Show Job Controls
Bid Cobra

COKE US 277 (0264-04-054)

Items: 147

County: COKE
Length: N/A
Highway: US 277
District: SAN ANGELO
Control Number: 0264-04-054
DBE Goal: N/A
Project: F 2023(767)
Guaranty: N/A
Time: 467 WORKING DAYS
Engineer's Estimate: $30,817,175.62
Date: 11/01/2023 (2 years ago)
Contract Number: N/A
Type: ADD PASSING LANES
Mail/Deliver Bids To: N/A
JORDAN SEFCIK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$30,817,175.62
$24,893,157.94
Over/Under Est: -19.22% -$5,924,017.68
$31,356,505.26
Over/Under Est: 1.75% $539,329.64
Amt Left: 25.96% $6,463,347.32
Over/Under Est: 9.71% $2,991,450.11
Amt Left: 35.81% $8,915,467.79
Delta: -7.82% -$2,452,120.47
Subcontractor Percentage Amount
CLEARFIELD CONSTRUCTION, LLC 6.97% $1,779,722.09
HJC FARMS, INC. 4.99% $1,274,148.24
SCR CIVIL CONSTRUCTION, LLC 1.48% $377,903.69
D. I. J. CONSTRUCTION, INC. 1.24% $316,622.01
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 1.21% $308,961.80
K. L. DURHAM CONSTRUCTION, L.L.C. 1.21% $308,961.80
DK CONTRACTING, LLC 0.73% $186,398.44
DOUBLE A CONTRACTING, L.P. 0.53% $135,330.37
BARRICADES UNLIMITED 0.18% $45,961.26
SURFACE PREPARATION TECHNOLOGIES, LLC 0.13% $33,194.24
PREMIER WIRE FENCE, LTD. 0.03% $7,660.21
WEST TEXAS ROCK RESOURCES, LLC 0.02% $5,106.81
Total: 18.72% $4,779,970.96

Bid Items & Bid Tabulations

147 Total 0 of 147
COKE  |  US 277  |  SAN ANGELO  |  0264-04-054  |  11/01/2023  |  $30,817,175.62  |  F 2023(767)  |  ADD PASSING LANES  |  467 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
REECE ALBERT, INC.
DELHUR INDUSTRIES, INC.
J. H. STRAIN & SONS, INC.
PREPARING ROW
STA 763.000 $3,000.000 $48.320 $480.400 $4,010.000
PREPARING ROW (TREE) (6" TO 24" DIA)
EA 50.000 $2,000.000 $928.750 $1,650.000 $1,750.000
PREPARING ROW(TREE)(24" TO 36" DIA.)
EA 25.000 $2,500.000 $1,888.580 $3,410.000 $3,000.000
REMOVING CONC (RIPRAP)
SY 212.000 $50.000 $107.040 $46.470 $55.000
REMOVING STAB BASE & ASPH PAV (6" - 8")
SY 13,620.000 $20.000 $5.000 $8.120 $11.000
EXCAVATION (ROADWAY)
CY 3,803.000 $25.000 $10.000 $12.000 $40.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 27,381.000 $25.000 $17.540 $23.970 $25.000
BACKFILL (TY A OR B)
STA 842.000 $300.000 $176.920 $293.670 $300.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 168,272.000 $0.400 $0.190 $0.190 $0.250
DRILL SEEDING (TEMP) (WARM)
SY 84,136.000 $0.700 $0.160 $0.150 $0.250
DRILL SEEDING (TEMP) (COOL)
SY 84,136.000 $0.850 $0.160 $0.150 $0.250
PROOF ROLLING
HR 68.000 $200.000 $172.520 $220.000 $200.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 9,438.000 $85.000 $61.020 $61.010 $68.000
LIME (HYDRATED LIME (SLURRY))
TON 860.000 $400.000 $434.800 $421.300 $425.000
LIME TRT (SUBGRADE)(8")
SY 11,593.000 $10.000 $10.480 $7.100 $10.000
LIME TRT (SUBGRADE)(6")
SY 39,112.000 $6.000 $9.320 $6.920 $10.000
PRIME COAT (MC-30)
GAL 10,900.000 $8.000 $7.400 $6.460 $7.000
ASPH (CRS-2P)
GAL 100,112.000 $8.000 $5.690 $6.900 $7.250
AGGR(TY-PB GR-3 SAC-B)
CY 574.000 $240.000 $308.850 $135.550 $230.000
AGGR(TY-PB GR-4 SAC-B)
CY 3,887.000 $275.000 $36.360 $134.450 $230.000
ASPH (AC-20-5TR OR AC-20XP)
GAL 100,112.000 $6.000 $5.740 $6.900 $6.750
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 7,516.000 $90.000 $87.200 $93.410 $85.000
PLANE ASPH CONC PAV(0" TO 2")
SY 6,938.000 $4.000 $6.430 $2.040 $5.400
PLANE ASPH CONC PAV(0" TO 3")
SY 8,723.000 $4.000 $6.820 $6.420 $5.400
PLANE ASPH CONC PAV (2")
SY 6,668.000 $4.000 $6.690 $4.650 $5.400
PLANE ASPH CONC PAV (3")
SY 1,056.000 $4.000 $7.040 $5.030 $5.400
CEM STABIL BKFL
CY 267.000 $300.000 $484.890 $357.500 $312.000
CUT & RESTORE ASPH PAVING
SY 196.000 $220.000 $45.840 $242.000 $331.000
CUT AND RESTORE PAV (FLEX BASE)
SY 42.000 $85.000 $22.560 $242.000 $125.000
TEMPORARY SPL SHORING
SF 1,911.000 $75.000 $53.000 $38.500 $82.000
CL B CONC (FLUME)
CY 11.000 $1,000.000 $2,317.320 $1,650.000 $1,125.000
CL C CONC (CULV)
CY 14.800 $1,850.000 $2,487.600 $14,300.000 $2,250.000
CL C CONC (RAIL FOUNDATION)
CY 16.000 $1,900.000 $1,423.100 $1,320.000 $1,250.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 156.000 $270.000 $394.680 $385.000 $437.000
RIPRAP (CONC)(5 IN)
CY 78.000 $1,000.000 $857.010 $907.500 $1,250.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 484.000 $210.000 $225.760 $319.000 $188.000
RIPRAP (CONC)(DISSIPATER)
CY 4.000 $2,100.000 $1,001.360 $1,650.000 $4,375.000
RIPRAP (MOW STRIP)(4 IN)
CY 483.000 $750.000 $704.780 $781.000 $781.000
CLEANING AND SEALING EXISTING JOINTS
LF 82.000 $50.000 $152.230 $148.500 $162.000
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 423.000 $50.000 $56.380 $55.000 $60.000
RAIL (TY SSTR)
LF 89.100 $120.000 $182.680 $220.000 $250.000
RAIL (TY T80PP)
LF 100.000 $270.000 $310.100 $440.000 $275.000
RETROFIT RAIL (TY T131RC)
LF 352.000 $220.000 $287.550 $305.030 $318.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 13.000 $800.000 $833.330 $797.500 $1,000.000
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
LF 5.000 $800.000 $850.250 $825.000 $1,062.000
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
LF 22.000 $850.000 $868.290 $907.500 $1,125.000
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 14.000 $1,100.000 $997.970 $990.000 $1,250.000
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
LF 66.000 $1,100.000 $1,093.820 $1,072.500 $1,875.000
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
LF 72.000 $1,000.000 $1,041.950 $1,017.500 $1,875.000
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
LF 50.000 $1,200.000 $1,214.480 $1,155.000 $2,250.000
CONC BOX CULV (7 FT X 3 FT)(EXTEND)
LF 19.000 $1,250.000 $1,084.800 $1,237.500 $2,250.000
CONC BOX CULV (8 FT X 4 FT)(EXTEND)
LF 30.000 $1,300.000 $1,232.520 $1,485.000 $2,500.000
RC PIPE (CL IV)(18 IN)
LF 325.000 $115.000 $235.680 $71.500 $120.000
WINGWALL (PW - 1) (HW=5 FT)
EA 9.000 $25,000.000 $19,084.360 $26,400.000 $50,000.000
WINGWALL (PW - 1) (HW=7 FT)
EA 3.000 $32,000.000 $28,625.420 $35,200.000 $97,500.000
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
EA 6.000 $9,500.000 $9,577.140 $11,550.000 $10,625.000
SET (TY I)(S= 4 FT)(HW= 5 FT)(4:1) (C)
EA 4.000 $12,000.000 $10,954.000 $12,100.000 $11,875.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
EA 4.000 $11,500.000 $10,464.600 $13,200.000 $15,000.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(3:1) (C)
EA 4.000 $10,000.000 $9,927.840 $19,250.000 $18,750.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
EA 8.000 $18,000.000 $10,814.170 $20,900.000 $21,250.000
SET (TY I)(S= 6 FT)(HW= 7 FT)(3:1) (C)
EA 2.000 $21,000.000 $13,911.830 $22,000.000 $24,375.000
SET (TY I)(S= 7 FT)(HW= 4 FT)(4:1) (C)
EA 1.000 $11,000.000 $12,599.240 $27,500.000 $22,500.000
SET (TY I)(S= 8 FT)(HW= 10 FT(3:1) (C)
EA 6.000 $40,000.000 $17,567.670 $30,800.000 $37,500.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 42.000 $1,800.000 $6,200.950 $2,200.000 $1,875.000
CLEAN EXIST CULVERTS
EA 24.000 $3,000.000 $2,169.600 $1,440.000 $3,750.000
REMOV STR (SMALL FENCE)
LF 144.000 $17.000 $19.580 $22.000 $25.000
REMOV STR (DRIVEWAY CULVERT)
EA 17.000 $1,700.000 $1,301.310 $880.000 $3,125.000
MOBILIZATION
LS 1.000 $2,801,561.420 $1,805,517.870 $6,077,280.000 $3,400,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 23.000 $20,000.000 $2,803.540 $44,281.580 $25,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 200.000 $55.000 $80.380 $78.410 $65.000
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 200.000 $56.000 $108.110 $105.460 $125.000
ROCK FILTER DAMS (REMOVE)
LF 400.000 $30.000 $25.270 $36.650 $15.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,344.000 $50.000 $66.690 $30.000 $45.000
CONSTRUCTION EXITS (REMOVE)
SY 1,344.000 $15.000 $14.240 $12.000 $12.500
TEMP SEDMT CONT FENCE (INSTALL)
LF 22,690.000 $5.000 $4.260 $4.160 $6.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 22,690.000 $2.000 $0.850 $0.830 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 2,485.000 $8.000 $6.000 $5.850 $8.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,485.000 $3.000 $0.460 $0.450 $2.000
PTB(FRN&INSTL)(SSCB OR CSB)(TY1)OR(STL)
LF 5,550.000 $73.000 $41.410 $77.700 $115.000
PTB(MOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 18,990.000 $10.000 $9.360 $6.960 $12.000
PTB(REMOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 5,550.000 $25.000 $19.130 $18.000 $24.000
DRIVEWAYS (ACP)
SY 6,839.000 $80.000 $56.610 $40.180 $55.000
DRIVEWAYS (SURF TREAT)
SY 1,981.000 $60.000 $75.010 $60.000 $35.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 167,826.000 $0.800 $0.120 $0.180 $0.190
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 69,389.000 $0.800 $0.120 $0.280 $0.300
MTL W-BEAM GD FEN (STEEL POST)
LF 19,825.000 $36.000 $33.830 $34.270 $36.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 10.000 $3,000.000 $3,016.470 $2,854.500 $3,210.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,700.000 $1,409.560 $1,749.000 $1,500.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 263.000 $65.000 $95.850 $121.390 $102.000
REMOVE METAL BEAM GUARD FENCE
LF 20,427.000 $3.000 $2.260 $3.850 $2.250
GUARDRAIL END TREATMENT (INSTALL)
EA 36.000 $3,500.000 $3,721.250 $3,899.500 $3,860.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 9.000 $850.000 $2,819.130 $2,007.500 $3,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 39.000 $350.000 $225.530 $330.000 $240.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 40.000 $2,500.000 $1,515.030 $1,100.000 $3,000.000
CRASH CUSH ATTEN (REMOVE)
EA 6.000 $1,700.000 $1,515.050 $1,100.000 $1,200.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 6.000 $10,000.000 $10,529.940 $8,189.400 $9,000.000
WIRE FENCE (TY C)
LF 67.000 $26.000 $67.330 $110.000 $120.000
WIRE FENCE (TY D)
LF 67.000 $27.000 $78.130 $110.000 $120.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 7.000 $385.000 $367.610 $358.600 $313.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 4.000 $800.000 $840.100 $819.500 $812.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 101.000 $800.000 $772.440 $753.500 $825.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 76.000 $950.000 $893.100 $871.200 $900.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 3.000 $1,200.000 $1,125.400 $1,097.800 $1,125.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 14.000 $1,300.000 $1,252.820 $1,222.100 $1,187.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 1.000 $1,300.000 $1,321.610 $1,289.200 $1,237.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 5.000 $1,400.000 $1,406.180 $1,371.700 $1,237.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 1.000 $2,790.000 $4,022.330 $3,923.700 $4,800.000
INSTL DEL ASSM (D-SW)SZ 2(WC)GND(BI)
EA 43.000 $50.000 $48.490 $47.300 $106.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 1.000 $80.000 $107.660 $22.000 $24.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 12.000 $80.000 $107.660 $22.000 $24.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 1.000 $80.000 $107.660 $22.000 $24.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 30.000 $80.000 $39.470 $44.000 $42.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 192.000 $35.000 $39.470 $49.500 $42.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 28.000 $80.000 $39.470 $44.000 $42.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 118.000 $120.000 $48.490 $47.300 $106.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 3,380.000 $1.000 $0.280 $0.550 $0.300
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 158,651.000 $0.700 $0.230 $0.280 $0.300
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 156,381.000 $0.700 $0.250 $0.280 $0.300
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 16,086.000 $2.000 $1.820 $1.670 $2.000
REFL PAV MRK TY I (W)6"(DOT)(090MIL)
LF 1,702.000 $1.500 $0.960 $0.790 $1.500
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 4,953.000 $1.600 $0.960 $1.140 $1.200
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
LF 1,437.000 $5.500 $5.640 $5.500 $3.600
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 597.000 $11.000 $12.400 $11.000 $3.600
REFL PAV MRK TY I (Y)12"(SLD)(090MIL)
LF 2,387.000 $7.000 $5.640 $5.500 $3.600
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
LF 8,837.000 $1.000 $0.760 $0.790 $0.620
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 154,481.000 $0.900 $0.720 $0.760 $0.620
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
LF 7,466.000 $1.000 $0.720 $0.790 $0.620
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 116,023.000 $1.000 $0.720 $0.760 $0.620
PREFAB PAV MRK TY C (W) (ARROW)
EA 6.000 $330.000 $281.910 $330.000 $420.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 12.000 $600.000 $958.500 $605.000 $840.000
PREFAB PAV MRK TY C (W) (WORD)
EA 6.000 $400.000 $417.230 $440.000 $420.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 15.000 $70.000 $50.740 $82.500 $30.000
REFL PAV MRKR TY I-C
EA 640.000 $7.000 $5.640 $6.050 $5.400
REFL PAV MRKR TY II-A-A
EA 1,702.000 $8.000 $5.530 $5.500 $5.400
FULL - WIDTH MOWING
CYC 6.000 $6,000.000 $22,249.680 $11,000.000 $6,500.000
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 281.000 $160.000 $140.960 $137.500 $150.000
CARBON FIBER REINF POLYMER PROTECTION
SF 47.200 $120.000 $208.620 $203.500 $222.000
CONCRETE BEAM REPAIR
EA 5.000 $5,000.000 $7,668.030 $7,480.000 $8,160.000
CONCRETE BEAM REPAIR (CFRP)
EA 8.000 $26,000.000 $28,529.570 $27,830.000 $30,300.000
SP MIXES SP-C SAC-B PG70-22
TON 76,512.000 $150.000 $156.390 $152.230 $165.000
TACK COAT
GAL 27,830.000 $6.000 $3.150 $5.150 $3.500
THERMO PIPE(18")(PP)(TY S)(TY II)
LF 258.000 $85.000 $194.200 $0.000 $0.000
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 3.000 $550.000 $735.580 $555.000 $600.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 494.000 $125.000 $121.110 $180.000 $130.000
TMA (STATIONARY)
DAY 494.000 $260.000 $237.550 $480.000 $375.000
TMA (MOBILE OPERATION)
DAY 20.000 $800.000 $451.060 $720.000 $500.000
1
RC PIPE (CL III)(18 IN)
LF 258.000 $85.000 $0.000 $71.500 $100.000
Totals: $30,839,105.620 $24,893,157.952 $31,356,505.260 $33,808,625.730