REMOVING CONC (MISC)
|
SY
|
20.000
|
$50.000
|
$350.000
|
$37.500
|
$115.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
1,025.000
|
$10.000
|
$14.000
|
$16.500
|
$18.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
3,352.000
|
$20.000
|
$35.000
|
$60.000
|
$52.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
372.000
|
$17.000
|
$40.000
|
$60.000
|
$115.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
1,009.000
|
$25.000
|
$110.000
|
$60.000
|
$60.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
57,326.000
|
$0.150
|
$0.130
|
$0.120
|
$0.140
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
57,326.000
|
$0.150
|
$0.120
|
$0.120
|
$0.140
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
114,652.000
|
$0.130
|
$0.120
|
$0.120
|
$0.160
|
|
|
VEGETATIVE WATERING
|
MG
|
974.000
|
$20.000
|
$10.000
|
$90.000
|
$91.000
|
|
|
CEMENT
|
TON
|
528.000
|
$190.000
|
$280.000
|
$275.000
|
$290.000
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
36,720.000
|
$4.500
|
$6.500
|
$7.200
|
$6.500
|
|
|
PRIME COAT (MC-30)
|
GAL
|
9,092.000
|
$5.800
|
$10.000
|
$2.500
|
$5.500
|
|
|
EMULS ASPH (PRIME)(MS-2 OR SS-1)
|
GAL
|
16,978.000
|
$5.000
|
$4.000
|
$2.500
|
$4.350
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")
|
SY
|
12,860.000
|
$40.000
|
$40.000
|
$42.000
|
$43.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
|
SY
|
6,890.000
|
$50.000
|
$80.000
|
$79.000
|
$92.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 3")
|
SY
|
2,825.000
|
$7.680
|
$5.000
|
$10.250
|
$8.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
396.000
|
$30.000
|
$90.000
|
$92.000
|
$85.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
6.000
|
$300.000
|
$260.000
|
$88.000
|
$250.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
72.200
|
$500.000
|
$815.000
|
$500.000
|
$1,050.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
117.000
|
$535.000
|
$840.000
|
$980.000
|
$885.000
|
|
|
RETROFIT RAIL (TY T131RC)
|
LF
|
422.000
|
$200.000
|
$242.500
|
$350.000
|
$259.000
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
170.000
|
$50.000
|
$99.750
|
$130.000
|
$95.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
35.000
|
$400.000
|
$761.250
|
$560.000
|
$725.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
|
LF
|
36.000
|
$600.000
|
$892.500
|
$680.000
|
$850.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
|
LF
|
40.000
|
$700.000
|
$1,050.000
|
$775.000
|
$1,000.000
|
|
|
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
|
LF
|
6.000
|
$750.000
|
$1,260.000
|
$1,100.000
|
$1,200.000
|
|
|
CONC BOX CULV (6 FT X 5 FT)(EXTEND)
|
LF
|
49.000
|
$1,000.000
|
$1,470.000
|
$1,100.000
|
$1,400.000
|
|
|
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
|
LF
|
20.000
|
$1,050.000
|
$1,575.000
|
$1,300.000
|
$1,500.000
|
|
|
CONC BOX CULV (10 FT X 8 FT)(EXTEND)
|
LF
|
17.000
|
$1,200.000
|
$2,415.000
|
$1,900.000
|
$2,300.000
|
|
|
CONC BOX CULV (5 FT X 6 FT) (EXTEND)
|
LF
|
16.000
|
$750.000
|
$1,470.000
|
$1,500.000
|
$1,400.000
|
|
|
WINGWALL (FW - 0) (HW=3 FT)
|
EA
|
8.000
|
$6,000.000
|
$8,085.000
|
$8,700.000
|
$7,700.000
|
|
|
WINGWALL (FW - 0) (HW=5 FT)
|
EA
|
2.000
|
$13,000.000
|
$17,325.000
|
$16,000.000
|
$16,500.000
|
|
|
WINGWALL (FW - 0) (HW=6 FT)
|
EA
|
2.000
|
$14,000.000
|
$23,625.000
|
$20,000.000
|
$22,500.000
|
|
|
WINGWALL (FW - 0) (HW=7 FT)
|
EA
|
2.000
|
$15,000.000
|
$24,150.000
|
$22,000.000
|
$23,000.000
|
|
|
WINGWALL (FW - S) (HW=4 FT)
|
EA
|
2.000
|
$9,000.000
|
$17,325.000
|
$17,000.000
|
$16,500.000
|
|
|
WINGWALL (FW - S) (HW=7 FT)
|
EA
|
2.000
|
$15,000.000
|
$29,400.000
|
$28,000.000
|
$28,000.000
|
|
|
WINGWALL (PW - 2) (HW=10 FT)
|
EA
|
2.000
|
$25,000.000
|
$88,200.000
|
$77,000.000
|
$84,000.000
|
|
|
WINGWALL (FW-0) (HW=7FT) (MOD)
|
EA
|
2.000
|
$15,000.000
|
$31,500.000
|
$50,000.000
|
$30,000.000
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
10.000
|
$1,600.000
|
$1,575.000
|
$2,500.000
|
$1,500.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
12.000
|
$2,500.000
|
$3,150.000
|
$4,000.000
|
$4,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
170.000
|
$30.000
|
$15.750
|
$29.500
|
$15.000
|
|
|
REMOV STR (SMALL FENCE)
|
LF
|
300.000
|
$8.000
|
$15.000
|
$4.500
|
$25.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$520,000.000
|
$400,000.000
|
$710,000.000
|
$475,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
19.000
|
$10,000.000
|
$13,000.000
|
$25,500.000
|
$27,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
360.000
|
$35.000
|
$30.000
|
$30.000
|
$37.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
360.000
|
$10.000
|
$30.000
|
$10.000
|
$12.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
6,395.000
|
$2.500
|
$3.000
|
$3.500
|
$3.600
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
6,395.000
|
$0.500
|
$1.000
|
$1.000
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
4,030.000
|
$3.000
|
$3.000
|
$3.500
|
$6.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
4,030.000
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
349.000
|
$50.000
|
$70.000
|
$15.750
|
$58.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,389.000
|
$50.000
|
$50.000
|
$35.000
|
$54.000
|
|
|
TURNOUTS (ACP)
|
SY
|
670.000
|
$75.000
|
$25.000
|
$35.000
|
$106.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
3,448.000
|
$25.000
|
$20.000
|
$15.000
|
$42.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
67,340.000
|
$0.340
|
$0.240
|
$0.120
|
$0.180
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
33,670.000
|
$0.190
|
$0.310
|
$0.120
|
$0.180
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,000.000
|
$30.000
|
$36.000
|
$26.000
|
$22.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$2,500.000
|
$1,800.000
|
$2,100.000
|
$1,795.000
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
75.000
|
$60.000
|
$92.000
|
$150.000
|
$125.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
575.000
|
$3.000
|
$2.000
|
$3.600
|
$3.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
12.000
|
$3,000.000
|
$3,000.000
|
$3,300.000
|
$2,750.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
8.000
|
$450.000
|
$300.000
|
$270.000
|
$225.000
|
|
|
WIRE FENCE (TY C)
|
LF
|
500.000
|
$35.000
|
$11.000
|
$32.500
|
$41.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
10.000
|
$325.000
|
$288.750
|
$360.000
|
$303.000
|
|
|
RELOCATE EXISTING MAILBOX
|
EA
|
1.000
|
$450.000
|
$472.500
|
$350.000
|
$299.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$750.000
|
$792.750
|
$830.000
|
$698.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
3.000
|
$750.000
|
$1,050.000
|
$1,100.000
|
$944.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
12.000
|
$775.000
|
$1,102.500
|
$1,100.000
|
$939.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
20.000
|
$400.000
|
$630.000
|
$580.000
|
$487.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
2.000
|
$450.000
|
$498.750
|
$640.000
|
$544.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
28.000
|
$25.000
|
$26.250
|
$17.750
|
$15.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
32.000
|
$35.000
|
$31.500
|
$29.500
|
$25.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
16.000
|
$75.000
|
$35.700
|
$26.000
|
$22.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
16.000
|
$50.000
|
$126.000
|
$75.000
|
$63.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,783.000
|
$1.000
|
$1.000
|
$2.600
|
$1.500
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
67,440.000
|
$0.500
|
$0.550
|
$0.600
|
$0.730
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
5,780.000
|
$0.500
|
$0.550
|
$0.600
|
$0.850
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
24,040.000
|
$0.500
|
$0.550
|
$0.600
|
$0.730
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
677.000
|
$3.750
|
$4.360
|
$4.900
|
$5.470
|
|
|
TREE TRIMMING / BRUSH REMOVAL
|
MI
|
2.510
|
$15,000.000
|
$12,500.000
|
$14,800.000
|
$10,800.000
|
|
|
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
|
AC
|
44.430
|
$10,000.000
|
$6,000.000
|
$1,200.000
|
$5,235.000
|
|
|
TREE REMOVAL (18" - 24" DIA)
|
EA
|
4.000
|
$270.000
|
$3,500.000
|
$890.000
|
$2,995.000
|
|
|
TREE AND BRUSH REMOVAL
|
AC
|
1.000
|
$500.000
|
$9,000.000
|
$3,000.000
|
$8,250.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
7,258.000
|
$104.000
|
$109.000
|
$100.000
|
$109.000
|
|
|
D-GR HMA TY-D PG70-28
|
TON
|
11,594.000
|
$125.000
|
$116.000
|
$120.000
|
$137.000
|
|
|
BONDING COURSE
|
GAL
|
6,320.000
|
$4.400
|
$5.000
|
$1.750
|
$3.500
|
|
|
TMA (STATIONARY)
|
DAY
|
330.000
|
$250.000
|
$500.000
|
$300.000
|
$305.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
5.000
|
$250.000
|
$750.000
|
$200.000
|
$825.000
|
|
Totals: |
$6,143,540.810
|
$6,879,609.710
|
$7,130,194.780
|
$7,717,332.840
|