CLAY FM 1740 (1615-02-016)

Items: 81

County: CLAY
Length: N/A
Highway: FM 1740
District: WICHITA FALLS
Control Number: 1615-02-016
DBE Goal: N/A
Project: STP 1902(043)HES
Guaranty: N/A
Time: 97 WORKING DAYS
Engineer's Estimate: $1,637,724.36
Date: 08/06/2019 (6 years ago)
Contract Number: N/A
Type: SAFETY TRT FXD OBJ, ADDL SURF WIDTH, RUMBLE STRIPS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$1,637,724.36
$2,211,991.09
Over/Under Est: 35.06% $574,266.73
$2,225,483.33
Over/Under Est: 35.89% $587,758.97
Amt Left: 0.61% $13,492.24

Bid Items & Bid Tabulations

81 Total 0 of 81
CLAY  |  FM 1740  |  WICHITA FALLS  |  1615-02-016  |  08/06/2019  |  $1,637,724.36  |  STP 1902(043)HES  |  SAFETY TRT FXD OBJ, ADDL SURF WIDTH,...  |  97 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
A. L. HELMCAMP, INC.
ZACK BURKETT CO.
EXCAVATION (ROADWAY)
CY 1,705.000 $15.000 $33.000 $13.500
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 2,100.000 $30.000 $33.000 $14.800
DRILL SEEDING (PERM) (RURAL) (CLAY)
AC 12.900 $500.000 $560.000 $576.000
DRILL SEEDING (TEMP) (WARM)
AC 7.100 $400.000 $470.000 $292.000
DRILL SEEDING (TEMP) (COOL)
AC 7.100 $400.000 $470.000 $327.000
VEGETATIVE WATERING
MG 516.000 $27.000 $10.000 $30.000
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 2,562.000 $1.500 $1.400 $1.250
CEMENT
TON 270.000 $150.000 $172.000 $175.000
CEMENT TREAT(EXIST MATL)(8")
SY 24,523.000 $3.500 $6.900 $10.000
ASPH (AC-20-5TR)
GAL 26,321.000 $2.850 $4.100 $5.000
AGGR(TY-PB GR-3 SAC-B)
CY 607.000 $64.000 $140.000 $112.500
D-GR HMA(SQ) TY-B PG64-22
TON 4,497.000 $100.000 $105.000 $91.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 3,500.000 $30.000 $54.000 $45.000
TRENCH EXCAVATION PROTECTION
LF 24.000 $35.000 $21.000 $29.500
TEMPORARY SPL SHORING
SF 690.000 $45.000 $63.000 $88.500
CL C CONC (RAC-R)
CY 7.200 $1,000.000 $1,700.000 $1,475.000
RIPRAP (CONC)(5 IN)
CY 20.200 $500.000 $650.000 $590.000
RIPRAP (CONC)(CL C)
CY 16.800 $550.000 $1,300.000 $2,124.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 8.000 $220.000 $230.000 $354.000
RIPRAP (MOW STRIP)(4 IN)
CY 61.200 $400.000 $660.000 $826.000
RAIL (TY T223)
LF 116.000 $105.000 $450.000 $413.000
CMP (GAL STL 24 IN)
LF 32.000 $90.000 $105.000 $77.000
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
LF 16.000 $300.000 $730.000 $554.000
CONC BOX CULV (8 FT X 4 FT)(EXTEND)
LF 24.000 $900.000 $1,100.000 $1,003.000
RC PIPE (CL III)(24 IN)
LF 48.000 $105.000 $130.000 $177.000
RC PIPE (CL III)(30 IN)
LF 10.000 $135.000 $160.000 $260.000
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 2.000 $9,000.000 $8,200.000 $7,080.000
WINGWALL (FW - 0) (HW=4 FT)
EA 2.000 $4,000.000 $8,500.000 $6,490.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1) (C)
EA 4.000 $6,000.000 $7,200.000 $7,080.000
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 8.000 $970.000 $950.000 $1,180.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 8.000 $900.000 $1,000.000 $1,180.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 4.000 $1,300.000 $1,050.000 $1,416.000
SET (TY II) (24 IN) (RCP) (4: 1) (P)
EA 1.000 $1,600.000 $1,050.000 $1,416.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 8.000 $1,300.000 $1,050.000 $1,416.000
REMOV & RE - LAY PIPE (18 IN)
LF 122.000 $70.000 $65.000 $59.000
REMOV & RE - LAY PIPE (24 IN)
LF 63.000 $80.000 $85.000 $71.000
MOBILIZATION
LS 1.000 $145,420.000 $175,000.000 $175,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $7,000.000 $17,000.000 $4,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 515.000 $28.000 $26.000 $20.000
ROCK FILTER DAMS (REMOVE)
LF 515.000 $7.000 $4.000 $11.500
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,300.000 $4.500 $2.700 $2.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,300.000 $1.500 $1.000 $1.250
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 1,520.000 $2.720 $3.000 $2.600
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,520.000 $0.750 $0.500 $0.750
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 300.000 $30.000 $125.000 $140.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 300.000 $8.000 $25.000 $25.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 300.000 $10.000 $25.000 $32.000
INTRSCT, DRVWAYS, & TURNOUT (ACP)
SY 119.000 $29.000 $36.000 $60.000
DRIVEWAYS (BASE)
SY 2,404.000 $16.000 $15.000 $22.000
RUMBLE STRIPS (CENTERLINE)
LF 18,087.000 $0.550 $0.550 $0.890
MTL W-BEAM GD FEN (TIM POST)
LF 425.000 $25.000 $18.000 $27.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 12.000 $2,000.000 $1,400.000 $2,567.000
REMOVE METAL BEAM GUARD FENCE
LF 600.000 $4.000 $3.000 $3.500
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $2,600.000 $2,800.000 $3,540.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $268.000 $300.000 $354.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 4.000 $1,700.000 $2,500.000 $4,200.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $1,300.000 $1,000.000 $2,500.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 4.000 $8,000.000 $12,000.000 $17,700.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 1.000 $400.000 $265.000 $295.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 2.000 $500.000 $565.000 $679.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $630.000 $690.000 $1,121.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $700.000 $776.000 $1,150.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 1.000 $900.000 $1,000.000 $1,416.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 12.000 $550.000 $420.000 $867.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 6.000 $500.000 $450.000 $1,033.000
REMOVE SM RD SN SUP&AM
EA 19.000 $72.000 $80.000 $118.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
EA 6.000 $140.000 $65.000 $159.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 10.000 $32.000 $26.000 $24.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 37.000 $31.000 $35.000 $24.000
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
EA 6.000 $110.000 $70.000 $159.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,838.000 $0.900 $0.700 $1.000
REFL PAV MRK TY II (Y) 4" (BRK)
LF 3,170.000 $0.170 $0.270 $0.350
REFL PAV MRK TY II (Y) 4" (SLD)
LF 17,932.000 $0.170 $0.270 $0.350
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 37,000.000 $0.350 $0.450 $0.550
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 3,170.000 $0.560 $0.520 $0.600
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 17,932.000 $0.360 $0.450 $0.550
REFL PAV MRKR TY II-A-A
EA 401.000 $3.500 $5.000 $10.000
ELIM EXT PAV MRK & MRKS (4")
LF 21,102.000 $0.500 $0.350 $0.950
IRRIGATION GATE (24")
EA 2.000 $5,000.000 $8,500.000 $5,900.000
TMA (STATIONARY)
DAY 152.000 $170.000 $300.000 $295.000
TMA (MOBILE OPERATION)
HR 112.000 $50.000 $40.000 $88.500
Totals: $1,637,724.360 $2,211,991.090 $2,225,483.330