Show Job Controls
Bid Cobra

CLAY SH 148 (0391-04-030)

Items: 78

County: CLAY
Length: N/A
Highway: SH 148
District: WICHITA FALLS
Control Number: 0391-04-030
DBE Goal: N/A
Project: STP 2022(627)HES
Guaranty: N/A
Time: 181 WORKING DAYS
Engineer's Estimate: $3,476,644.50
Date: 06/02/2022 (4 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
CALLAN COLTHARP
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$3,476,644.50
$3,432,425.50
Over/Under Est: -1.27% -$44,219.00
Over/Under Est: 19.74% $686,337.22
Amt Left: 21.28% $730,556.22
$4,224,697.44
Over/Under Est: 21.52% $748,052.94
Amt Left: 23.08% $792,271.94
Delta: -1.48% -$61,715.72
$4,237,830.72
Over/Under Est: 21.89% $761,186.22
Amt Left: 23.46% $805,405.22
Delta: -0.31% -$13,133.28

Bid Items & Bid Tabulations

78 Total 0 of 78
CLAY  |  SH 148  |  WICHITA FALLS  |  0391-04-030  |  06/02/2022  |  $3,476,644.50  |  STP 2022(627)HES  |  HAZARD ELIM & SAFETY  |  181 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ZACK BURKETT CO.
EUROVIA ATLANTIC COAST LLC
A. L. HELMCAMP, INC.
JAGOE-PUBLIC COMPANY
PREPARING ROW(TREE)(12" TO 24" DIA)
EA 8.000 $1,500.000 $1,175.000 $1,800.000 $2,000.000 $630.000
REMOVING CONC (DRIVEWAYS)
SY 266.000 $20.000 $35.000 $35.000 $27.000 $21.250
EXCAVATION (ROADWAY)
CY 3,232.000 $15.000 $14.500 $35.000 $36.000 $36.500
EXCAVATION (CHANNEL)
CY 75.000 $40.000 $100.000 $80.000 $75.000 $70.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 2,009.000 $25.000 $47.300 $58.000 $70.000 $27.750
BLOCK SODDING
SY 320.000 $5.500 $8.400 $14.760 $8.500 $16.500
BROADCAST SEED (TEMP) (WARM)
SY 45,440.000 $0.100 $0.130 $0.250 $0.120 $0.250
BROADCAST SEED (TEMP) (COOL)
SY 45,440.000 $0.100 $0.150 $0.250 $0.140 $0.250
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 90,871.000 $0.150 $0.120 $0.250 $0.110 $0.300
VEGETATIVE WATERING
MG 763.400 $30.000 $19.000 $47.000 $15.000 $55.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 2,212.000 $1.250 $1.750 $1.710 $1.800 $1.900
CEMENT
TON 320.000 $160.000 $233.000 $265.000 $190.000 $205.000
CEMENT TREAT (SUBGRADE) (8")
SY 29,625.000 $5.500 $2.300 $3.500 $4.500 $4.600
PRIME COAT (MC-30)
GAL 7,406.000 $4.250 $5.250 $7.000 $7.000 $4.000
EMULS ASPH (PRIME)(MS-2 OR SS-1)
GAL 6,037.000 $3.500 $5.000 $3.500 $5.000 $4.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 5,079.000 $50.000 $58.000 $61.000 $68.000 $62.000
PLANE ASPH CONC PAV(0" TO 3")
SY 2,163.000 $3.000 $3.600 $8.000 $6.000 $5.600
TEMPORARY SPL SHORING
SF 40.000 $25.000 $89.250 $85.000 $90.000 $99.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 35.000 $200.000 $126.000 $200.000 $125.000 $300.000
RIPRAP (CONC)(5 IN)
CY 36.200 $550.000 $630.000 $775.000 $640.000 $680.000
RIPRAP (MOW STRIP)(4 IN)
CY 88.000 $600.000 $735.000 $672.000 $650.000 $770.000
CMP (GAL STL 18 IN)
LF 367.000 $90.000 $78.750 $80.000 $79.000 $100.000
CMP (GAL STL 30 IN)
LF 30.000 $195.000 $105.000 $93.000 $110.000 $120.000
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
LF 16.000 $450.000 $714.000 $750.000 $715.000 $530.000
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
LF 31.500 $500.000 $745.500 $900.000 $750.000 $520.000
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 64.500 $650.000 $777.000 $980.000 $780.000 $510.000
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
LF 32.000 $800.000 $1,155.000 $1,400.000 $1,200.000 $710.000
CONC BOX CULV (6 FT X 2 FT) (EXTEND)
LF 16.750 $750.000 $924.000 $1,220.000 $930.000 $700.000
WINGWALL (FW - 0) (HW=3 FT)
EA 6.000 $6,000.000 $6,300.000 $4,000.000 $6,400.000 $8,800.000
WINGWALL (FW - 0) (HW=4 FT)
EA 2.000 $7,000.000 $9,870.000 $6,000.000 $9,900.000 $16,400.000
WINGWALL (FW - 0) (HW=7 FT)
EA 2.000 $11,500.000 $19,950.000 $13,000.000 $20,000.000 $25,400.000
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 24.000 $1,250.000 $1,050.000 $975.000 $1,100.000 $1,300.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 2.000 $1,800.000 $1,470.000 $1,375.000 $1,500.000 $1,400.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $2,500.000 $1,365.000 $1,325.000 $1,400.000 $1,400.000
SET (TY II) (30 IN) (CMP) (6: 1) (P)
EA 2.000 $3,000.000 $3,675.000 $2,650.000 $3,700.000 $2,500.000
CLEAN EXIST CULVERTS
EA 1.000 $4,500.000 $5,250.000 $2,000.000 $5,300.000 $3,500.000
REMOV STR (WINGWALL)
EA 10.000 $1,500.000 $525.000 $825.000 $530.000 $1,100.000
REMOV STR (HEADWALL)
EA 2.000 $1,000.000 $525.000 $800.000 $530.000 $3,100.000
REMOV STR (PIPE)
LF 395.000 $25.000 $15.750 $12.000 $16.000 $31.000
MOBILIZATION
LS 1.000 $308,558.000 $230,000.000 $220,000.000 $400,000.000 $390,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $7,500.000 $4,200.000 $20,000.000 $10,200.000 $23,000.000
TEMP PAVED FLUME (INSTALL)
SY 174.000 $20.000 $35.000 $75.000 $25.000 $56.000
TEMP PAVED FLUME (REMOVE)
SY 174.000 $10.000 $15.000 $25.000 $10.000 $31.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 810.000 $3.000 $4.200 $5.910 $4.100 $6.600
TEMP SEDMT CONT FENCE (REMOVE)
LF 810.000 $1.000 $1.050 $1.500 $1.000 $1.700
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 3,275.000 $3.500 $3.000 $4.880 $3.000 $5.400
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,275.000 $1.000 $0.840 $0.750 $0.900 $0.850
DRIVEWAYS (CONC)
SY 253.000 $90.000 $115.500 $108.000 $116.000 $140.000
DRIVEWAYS (ACP)
SY 1,300.000 $45.000 $24.500 $50.000 $39.000 $42.250
TURNOUTS (ACP)
SY 374.000 $70.000 $18.750 $75.000 $37.000 $36.000
DRIVEWAYS (BASE)
SY 3,664.000 $25.000 $10.000 $27.000 $20.000 $29.500
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 54,015.000 $0.150 $0.210 $0.200 $0.170 $0.110
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 27,007.000 $0.250 $0.210 $0.200 $0.170 $0.110
MTL W-BEAM GD FEN (TIM POST)
LF 600.000 $25.000 $32.030 $28.500 $28.000 $30.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 225.000 $75.000 $71.930 $107.000 $82.000 $87.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $2,850.000 $3,675.000 $3,073.000 $3,200.000 $3,300.000
WIRE FENCE (TY D)
LF 160.000 $20.000 $35.000 $35.000 $16.000 $7.800
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 18.000 $275.000 $309.750 $275.000 $290.000 $310.000
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 3.000 $300.000 $367.500 $300.000 $320.000 $330.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 1.000 $600.000 $1,260.000 $930.000 $980.000 $1,000.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 11.000 $750.000 $1,155.000 $820.000 $860.000 $910.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 4.000 $800.000 $1,312.500 $950.000 $1,000.000 $1,050.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 20.000 $375.000 $766.500 $430.000 $450.000 $480.000
REMOVE SM RD SN SUP&AM
EA 36.000 $90.000 $105.000 $100.000 $110.000 $110.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 12.000 $45.000 $50.000 $45.000 $34.000 $35.500
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 10.000 $100.000 $157.500 $120.000 $125.000 $130.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,983.000 $1.000 $1.000 $1.250 $0.600 $1.300
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 54,212.000 $0.350 $0.470 $0.450 $0.430 $0.500
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 6,800.000 $0.400 $0.470 $0.450 $0.470 $0.500
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 18,411.000 $0.400 $0.470 $0.450 $0.430 $0.500
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 50.000 $15.000 $14.180 $13.500 $26.000 $15.000
REFL PAV MRKR TY II-A-A
EA 545.000 $3.500 $5.250 $5.000 $5.300 $5.600
D-GR HMA TY-B PG64-22
TON 5,874.000 $95.000 $96.500 $97.500 $106.000 $97.000
SP MIXES SP-D SAC-B PG70-28
TON 9,614.000 $105.000 $112.500 $128.750 $134.000 $125.000
BONDING COURSE
GAL 5,127.000 $3.750 $5.000 $4.300 $4.600 $4.000
TMA (STATIONARY)
DAY 261.000 $250.000 $100.000 $400.000 $200.000 $225.000
TMA (MOBILE OPERATION)
DAY 12.000 $275.000 $1.000 $735.000 $150.000 $300.000
REML & DISPL DRIFTWOOD & DEBRIS
CY 20.000 $125.000 $100.000 $155.000 $250.000 $170.000
Totals: $3,476,644.500 $3,432,425.500 $4,162,981.720 $4,224,697.440 $4,237,830.720