Show Job Controls
Bid Cobra

CLAY US 287 (0224-02-049)

Items: 56

County: CLAY
Length: N/A
Highway: US 287
District: WICHITA FALLS
Control Number: 0224-02-049
DBE Goal: N/A
Project: NH 2021(251)
Guaranty: N/A
Time: 70 WORKING DAYS
Engineer's Estimate: $3,412,649.20
Date: 01/07/2021 (5 years ago)
Contract Number: N/A
Type: MILL AND OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (5)
E
Engineer's Estimate
$3,412,649.20
$2,554,472.70
Over/Under Est: -25.15% -$858,176.50
Over/Under Est: -23.34% -$796,482.96
Amt Left: 2.42% $61,693.54
Over/Under Est: -19.8% -$675,700.97
Amt Left: 7.14% $182,475.53
Delta: -4.62% -$120,781.99
Over/Under Est: -19.77% -$674,687.98
Amt Left: 7.18% $183,488.52
Delta: -0.04% -$1,012.99
Over/Under Est: -6.91% -$235,723.08
Amt Left: 24.37% $622,453.42
Delta: -16.03% -$438,964.90

Bid Items & Bid Tabulations

56 Total 0 of 56
CLAY  |  US 287  |  WICHITA FALLS  |  0224-02-049  |  01/07/2021  |  $3,412,649.20  |  NH 2021(251)  |  MILL AND OVERLAY  |  70 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAGOE-PUBLIC COMPANY
EUROVIA ATLANTIC COAST LLC
PEACHTREE CONSTRUCTION, LTD.
AUSTIN BRIDGE & ROAD SERVICES, LP
TEXAS MATERIALS GROUP, INC.
REMOVING CONCRETE(MOW STRIP)
LF 500.000 $15.000 $6.830 $16.000 $31.500 $30.000 $13.500
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 52.000 $30.000 $83.460 $75.000 $65.000 $104.000 $73.000
BACKFILL (TY A OR B)
STA 347.000 $300.000 $145.000 $100.000 $120.000 $171.000 $220.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 268.000 $0.150 $5.530 $5.250 $7.500 $7.000 $5.800
BROADCAST SEED (TEMP) (WARM)
SY 134.000 $0.150 $7.850 $7.460 $7.500 $7.000 $8.200
BROADCAST SEED (TEMP) (COOL)
SY 134.000 $0.150 $7.850 $7.460 $7.500 $7.000 $8.200
VEGETATIVE WATERING
MG 3.000 $30.000 $160.660 $285.000 $350.000 $100.000 $24.000
EMULS ASPH (EROSN CONT)(SS-1)
GAL 1,899.000 $3.500 $3.680 $3.500 $3.700 $2.500 $4.200
ASPH (AC-20-5TR)
GAL 58,494.000 $3.500 $2.480 $2.360 $2.950 $2.360 $2.950
AGGR(TY-PB GR-4 SAC-B)
CY 1,190.000 $100.000 $84.220 $80.000 $115.000 $80.000 $168.000
PFC (ASPHALT) PG76-22
TON 621.000 $110.000 $585.000 $102.000 $105.000 $101.000 $130.000
PFC-C (AGGREGATE)(PG76 MIX) SAC-A
TON 9,717.000 $125.000 $70.500 $102.000 $105.000 $101.000 $130.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 21,703.000 $35.000 $19.750 $18.000 $19.000 $24.200 $20.400
PLANE ASPH CONC PAV(0" TO 2")
SY 95,766.000 $2.500 $1.150 $1.350 $1.150 $1.520 $1.140
RIPRAP (MOW STRIP)(4 IN)
CY 36.000 $675.000 $525.000 $610.000 $760.000 $700.000 $675.000
CLEANING AND SEALING EXISTING JOINTS
LF 178.000 $30.000 $48.430 $46.000 $120.000 $42.000 $43.000
RETROFIT RAIL (TY SSTR)
LF 266.000 $250.000 $174.760 $240.000 $215.000 $230.000 $325.000
MOBILIZATION
LS 1.000 $310,395.000 $250,000.000 $260,000.000 $211,000.000 $273,000.000 $293,218.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $8,000.000 $2,500.000 $23,500.000 $25,500.000 $20,000.000 $22,800.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 750.000 $4.500 $3.790 $3.600 $5.500 $5.000 $3.700
BIODEG EROSN CONT LOGS (REMOVE)
LF 750.000 $1.000 $0.950 $0.900 $1.050 $1.000 $0.920
PORT CTB (FUR & INST)(SGL SLOPE)(TY 2)
LF 1,110.000 $1.000 $44.220 $40.000 $48.000 $9.810 $43.000
PORT CTB (MOVE)(SGL SLP)(TY 2)
LF 1,110.000 $3.000 $10.530 $5.000 $11.000 $3.570 $10.500
PORT CTB (REMOVE)(SGL SLP)(TY 2)
LF 1,110.000 $5.000 $18.950 $10.000 $20.000 $10.520 $18.550
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 69,074.000 $0.150 $0.220 $0.210 $0.120 $0.330 $0.160
MTL W-BEAM GD FEN (TIM POST)
LF 500.000 $25.000 $30.000 $22.000 $25.500 $18.710 $30.000
REMOVE METAL BEAM GUARD FENCE
LF 500.000 $3.500 $5.260 $3.000 $2.200 $1.500 $5.450
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $2,600.000 $2,658.180 $2,850.000 $2,800.000 $1,950.000 $2,700.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $300.000 $263.190 $300.000 $440.000 $100.000 $270.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 1.000 $2,000.000 $1,579.110 $500.000 $2,400.000 $1,000.000 $1,600.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $1,500.000 $1,315.930 $1,500.000 $1,100.000 $850.000 $1,300.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 1.000 $7,500.000 $8,421.930 $3,000.000 $10,000.000 $8,625.000 $8,400.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 88.000 $450.000 $621.120 $610.000 $700.000 $500.000 $610.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 28.000 $700.000 $815.870 $920.000 $900.000 $950.000 $800.000
REMOVE SM RD SN SUP&AM
EA 67.000 $100.000 $78.960 $90.000 $86.000 $40.000 $78.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
EA 22.000 $125.000 $52.640 $70.000 $135.000 $21.500 $52.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 3.000 $30.000 $29.480 $30.000 $33.500 $13.500 $29.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 3.000 $30.000 $29.480 $30.000 $33.000 $13.500 $29.000
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
EA 3.000 $35.000 $47.370 $35.000 $39.000 $20.500 $47.000
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
EA 3.000 $35.000 $47.370 $35.000 $39.000 $20.500 $47.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 8,934.000 $0.300 $0.210 $0.200 $0.260 $0.220 $0.210
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 35,947.000 $0.300 $0.230 $0.350 $0.220 $0.170 $0.230
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 38,557.000 $0.300 $0.250 $0.350 $0.220 $0.170 $0.250
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 5,182.000 $2.000 $1.150 $1.250 $2.300 $1.560 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 550.000 $1.000 $0.950 $1.000 $1.100 $1.000 $0.950
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 8,934.000 $0.600 $0.450 $0.480 $0.450 $0.420 $0.450
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 34,537.000 $0.500 $0.410 $0.440 $0.370 $0.340 $0.410
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 36,662.000 $0.500 $0.410 $0.440 $0.370 $0.340 $0.410
PREFAB PAV MRK TY C (W) (ARROW)
EA 9.000 $250.000 $315.820 $185.000 $270.000 $255.000 $315.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 32.000 $35.000 $42.110 $55.000 $52.000 $48.000 $42.000
REFL PAV MRKR TY I-A
EA 8.000 $3.500 $10.530 $5.000 $7.500 $7.000 $10.500
REFL PAV MRKR TY II-C-R
EA 489.000 $3.500 $4.210 $3.600 $4.000 $3.650 $4.150
ELIM EXT PAV MRK & MRKS (4")
LF 1,306.000 $0.400 $1.050 $0.500 $0.600 $0.550 $1.050
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 125.000 $200.000 $69.930 $85.000 $65.000 $81.190 $47.000
TMA (STATIONARY)
DAY 70.000 $200.000 $233.420 $305.000 $220.000 $386.750 $285.000
TMA (MOBILE OPERATION)
DAY 7.000 $250.000 $915.130 $560.000 $600.000 $986.160 $285.000
Totals: $3,412,649.200 $2,554,472.700 $2,616,166.240 $2,736,948.230 $2,737,961.220 $3,176,926.120