY I)(S=10 FT)(HW=10 FT)(3:1)(C)
|
EA
|
1.000
|
$21,000.000
|
$51,700.000
|
$16,000.000
|
$50,000.000
|
|
|
|
SET (TY I)(S=10 FT)(HW=11 FT)(3:1)(C)
|
EA
|
1.000
|
$21,000.000
|
$54,000.000
|
$22,000.000
|
$50,000.000
|
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
|
EA
|
9.000
|
$8,600.000
|
$8,800.000
|
$7,500.000
|
$10,000.000
|
|
|
|
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
|
EA
|
2.000
|
$9,200.000
|
$9,400.000
|
$8,500.000
|
$9,000.000
|
|
|
|
SET (TY I)(S=3 FT)(HW= 5 FT)(4:1)(C)
|
EA
|
3.000
|
$9,700.000
|
$10,500.000
|
$11,200.000
|
$10,000.000
|
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
2.000
|
$8,500.000
|
$10,500.000
|
$7,900.000
|
$10,000.000
|
|
|
|
SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
8.000
|
$11,200.000
|
$18,700.000
|
$11,500.000
|
$20,000.000
|
|
|
|
SET (TY I)(S= 5 FT)(HW= 6 FT)(4:1) (C)
|
EA
|
18.000
|
$15,000.000
|
$21,000.000
|
$11,800.000
|
$20,000.000
|
|
|
|
SET (TY I)(S= 5 FT)(HW= 7 FT)(4:1) (C)
|
EA
|
6.000
|
$18,000.000
|
$22,000.000
|
$13,750.000
|
$20,000.000
|
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
9.000
|
$9,500.000
|
$18,150.000
|
$9,500.000
|
$20,000.000
|
|
|
|
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
1.000
|
$12,000.000
|
$19,250.000
|
$12,100.000
|
$20,000.000
|
|
|
|
SET (TY I)(S= 6 FT)(HW= 7 FT)(3:1) (C)
|
EA
|
4.000
|
$13,000.000
|
$21,000.000
|
$13,900.000
|
$20,000.000
|
|
|
|
SET (TY I)(S= 6 FT)(HW= 7 FT)(4:1) (C)
|
EA
|
14.000
|
$15,000.000
|
$23,100.000
|
$14,000.000
|
$25,000.000
|
|
|
|
SET (TY I)(S= 6 FT)(HW= 8 FT)(3:1) (C)
|
EA
|
4.000
|
$16,000.000
|
$25,300.000
|
$14,300.000
|
$25,000.000
|
|
|
|
SET (TY I)(S= 6 FT)(HW= 8 FT)(4:1) (C)
|
EA
|
4.000
|
$16,000.000
|
$27,500.000
|
$14,500.000
|
$30,000.000
|
|
|
|
SET (TY I)(S= 8 FT)(HW= 10 FT(3:1) (C)
|
EA
|
5.000
|
$21,000.000
|
$37,400.000
|
$15,750.000
|
$40,000.000
|
|
|
|
SET (TY I)(S= 8 FT)(HW= 7 FT)(4:1) (C)
|
EA
|
12.000
|
$23,500.000
|
$30,800.000
|
$18,000.000
|
$30,000.000
|
|
|
|
SET (TY I)(S= 8 FT)(HW= 8 FT)(3:1) (C)
|
EA
|
4.000
|
$20,000.000
|
$33,000.000
|
$19,200.000
|
$30,000.000
|
|
|
|
SET (TY I)(S= 8 FT)(HW= 9 FT)(3:1) (C)
|
EA
|
8.000
|
$20,000.000
|
$35,200.000
|
$19,500.000
|
$35,000.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (3: 1) (C)
|
EA
|
3.000
|
$1,500.000
|
$1,100.000
|
$2,100.000
|
$1,000.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$1,600.000
|
$1,320.000
|
$2,404.550
|
$1,200.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
56.000
|
$1,400.000
|
$1,650.000
|
$2,030.000
|
$15,000.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,700.000
|
$2,200.000
|
$3,610.000
|
$2,000.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
18.000
|
$2,100.000
|
$2,750.000
|
$2,590.000
|
$2,500.000
|
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$3,500.000
|
$4,400.000
|
$5,960.000
|
$4,000.000
|
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
38.000
|
$2,500.000
|
$1,650.000
|
$2,500.000
|
$2,000.000
|
|
|
|
REMOV STR (PIPE)
|
LF
|
3.000
|
$40.000
|
$1,650.000
|
$300.000
|
$1,500.000
|
|
|
|
REMOV STR (BRIDGE 500 - 999 FT LENGTH)
|
EA
|
1.000
|
$750,000.000
|
$295,000.000
|
$550,750.000
|
$2,000,000.000
|
|
|
|
REMOV STR (DRIVEWAY CULVERT)
|
EA
|
22.000
|
$900.000
|
$1,650.000
|
$1,460.000
|
$2,000.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$3,540,000.000
|
$4,100,000.000
|
$4,400,000.000
|
$4,500,000.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
27.000
|
$8,000.000
|
$23,055.000
|
$14,300.000
|
$150,000.000
|
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
4,628.000
|
$35.000
|
$30.000
|
$48.750
|
$50.000
|
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
4,628.000
|
$10.000
|
$10.000
|
$14.600
|
$15.000
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
37,787.000
|
$4.500
|
$6.000
|
$4.550
|
$5.000
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
37,787.000
|
$1.500
|
$2.000
|
$1.150
|
$1.500
|
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
7,220.000
|
$8.000
|
$8.000
|
$6.600
|
$7.000
|
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
7,220.000
|
$3.500
|
$2.000
|
$1.150
|
$1.500
|
|
|
|
CONSTRUCTING DETOURS
|
SY
|
260.000
|
$105.000
|
$200.000
|
$204.000
|
$100.000
|
|
|
|
PTB(FRN&INSTL)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
4,470.000
|
$45.000
|
$72.250
|
$44.750
|
$76.000
|
|
|
|
PTB(MOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
8,940.000
|
$10.000
|
$7.000
|
$7.450
|
$8.000
|
|
|
|
PTB(REMOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
4,470.000
|
$15.000
|
$25.000
|
$21.900
|
$8.000
|
|
|
|
DRIVEWAYS (CONC)
|
SY
|
130.000
|
$172.000
|
$220.000
|
$150.000
|
$200.000
|
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,942.000
|
$85.000
|
$75.000
|
$71.700
|
$25.000
|
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
1,595.000
|
$50.000
|
$45.000
|
$115.000
|
$10.000
|
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
138,028.000
|
$0.500
|
$0.180
|
$0.050
|
$0.300
|
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
69,014.000
|
$0.500
|
$0.180
|
$0.050
|
$0.400
|
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
3,339.000
|
$40.000
|
$35.500
|
$29.900
|
$34.500
|
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
20.000
|
$2,500.000
|
$2,915.000
|
$20.000
|
$3,000.000
|
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
50.000
|
$35.000
|
$31.150
|
$50.000
|
$30.000
|
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
75.000
|
$80.000
|
$64.000
|
$101.000
|
$60.000
|
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
3,838.000
|
$3.000
|
$2.200
|
$5.000
|
$2.000
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
28.000
|
$3,350.000
|
$3,650.000
|
$3,320.000
|
$3,300.000
|
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
24.000
|
$330.000
|
$220.000
|
$475.000
|
$200.000
|
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
50.000
|
$1,600.000
|
$2,750.000
|
$1,260.000
|
$2,500.000
|
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
16.000
|
$1,000.000
|
$1,650.000
|
$1,140.000
|
$1,500.000
|
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
16.000
|
$10,000.000
|
$7,700.000
|
$9,670.000
|
$7,000.000
|
|
|
|
WIRE FENCE (TY A)
|
LF
|
180.000
|
$25.000
|
$22.000
|
$25.000
|
$20.000
|
|
|
|
WIRE FENCE (TY C)
|
LF
|
96.000
|
$25.000
|
$24.000
|
$25.000
|
$22.000
|
|
|
|
WIRE FENCE (TY D)
|
LF
|
85.000
|
$25.000
|
$27.500
|
$25.000
|
$25.000
|
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
1.000
|
$340.000
|
$385.000
|
$350.000
|
$350.000
|
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
3.000
|
$600.000
|
$810.000
|
$800.000
|
$735.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
62.000
|
$775.000
|
$950.000
|
$529.000
|
$865.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
39.000
|
$950.000
|
$1,062.000
|
$654.000
|
$965.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
|
EA
|
6.000
|
$1,250.000
|
$1,500.000
|
$860.000
|
$1,350.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
5.000
|
$1,250.000
|
$1,220.000
|
$924.000
|
$1,110.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
9.000
|
$1,250.000
|
$1,400.000
|
$977.000
|
$1,265.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
9.000
|
$1,350.000
|
$1,540.000
|
$1,140.000
|
$1,400.000
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
117.000
|
$150.000
|
$110.000
|
$75.000
|
$100.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
112.000
|
$35.000
|
$32.000
|
$18.000
|
$29.000
|
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
109.000
|
$80.000
|
$140.000
|
$44.000
|
$125.000
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
975.000
|
$1.000
|
$1.000
|
$0.450
|
$1.000
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
157,185.000
|
$0.700
|
$0.200
|
$0.350
|
$0.250
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
157,230.000
|
$0.700
|
$0.200
|
$0.350
|
$0.250
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
14,101.000
|
$1.750
|
$2.750
|
$1.350
|
$1.000
|
|
|
|
REFL PAV MRK TY I (W)6"(DOT)(090MIL)
|
LF
|
2,141.000
|
$2.500
|
$1.200
|
$0.700
|
$1.250
|
|
|
|
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
|
LF
|
218.000
|
$2.000
|
$3.300
|
$1.200
|
$4.000
|
|
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
5,103.000
|
$1.500
|
$1.100
|
$1.200
|
$1.250
|
|
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
380.000
|
$10.000
|
$11.000
|
$6.000
|
$9.000
|
|
|
|
REFL PAV MRK TY I (Y)12"(SLD)(090MIL)
|
LF
|
1,199.000
|
$4.750
|
$7.700
|
$3.000
|
$4.500
|
|
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
|
LF
|
11,620.000
|
$0.750
|
$0.820
|
$0.650
|
$0.750
|
|
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
|
LF
|
146,900.000
|
$1.000
|
$0.760
|
$0.600
|
$0.650
|
|
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
|
LF
|
8,454.000
|
$1.000
|
$0.760
|
$0.650
|
$0.750
|
|
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
100,224.000
|
$0.750
|
$0.760
|
$0.600
|
$0.650
|
|
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
12.000
|
$250.000
|
$365.000
|
$174.000
|
$275.000
|
|
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
16.000
|
$475.000
|
$605.000
|
$428.000
|
$650.000
|
|
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
12.000
|
$300.000
|
$530.000
|
$234.000
|
$375.000
|
|
|
|
REFL PAV MRKR TY I-C
|
EA
|
873.000
|
$6.000
|
$4.700
|
$3.750
|
$5.000
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
2,053.000
|
$5.000
|
$4.500
|
$3.750
|
$5.000
|
|
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
35.000
|
$6.000
|
$11.000
|
$3.750
|
$5.000
|
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
1,603.000
|
$1.500
|
$2.000
|
$0.850
|
$3.500
|
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
2.000
|
$95.000
|
$90.000
|
$65.000
|
$300.000
|
|
|
|
FULL - WIDTH MOWING
|
CYC
|
6.000
|
$14,000.000
|
$6,000.000
|
$5,000.000
|
$5,000.000
|
|
|
|
ANTI - GRAFFITI COATNG(PERMNENT-TY III)
|
SF
|
6,523.000
|
$1.750
|
$2.750
|
$2.200
|
$5.000
|
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
LF
|
63.500
|
$80.000
|
$198.000
|
$110.000
|
$150.000
|
|
|
|
SP MIXES SP-C SAC-B PG70-22
|
TON
|
81,410.000
|
$130.000
|
$144.710
|
$173.800
|
$129.500
|
|
|
|
TACK COAT
|
GAL
|
30,032.000
|
$5.000
|
$3.000
|
$3.150
|
$6.000
|
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
22.000
|
$450.000
|
$385.000
|
$535.000
|
$1,000.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
660.000
|
$140.000
|
$125.000
|
$72.500
|
$115.000
|
|
|
|
TMA (STATIONARY)
|
DAY
|
660.000
|
$250.000
|
$200.000
|
$428.000
|
$335.000
|
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
20.000
|
$475.000
|
$300.000
|
$771.000
|
$950.000
|
|
1
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
583.000
|
$105.000
|
$82.500
|
$0.000
|
$80.000
|
|
1
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
242.000
|
$125.000
|
$171.000
|
$0.000
|
$175.000
|
|
1
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
20.000
|
$145.000
|
$275.000
|
$0.000
|
$300.000
|
|
1A
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
40.000
|
$105.000
|
$0.000
|
$245.000
|
$0.000
|
|
1A
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
25.000
|
$125.000
|
$0.000
|
$250.000
|
$0.000
|
|
1A
|
|
THERMOPLASTIC PIPE (30 IN)(PP)(TYPE I)
|
LF
|
20.000
|
$145.000
|
$0.000
|
$245.000
|
$0.000
|
|
1A
|
|
THERMOPLASTIC PIPE (24 IN)(PP)(TYPE I)
|
LF
|
217.000
|
$125.000
|
$0.000
|
$185.000
|
$0.000
|
|
1A
|
|
THERMOPLASTIC PIPE (18 IN)(PP)(TYPE I)
|
LF
|
543.000
|
$105.000
|
$0.000
|
$162.000
|
$0.000
|
|
Totals: |
$36,927,127.550
|
$41,866,305.490
|
$45,333,300.000
|
$45,620,464.640
|