EXCAVATION (ROADWAY)
|
CY
|
2,006.000
|
$9.250
|
$24.500
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
4,472.000
|
$23.000
|
$24.500
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
AC
|
12.900
|
$500.000
|
$435.000
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
AC
|
7.100
|
$400.000
|
$350.000
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
AC
|
7.100
|
$400.000
|
$400.000
|
|
|
VEGETATIVE WATERING
|
MG
|
516.000
|
$27.000
|
$10.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY C)
|
SY
|
2,562.000
|
$1.500
|
$1.400
|
|
|
CEMENT
|
TON
|
270.000
|
$150.000
|
$172.000
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
24,523.000
|
$3.500
|
$3.900
|
|
|
D-GR HMA(SQ) TY-B PG64-22
|
TON
|
4,497.000
|
$75.000
|
$112.000
|
|
|
SUPERPAVE MIXTURES SP-D PG70-22
|
TON
|
6,295.000
|
$84.000
|
$107.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
90.000
|
$50.000
|
$120.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
1,646.000
|
$3.500
|
$3.500
|
|
|
TEMPORARY SPL SHORING
|
SF
|
690.000
|
$14.000
|
$68.000
|
|
|
CL C CONC (RAC-R)
|
CY
|
8.000
|
$1,000.000
|
$1,300.000
|
|
|
RIPRAP (CONC)(CL C)
|
CY
|
10.500
|
$500.000
|
$480.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
85.200
|
$400.000
|
$600.000
|
|
|
RAIL (TY T223)
|
LF
|
116.000
|
$105.000
|
$320.000
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
32.000
|
$90.000
|
$68.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
16.000
|
$300.000
|
$470.000
|
|
|
CONC BOX CULV (8 FT X 4 FT)(EXTEND)
|
LF
|
24.000
|
$900.000
|
$740.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
20.000
|
$105.000
|
$110.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
10.000
|
$135.000
|
$140.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 30 IN)
|
EA
|
2.000
|
$9,000.000
|
$5,300.000
|
|
|
WINGWALL (FW - 0) (HW=4 FT)
|
EA
|
2.000
|
$4,000.000
|
$6,400.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1) (C)
|
EA
|
2.000
|
$6,000.000
|
$5,800.000
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
8.000
|
$970.000
|
$950.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$900.000
|
$970.000
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
4.000
|
$1,300.000
|
$1,300.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$1,300.000
|
$1,300.000
|
|
|
REMOV & RE - LAY PIPE (18 IN)
|
LF
|
122.000
|
$70.000
|
$53.000
|
|
|
REMOV & RE - LAY PIPE (24 IN)
|
LF
|
63.000
|
$80.000
|
$64.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$163,841.400
|
$235,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
5.000
|
$7,000.000
|
$15,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
515.000
|
$28.000
|
$33.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
515.000
|
$7.000
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,300.000
|
$4.500
|
$2.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,300.000
|
$1.500
|
$0.900
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
1,520.000
|
$2.720
|
$4.400
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,520.000
|
$0.750
|
$1.200
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
300.000
|
$30.000
|
$65.800
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
300.000
|
$8.000
|
$15.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
300.000
|
$10.000
|
$15.000
|
|
|
INTRSCT, DRVWAYS, & TURNOUT (ACP)
|
SY
|
119.000
|
$29.000
|
$37.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
2,404.000
|
$16.000
|
$8.000
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
18,087.000
|
$0.550
|
$0.300
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
725.000
|
$25.000
|
$18.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
12.000
|
$2,000.000
|
$1,600.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
600.000
|
$4.000
|
$6.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
16.000
|
$2,600.000
|
$2,800.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$268.000
|
$450.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
4.000
|
$1,700.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$1,300.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
|
EA
|
4.000
|
$8,000.000
|
$12,000.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
1.000
|
$400.000
|
$320.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
2.000
|
$500.000
|
$640.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$630.000
|
$700.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$700.000
|
$710.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
1.000
|
$900.000
|
$970.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
12.000
|
$550.000
|
$370.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
6.000
|
$500.000
|
$500.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
19.000
|
$72.000
|
$95.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
|
EA
|
6.000
|
$140.000
|
$78.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
10.000
|
$32.000
|
$25.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
37.000
|
$31.000
|
$35.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
2.000
|
$110.000
|
$85.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,838.000
|
$0.900
|
$0.600
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
37,000.000
|
$0.350
|
$0.450
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
3,170.000
|
$0.560
|
$0.480
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
17,932.000
|
$0.360
|
$0.450
|
|
RE PM W/RET REQ TY II (Y) 4" (BRK)
|
LF
|
3,170.000
|
$0.170
|
$0.260
|
|
RE PM W/RET REQ TY II (Y) 4" (SLD)
|
LF
|
17,932.000
|
$0.170
|
$0.230
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
401.000
|
$3.500
|
$5.200
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
21,102.000
|
$0.500
|
$0.350
|
|
|
TMA (STATIONARY)
|
DAY
|
132.000
|
$75.000
|
$300.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
112.000
|
$50.000
|
$70.000
|
|
Totals: |
$1,837,035.410
|
$2,420,442.360
|