Show Job Controls
Bid Cobra

CLAY SH 148 (0391-05-025)

Items: 88

County: CLAY
Length: N/A
Highway: SH 148
District: WICHITA FALLS
Control Number: 0391-05-025
DBE Goal: N/A
Project: F 2023(923)
Guaranty: N/A
Time: 316 WORKING DAYS
Engineer's Estimate: $6,143,540.81
Date: 06/01/2023 (3 years ago)
Contract Number: N/A
Type: WIDEN ROAD - ADD SHOULDERS
Mail/Deliver Bids To: N/A
CALLAN COLTHARP
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$6,143,540.81
$6,879,609.71
Over/Under Est: 11.98% $736,068.90
$7,130,194.78
Over/Under Est: 16.06% $986,653.97
Amt Left: 3.64% $250,585.07
Over/Under Est: 25.62% $1,573,792.03
Amt Left: 12.18% $837,723.13
Delta: -8.23% -$587,138.06
Subcontractor Percentage Amount
W. S. CONSTRUCTION COMPANY 16.56% $1,049,675.38
COLD CREEK CONSTRUCTION, LTD 4.51% $285,871.74
DUSTIN ALLEN, INC. 3.01% $190,792.45
WOLFE CONSTRUCTION GROUP, INCORPORATED 1.20% $76,063.43
FLAT LINE, INC. 0.60% $38,031.72
MARCOMS CONSTRUCTION LLC 0.57% $36,130.13
FC TRAFFIC CONTROL, INC. 0.52% $32,960.82
SURFACE PREPARATION TECHNOLOGIES, LLC 0.27% $17,114.27
Total: 27.24% $1,726,639.94

Bid Items & Bid Tabulations

88 Total 0 of 88
CLAY  |  SH 148  |  WICHITA FALLS  |  0391-05-025  |  06/01/2023  |  $6,143,540.81  |  F 2023(923)  |  WIDEN ROAD - ADD SHOULDERS  |  316 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
A. L. HELMCAMP, INC.
JAGOE-PUBLIC COMPANY
EUROVIA ATLANTIC COAST LLC
REMOVING CONC (MISC)
SY 20.000 $50.000 $350.000 $37.500 $115.000
REMOVING CONCRETE(MOW STRIP)
LF 1,025.000 $10.000 $14.000 $16.500 $18.000
EXCAVATION (ROADWAY)
CY 3,352.000 $20.000 $35.000 $60.000 $52.000
EXCAVATION (CHANNEL)
CY 372.000 $17.000 $40.000 $60.000 $115.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 1,009.000 $25.000 $110.000 $60.000 $60.000
BROADCAST SEED (TEMP) (WARM)
SY 57,326.000 $0.150 $0.130 $0.120 $0.140
BROADCAST SEED (TEMP) (COOL)
SY 57,326.000 $0.150 $0.120 $0.120 $0.140
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 114,652.000 $0.130 $0.120 $0.120 $0.160
VEGETATIVE WATERING
MG 974.000 $20.000 $10.000 $90.000 $91.000
CEMENT
TON 528.000 $190.000 $280.000 $275.000 $290.000
CEMENT TREAT (SUBGRADE) (8")
SY 36,720.000 $4.500 $6.500 $7.200 $6.500
PRIME COAT (MC-30)
GAL 9,092.000 $5.800 $10.000 $2.500 $5.500
EMULS ASPH (PRIME)(MS-2 OR SS-1)
GAL 16,978.000 $5.000 $4.000 $2.500 $4.350
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")
SY 12,860.000 $40.000 $40.000 $42.000 $43.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 6,890.000 $50.000 $80.000 $79.000 $92.000
PLAN & TEXT ASPH CONC PAV(0" TO 3")
SY 2,825.000 $7.680 $5.000 $10.250 $8.000
TEMPORARY SPL SHORING
SF 396.000 $30.000 $90.000 $92.000 $85.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 6.000 $300.000 $260.000 $88.000 $250.000
RIPRAP (CONC)(5 IN)
CY 72.200 $500.000 $815.000 $500.000 $1,050.000
RIPRAP (MOW STRIP)(4 IN)
CY 117.000 $535.000 $840.000 $980.000 $885.000
RETROFIT RAIL (TY T131RC)
LF 422.000 $200.000 $242.500 $350.000 $259.000
CMP (GAL STL 24 IN)
LF 170.000 $50.000 $99.750 $130.000 $95.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 35.000 $400.000 $761.250 $560.000 $725.000
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
LF 36.000 $600.000 $892.500 $680.000 $850.000
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 40.000 $700.000 $1,050.000 $775.000 $1,000.000
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
LF 6.000 $750.000 $1,260.000 $1,100.000 $1,200.000
CONC BOX CULV (6 FT X 5 FT)(EXTEND)
LF 49.000 $1,000.000 $1,470.000 $1,100.000 $1,400.000
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
LF 20.000 $1,050.000 $1,575.000 $1,300.000 $1,500.000
CONC BOX CULV (10 FT X 8 FT)(EXTEND)
LF 17.000 $1,200.000 $2,415.000 $1,900.000 $2,300.000
CONC BOX CULV (5 FT X 6 FT) (EXTEND)
LF 16.000 $750.000 $1,470.000 $1,500.000 $1,400.000
WINGWALL (FW - 0) (HW=3 FT)
EA 8.000 $6,000.000 $8,085.000 $8,700.000 $7,700.000
WINGWALL (FW - 0) (HW=5 FT)
EA 2.000 $13,000.000 $17,325.000 $16,000.000 $16,500.000
WINGWALL (FW - 0) (HW=6 FT)
EA 2.000 $14,000.000 $23,625.000 $20,000.000 $22,500.000
WINGWALL (FW - 0) (HW=7 FT)
EA 2.000 $15,000.000 $24,150.000 $22,000.000 $23,000.000
WINGWALL (FW - S) (HW=4 FT)
EA 2.000 $9,000.000 $17,325.000 $17,000.000 $16,500.000
WINGWALL (FW - S) (HW=7 FT)
EA 2.000 $15,000.000 $29,400.000 $28,000.000 $28,000.000
WINGWALL (PW - 2) (HW=10 FT)
EA 2.000 $25,000.000 $88,200.000 $77,000.000 $84,000.000
WINGWALL (FW-0) (HW=7FT) (MOD)
EA 2.000 $15,000.000 $31,500.000 $50,000.000 $30,000.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 10.000 $1,600.000 $1,575.000 $2,500.000 $1,500.000
CLEAN EXIST CULVERTS
EA 12.000 $2,500.000 $3,150.000 $4,000.000 $4,000.000
REMOV STR (PIPE)
LF 170.000 $30.000 $15.750 $29.500 $15.000
REMOV STR (SMALL FENCE)
LF 300.000 $8.000 $15.000 $4.500 $25.000
MOBILIZATION
LS 1.000 $520,000.000 $400,000.000 $710,000.000 $475,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 19.000 $10,000.000 $13,000.000 $25,500.000 $27,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 360.000 $35.000 $30.000 $30.000 $37.000
ROCK FILTER DAMS (REMOVE)
LF 360.000 $10.000 $30.000 $10.000 $12.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 6,395.000 $2.500 $3.000 $3.500 $3.600
TEMP SEDMT CONT FENCE (REMOVE)
LF 6,395.000 $0.500 $1.000 $1.000 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 4,030.000 $3.000 $3.000 $3.500 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 4,030.000 $1.000 $1.000 $1.000 $1.000
INTERSECTIONS (ACP)
SY 349.000 $50.000 $70.000 $15.750 $58.000
DRIVEWAYS (ACP)
SY 1,389.000 $50.000 $50.000 $35.000 $54.000
TURNOUTS (ACP)
SY 670.000 $75.000 $25.000 $35.000 $106.000
DRIVEWAYS (BASE)
SY 3,448.000 $25.000 $20.000 $15.000 $42.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 67,340.000 $0.340 $0.240 $0.120 $0.180
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 33,670.000 $0.190 $0.310 $0.120 $0.180
MTL W-BEAM GD FEN (TIM POST)
LF 1,000.000 $30.000 $36.000 $26.000 $22.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $2,500.000 $1,800.000 $2,100.000 $1,795.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 75.000 $60.000 $92.000 $150.000 $125.000
REMOVE METAL BEAM GUARD FENCE
LF 575.000 $3.000 $2.000 $3.600 $3.000
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $3,000.000 $3,000.000 $3,300.000 $2,750.000
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $450.000 $300.000 $270.000 $225.000
WIRE FENCE (TY C)
LF 500.000 $35.000 $11.000 $32.500 $41.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 10.000 $325.000 $288.750 $360.000 $303.000
RELOCATE EXISTING MAILBOX
EA 1.000 $450.000 $472.500 $350.000 $299.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $750.000 $792.750 $830.000 $698.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 3.000 $750.000 $1,050.000 $1,100.000 $944.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 12.000 $775.000 $1,102.500 $1,100.000 $939.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 20.000 $400.000 $630.000 $580.000 $487.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 2.000 $450.000 $498.750 $640.000 $544.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 28.000 $25.000 $26.250 $17.750 $15.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 32.000 $35.000 $31.500 $29.500 $25.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 16.000 $75.000 $35.700 $26.000 $22.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 16.000 $50.000 $126.000 $75.000 $63.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,783.000 $1.000 $1.000 $2.600 $1.500
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 67,440.000 $0.500 $0.550 $0.600 $0.730
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 5,780.000 $0.500 $0.550 $0.600 $0.850
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 24,040.000 $0.500 $0.550 $0.600 $0.730
REFL PAV MRKR TY II-A-A
EA 677.000 $3.750 $4.360 $4.900 $5.470
TREE TRIMMING / BRUSH REMOVAL
MI 2.510 $15,000.000 $12,500.000 $14,800.000 $10,800.000
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
AC 44.430 $10,000.000 $6,000.000 $1,200.000 $5,235.000
TREE REMOVAL (18" - 24" DIA)
EA 4.000 $270.000 $3,500.000 $890.000 $2,995.000
TREE AND BRUSH REMOVAL
AC 1.000 $500.000 $9,000.000 $3,000.000 $8,250.000
D-GR HMA TY-B PG64-22
TON 7,258.000 $104.000 $109.000 $100.000 $109.000
D-GR HMA TY-D PG70-28
TON 11,594.000 $125.000 $116.000 $120.000 $137.000
BONDING COURSE
GAL 6,320.000 $4.400 $5.000 $1.750 $3.500
TMA (STATIONARY)
DAY 330.000 $250.000 $500.000 $300.000 $305.000
TMA (MOBILE OPERATION)
DAY 5.000 $250.000 $750.000 $200.000 $825.000
Totals: $6,143,540.810 $6,879,609.710 $7,130,194.780 $7,717,332.840