PREPARING ROW
|
STA
|
763.000
|
$3,000.000
|
$48.320
|
$480.400
|
$4,010.000
|
|
|
|
PREPARING ROW (TREE) (6" TO 24" DIA)
|
EA
|
50.000
|
$2,000.000
|
$928.750
|
$1,650.000
|
$1,750.000
|
|
|
|
PREPARING ROW(TREE)(24" TO 36" DIA.)
|
EA
|
25.000
|
$2,500.000
|
$1,888.580
|
$3,410.000
|
$3,000.000
|
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
212.000
|
$50.000
|
$107.040
|
$46.470
|
$55.000
|
|
|
|
REMOVING STAB BASE & ASPH PAV (6" - 8")
|
SY
|
13,620.000
|
$20.000
|
$5.000
|
$8.120
|
$11.000
|
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
3,803.000
|
$25.000
|
$10.000
|
$12.000
|
$40.000
|
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
27,381.000
|
$25.000
|
$17.540
|
$23.970
|
$25.000
|
|
|
|
BACKFILL (TY A OR B)
|
STA
|
842.000
|
$300.000
|
$176.920
|
$293.670
|
$300.000
|
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
168,272.000
|
$0.400
|
$0.190
|
$0.190
|
$0.250
|
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
84,136.000
|
$0.700
|
$0.160
|
$0.150
|
$0.250
|
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
SY
|
84,136.000
|
$0.850
|
$0.160
|
$0.150
|
$0.250
|
|
|
|
PROOF ROLLING
|
HR
|
68.000
|
$200.000
|
$172.520
|
$220.000
|
$200.000
|
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
9,438.000
|
$85.000
|
$61.020
|
$61.010
|
$68.000
|
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
860.000
|
$400.000
|
$434.800
|
$421.300
|
$425.000
|
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
11,593.000
|
$10.000
|
$10.480
|
$7.100
|
$10.000
|
|
|
|
LIME TRT (SUBGRADE)(6")
|
SY
|
39,112.000
|
$6.000
|
$9.320
|
$6.920
|
$10.000
|
|
|
|
PRIME COAT (MC-30)
|
GAL
|
10,900.000
|
$8.000
|
$7.400
|
$6.460
|
$7.000
|
|
|
|
ASPH (CRS-2P)
|
GAL
|
100,112.000
|
$8.000
|
$5.690
|
$6.900
|
$7.250
|
|
|
|
AGGR(TY-PB GR-3 SAC-B)
|
CY
|
574.000
|
$240.000
|
$308.850
|
$135.550
|
$230.000
|
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
3,887.000
|
$275.000
|
$36.360
|
$134.450
|
$230.000
|
|
|
|
ASPH (AC-20-5TR OR AC-20XP)
|
GAL
|
100,112.000
|
$6.000
|
$5.740
|
$6.900
|
$6.750
|
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
7,516.000
|
$90.000
|
$87.200
|
$93.410
|
$85.000
|
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
6,938.000
|
$4.000
|
$6.430
|
$2.040
|
$5.400
|
|
|
|
PLANE ASPH CONC PAV(0" TO 3")
|
SY
|
8,723.000
|
$4.000
|
$6.820
|
$6.420
|
$5.400
|
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
6,668.000
|
$4.000
|
$6.690
|
$4.650
|
$5.400
|
|
|
|
PLANE ASPH CONC PAV (3")
|
SY
|
1,056.000
|
$4.000
|
$7.040
|
$5.030
|
$5.400
|
|
|
|
CEM STABIL BKFL
|
CY
|
267.000
|
$300.000
|
$484.890
|
$357.500
|
$312.000
|
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
196.000
|
$220.000
|
$45.840
|
$242.000
|
$331.000
|
|
|
|
CUT AND RESTORE PAV (FLEX BASE)
|
SY
|
42.000
|
$85.000
|
$22.560
|
$242.000
|
$125.000
|
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,911.000
|
$75.000
|
$53.000
|
$38.500
|
$82.000
|
|
|
|
CL B CONC (FLUME)
|
CY
|
11.000
|
$1,000.000
|
$2,317.320
|
$1,650.000
|
$1,125.000
|
|
|
|
CL C CONC (CULV)
|
CY
|
14.800
|
$1,850.000
|
$2,487.600
|
$14,300.000
|
$2,250.000
|
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
16.000
|
$1,900.000
|
$1,423.100
|
$1,320.000
|
$1,250.000
|
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
156.000
|
$270.000
|
$394.680
|
$385.000
|
$437.000
|
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
78.000
|
$1,000.000
|
$857.010
|
$907.500
|
$1,250.000
|
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
484.000
|
$210.000
|
$225.760
|
$319.000
|
$188.000
|
|
|
|
RIPRAP (CONC)(DISSIPATER)
|
CY
|
4.000
|
$2,100.000
|
$1,001.360
|
$1,650.000
|
$4,375.000
|
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
483.000
|
$750.000
|
$704.780
|
$781.000
|
$781.000
|
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
82.000
|
$50.000
|
$152.230
|
$148.500
|
$162.000
|
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL3)
|
LF
|
423.000
|
$50.000
|
$56.380
|
$55.000
|
$60.000
|
|
|
|
RAIL (TY SSTR)
|
LF
|
89.100
|
$120.000
|
$182.680
|
$220.000
|
$250.000
|
|
|
|
RAIL (TY T80PP)
|
LF
|
100.000
|
$270.000
|
$310.100
|
$440.000
|
$275.000
|
|
|
|
RETROFIT RAIL (TY T131RC)
|
LF
|
352.000
|
$220.000
|
$287.550
|
$305.030
|
$318.000
|
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
13.000
|
$800.000
|
$833.330
|
$797.500
|
$1,000.000
|
|
|
|
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
|
LF
|
5.000
|
$800.000
|
$850.250
|
$825.000
|
$1,062.000
|
|
|
|
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
|
LF
|
22.000
|
$850.000
|
$868.290
|
$907.500
|
$1,125.000
|
|
|
|
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
|
LF
|
14.000
|
$1,100.000
|
$997.970
|
$990.000
|
$1,250.000
|
|
|
|
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
|
LF
|
66.000
|
$1,100.000
|
$1,093.820
|
$1,072.500
|
$1,875.000
|
|
|
|
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
|
LF
|
72.000
|
$1,000.000
|
$1,041.950
|
$1,017.500
|
$1,875.000
|
|
|
|
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
|
LF
|
50.000
|
$1,200.000
|
$1,214.480
|
$1,155.000
|
$2,250.000
|
|
|
|
CONC BOX CULV (7 FT X 3 FT)(EXTEND)
|
LF
|
19.000
|
$1,250.000
|
$1,084.800
|
$1,237.500
|
$2,250.000
|
|
|
|
CONC BOX CULV (8 FT X 4 FT)(EXTEND)
|
LF
|
30.000
|
$1,300.000
|
$1,232.520
|
$1,485.000
|
$2,500.000
|
|
|
|
RC PIPE (CL IV)(18 IN)
|
LF
|
325.000
|
$115.000
|
$235.680
|
$71.500
|
$120.000
|
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
9.000
|
$25,000.000
|
$19,084.360
|
$26,400.000
|
$50,000.000
|
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
3.000
|
$32,000.000
|
$28,625.420
|
$35,200.000
|
$97,500.000
|
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
|
EA
|
6.000
|
$9,500.000
|
$9,577.140
|
$11,550.000
|
$10,625.000
|
|
|
|
SET (TY I)(S= 4 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
4.000
|
$12,000.000
|
$10,954.000
|
$12,100.000
|
$11,875.000
|
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
4.000
|
$11,500.000
|
$10,464.600
|
$13,200.000
|
$15,000.000
|
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
4.000
|
$10,000.000
|
$9,927.840
|
$19,250.000
|
$18,750.000
|
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
8.000
|
$18,000.000
|
$10,814.170
|
$20,900.000
|
$21,250.000
|
|
|
|
SET (TY I)(S= 6 FT)(HW= 7 FT)(3:1) (C)
|
EA
|
2.000
|
$21,000.000
|
$13,911.830
|
$22,000.000
|
$24,375.000
|
|
|
|
SET (TY I)(S= 7 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
1.000
|
$11,000.000
|
$12,599.240
|
$27,500.000
|
$22,500.000
|
|
|
|
SET (TY I)(S= 8 FT)(HW= 10 FT(3:1) (C)
|
EA
|
6.000
|
$40,000.000
|
$17,567.670
|
$30,800.000
|
$37,500.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
42.000
|
$1,800.000
|
$6,200.950
|
$2,200.000
|
$1,875.000
|
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
24.000
|
$3,000.000
|
$2,169.600
|
$1,440.000
|
$3,750.000
|
|
|
|
REMOV STR (SMALL FENCE)
|
LF
|
144.000
|
$17.000
|
$19.580
|
$22.000
|
$25.000
|
|
|
|
REMOV STR (DRIVEWAY CULVERT)
|
EA
|
17.000
|
$1,700.000
|
$1,301.310
|
$880.000
|
$3,125.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,801,561.420
|
$1,805,517.870
|
$6,077,280.000
|
$3,400,000.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
23.000
|
$20,000.000
|
$2,803.540
|
$44,281.580
|
$25,000.000
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
200.000
|
$55.000
|
$80.380
|
$78.410
|
$65.000
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 4)
|
LF
|
200.000
|
$56.000
|
$108.110
|
$105.460
|
$125.000
|
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
400.000
|
$30.000
|
$25.270
|
$36.650
|
$15.000
|
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,344.000
|
$50.000
|
$66.690
|
$30.000
|
$45.000
|
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,344.000
|
$15.000
|
$14.240
|
$12.000
|
$12.500
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
22,690.000
|
$5.000
|
$4.260
|
$4.160
|
$6.000
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
22,690.000
|
$2.000
|
$0.850
|
$0.830
|
$2.000
|
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
2,485.000
|
$8.000
|
$6.000
|
$5.850
|
$8.000
|
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,485.000
|
$3.000
|
$0.460
|
$0.450
|
$2.000
|
|
|
|
PTB(FRN&INSTL)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
5,550.000
|
$73.000
|
$41.410
|
$77.700
|
$115.000
|
|
|
|
PTB(MOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
18,990.000
|
$10.000
|
$9.360
|
$6.960
|
$12.000
|
|
|
|
PTB(REMOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
5,550.000
|
$25.000
|
$19.130
|
$18.000
|
$24.000
|
|
|
|
DRIVEWAYS (ACP)
|
SY
|
6,839.000
|
$80.000
|
$56.610
|
$40.180
|
$55.000
|
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
1,981.000
|
$60.000
|
$75.010
|
$60.000
|
$35.000
|
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
167,826.000
|
$0.800
|
$0.120
|
$0.180
|
$0.190
|
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
69,389.000
|
$0.800
|
$0.120
|
$0.280
|
$0.300
|
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
19,825.000
|
$36.000
|
$33.830
|
$34.270
|
$36.000
|
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
10.000
|
$3,000.000
|
$3,016.470
|
$2,854.500
|
$3,210.000
|
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
5.000
|
$1,700.000
|
$1,409.560
|
$1,749.000
|
$1,500.000
|
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
263.000
|
$65.000
|
$95.850
|
$121.390
|
$102.000
|
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
20,427.000
|
$3.000
|
$2.260
|
$3.850
|
$2.250
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
36.000
|
$3,500.000
|
$3,721.250
|
$3,899.500
|
$3,860.000
|
|
|
|
GUARDRAIL END TREATMENT (MOVE & RESET)
|
EA
|
9.000
|
$850.000
|
$2,819.130
|
$2,007.500
|
$3,000.000
|
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
39.000
|
$350.000
|
$225.530
|
$330.000
|
$240.000
|
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
40.000
|
$2,500.000
|
$1,515.030
|
$1,100.000
|
$3,000.000
|
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
6.000
|
$1,700.000
|
$1,515.050
|
$1,100.000
|
$1,200.000
|
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
6.000
|
$10,000.000
|
$10,529.940
|
$8,189.400
|
$9,000.000
|
|
|
|
WIRE FENCE (TY C)
|
LF
|
67.000
|
$26.000
|
$67.330
|
$110.000
|
$120.000
|
|
|
|
WIRE FENCE (TY D)
|
LF
|
67.000
|
$27.000
|
$78.130
|
$110.000
|
$120.000
|
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
7.000
|
$385.000
|
$367.610
|
$358.600
|
$313.000
|
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
4.000
|
$800.000
|
$840.100
|
$819.500
|
$812.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
101.000
|
$800.000
|
$772.440
|
$753.500
|
$825.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
76.000
|
$950.000
|
$893.100
|
$871.200
|
$900.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
3.000
|
$1,200.000
|
$1,125.400
|
$1,097.800
|
$1,125.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
14.000
|
$1,300.000
|
$1,252.820
|
$1,222.100
|
$1,187.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
1.000
|
$1,300.000
|
$1,321.610
|
$1,289.200
|
$1,237.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
5.000
|
$1,400.000
|
$1,406.180
|
$1,371.700
|
$1,237.000
|
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
1.000
|
$2,790.000
|
$4,022.330
|
$3,923.700
|
$4,800.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 2(WC)GND(BI)
|
EA
|
43.000
|
$50.000
|
$48.490
|
$47.300
|
$106.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
1.000
|
$80.000
|
$107.660
|
$22.000
|
$24.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
12.000
|
$80.000
|
$107.660
|
$22.000
|
$24.000
|
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
1.000
|
$80.000
|
$107.660
|
$22.000
|
$24.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
30.000
|
$80.000
|
$39.470
|
$44.000
|
$42.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
192.000
|
$35.000
|
$39.470
|
$49.500
|
$42.000
|
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
28.000
|
$80.000
|
$39.470
|
$44.000
|
$42.000
|
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
118.000
|
$120.000
|
$48.490
|
$47.300
|
$106.000
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
3,380.000
|
$1.000
|
$0.280
|
$0.550
|
$0.300
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
158,651.000
|
$0.700
|
$0.230
|
$0.280
|
$0.300
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
156,381.000
|
$0.700
|
$0.250
|
$0.280
|
$0.300
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
16,086.000
|
$2.000
|
$1.820
|
$1.670
|
$2.000
|
|
|
|
REFL PAV MRK TY I (W)6"(DOT)(090MIL)
|
LF
|
1,702.000
|
$1.500
|
$0.960
|
$0.790
|
$1.500
|
|
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
4,953.000
|
$1.600
|
$0.960
|
$1.140
|
$1.200
|
|
|
|
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
|
LF
|
1,437.000
|
$5.500
|
$5.640
|
$5.500
|
$3.600
|
|
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
597.000
|
$11.000
|
$12.400
|
$11.000
|
$3.600
|
|
|
|
REFL PAV MRK TY I (Y)12"(SLD)(090MIL)
|
LF
|
2,387.000
|
$7.000
|
$5.640
|
$5.500
|
$3.600
|
|
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
|
LF
|
8,837.000
|
$1.000
|
$0.760
|
$0.790
|
$0.620
|
|
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
|
LF
|
154,481.000
|
$0.900
|
$0.720
|
$0.760
|
$0.620
|
|
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
|
LF
|
7,466.000
|
$1.000
|
$0.720
|
$0.790
|
$0.620
|
|
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
116,023.000
|
$1.000
|
$0.720
|
$0.760
|
$0.620
|
|
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
6.000
|
$330.000
|
$281.910
|
$330.000
|
$420.000
|
|
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
12.000
|
$600.000
|
$958.500
|
$605.000
|
$840.000
|
|
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
6.000
|
$400.000
|
$417.230
|
$440.000
|
$420.000
|
|
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
15.000
|
$70.000
|
$50.740
|
$82.500
|
$30.000
|
|
|
|
REFL PAV MRKR TY I-C
|
EA
|
640.000
|
$7.000
|
$5.640
|
$6.050
|
$5.400
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,702.000
|
$8.000
|
$5.530
|
$5.500
|
$5.400
|
|
|
|
FULL - WIDTH MOWING
|
CYC
|
6.000
|
$6,000.000
|
$22,249.680
|
$11,000.000
|
$6,500.000
|
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
LF
|
281.000
|
$160.000
|
$140.960
|
$137.500
|
$150.000
|
|
|
|
CARBON FIBER REINF POLYMER PROTECTION
|
SF
|
47.200
|
$120.000
|
$208.620
|
$203.500
|
$222.000
|
|
|
|
CONCRETE BEAM REPAIR
|
EA
|
5.000
|
$5,000.000
|
$7,668.030
|
$7,480.000
|
$8,160.000
|
|
|
|
CONCRETE BEAM REPAIR (CFRP)
|
EA
|
8.000
|
$26,000.000
|
$28,529.570
|
$27,830.000
|
$30,300.000
|
|
|
|
SP MIXES SP-C SAC-B PG70-22
|
TON
|
76,512.000
|
$150.000
|
$156.390
|
$152.230
|
$165.000
|
|
|
|
TACK COAT
|
GAL
|
27,830.000
|
$6.000
|
$3.150
|
$5.150
|
$3.500
|
|
|
|
THERMO PIPE(18")(PP)(TY S)(TY II)
|
LF
|
258.000
|
$85.000
|
$194.200
|
$0.000
|
$0.000
|
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
3.000
|
$550.000
|
$735.580
|
$555.000
|
$600.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
494.000
|
$125.000
|
$121.110
|
$180.000
|
$130.000
|
|
|
|
TMA (STATIONARY)
|
DAY
|
494.000
|
$260.000
|
$237.550
|
$480.000
|
$375.000
|
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
20.000
|
$800.000
|
$451.060
|
$720.000
|
$500.000
|
|
1
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
258.000
|
$85.000
|
$0.000
|
$71.500
|
$100.000
|
|
Totals: |
$30,839,105.620
|
$24,893,157.952
|
$31,356,505.260
|
$33,808,625.730
|