CLAY CR (0903-06-026)

Items: 33

County: CLAY
Length: N/A
Highway: CR
District: WICHITA FALLS
Control Number: 0903-06-026
DBE Goal: N/A
Project: BR 2023(539)
Guaranty: N/A
Time: 153 WORKING DAYS
Engineer's Estimate: $844,507.50
Date: 05/05/2023 (3 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
CALLAN COLTHARP
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$844,507.50
$815,142.41
Over/Under Est: -3.48% -$29,365.09
Over/Under Est: 21.45% $181,122.50
Amt Left: 25.82% $210,487.59
$1,250,585.00
Over/Under Est: 48.08% $406,077.50
Amt Left: 53.42% $435,442.59
Delta: -21.93% -$224,955.00
$1,789,055.00
Over/Under Est: 111.85% $944,547.50
Amt Left: 119.48% $973,912.59
Delta: -43.06% -$538,470.00

Bid Items & Bid Tabulations

33 Total 0 of 33
CLAY  |  CR  |  WICHITA FALLS  |  0903-06-026  |  05/05/2023  |  $844,507.50  |  BR 2023(539)  |  BRIDGE REPL  |  153 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
THK CONSTRUCTION LLC
HODGES AND SON CONSTRUCTION COMPANY, INC.
EARTH BUILDERS, L.P.
A. L. HELMCAMP, INC.
EXCAVATION (ROADWAY AND CHANNEL)
CY 245.000 $40.000 $25.000 $35.000 $50.000 $125.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 781.000 $40.000 $25.000 $40.000 $75.000 $110.000
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 1,030.000 $3.000 $2.780 $3.000 $6.000 $3.500
VEGETATIVE WATERING
MG 12.000 $100.000 $20.000 $1.000 $50.000 $160.000
PROOF ROLLING
HR 8.000 $50.000 $100.000 $1.000 $150.000 $130.000
FL BS (CMP IN PLC)(TYA GR1-2) (6")
SY 1,669.000 $45.000 $45.000 $35.000 $35.000 $55.000
DRILL SHAFT (24 IN)
LF 582.000 $170.000 $254.680 $210.000 $300.000 $350.000
CL C CONC (ABUT)
CY 36.800 $1,500.000 $1,200.000 $2,000.000 $2,500.000 $5,000.000
CL C CONC (RAIL FOUNDATION)
CY 4.200 $1,000.000 $1,000.000 $1,000.000 $1,500.000 $7,500.000
CL C CONC (MISC)
CY 7.200 $1,000.000 $1,000.000 $1,000.000 $1,500.000 $5,000.000
REINF CONC SLAB (SLAB BEAM)
SF 2,600.000 $35.000 $30.000 $40.000 $40.000 $47.000
PRESTR CONC SLAB BEAM (5SB15)
LF 495.000 $275.000 $203.250 $410.000 $340.000 $650.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 520.000 $150.000 $150.000 $200.000 $300.000 $300.000
RIPRAP (MOW STRIP)(4 IN)
CY 23.000 $700.000 $800.000 $600.000 $700.000 $1,700.000
RAIL (TY T631LS)
LF 278.000 $75.000 $78.750 $100.000 $150.000 $90.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 2.000 $20,000.000 $10,000.000 $30,000.000 $40,000.000 $45,000.000
REMOV STR (SMALL FENCE)
LF 410.000 $2.500 $4.000 $5.000 $10.000 $6.000
MOBILIZATION
LS 1.000 $73,932.500 $100,000.000 $90,000.000 $125,000.000 $170,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $3,000.000 $1,107.000 $4,700.000 $2,500.000 $10,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 160.000 $30.000 $40.000 $1.000 $70.000 $40.000
ROCK FILTER DAMS (REMOVE)
LF 160.000 $10.000 $1.000 $1.000 $25.000 $23.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,200.000 $2.000 $3.500 $1.000 $5.500 $3.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,200.000 $0.650 $1.000 $1.000 $2.000 $1.200
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 160.000 $3.500 $15.000 $8.000 $12.000 $9.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 160.000 $1.000 $1.000 $1.000 $2.000 $2.500
MTL W-BEAM GD FEN (TIM POST)
LF 175.000 $30.000 $24.680 $30.000 $35.000 $30.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $3,500.000 $3,255.000 $4,000.000 $3,800.000 $3,500.000
WIRE FENCE (TY C)
LF 410.000 $15.000 $25.000 $30.000 $20.000 $16.000
REMOVE SM RD SN SUP&AM
EA 2.000 $100.000 $250.000 $50.000 $350.000 $1,200.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 12.000 $100.000 $47.250 $30.000 $75.000 $55.000
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
AC 0.400 $20,000.000 $10,000.000 $12,000.000 $25,000.000 $56,000.000
TREE REMOVAL (12" - 18" DIA)
EA 16.000 $850.000 $1,000.000 $500.000 $1,200.000 $1,100.000
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 4.000 $350.000 $500.000 $800.000 $2,500.000 $500.000
Totals: $844,507.500 $815,142.410 $1,025,630.000 $1,250,585.000 $1,789,055.000