Show Job Controls
Bid Cobra

CHILDRESS US0287 (6477-21-001)

Items: 13

County: CHILDRESS
Length: 0.0100 MILES
Highway: US0287
District: CHILDRESS
Control Number: 6477-21-001
DBE Goal: N/A
Project: RMC - A00212965
Guaranty: $10,000.00
Time: 730 CALENDAR DAYS
Engineer's Estimate: $481,100.00
Date: 01/15/2025 (1 year ago)
Contract Number: 1252501
Type: METAL BEAM GUARD FENCE REPAIR
Project ID: A00212965
Project Description: DISTRICTWIDE METAL BEAM GUARD FENCE REPAIR CALLOUT CONTRACT.
Mail/Deliver Bids To: N/A
MATTHEW HERBSTRITT
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$481,100.00
$331,022.00
Over/Under Est: -31.19% -$150,078.00
Over/Under Est: -13.29% -$63,956.00
Amt Left: 26.02% $86,122.00
$480,000.00
Over/Under Est: -0.23% -$1,100.00
Amt Left: 45.01% $148,978.00
Delta: -15.07% -$62,856.00
Over/Under Est: 16.61% $79,900.00
Amt Left: 69.48% $229,978.00
Delta: -16.88% -$81,000.00

Bid Items & Bid Tabulations

13 Total 0 of 13
CHILDRESS  |  US0287  |  CHILDRESS  |  6477-21-001  |  01/15/2025  |  $481,100.00  |  RMC - A00212965  |  METAL BEAM GUARD FENCE REPAIR  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BK FIELD OPERATIONS LLC
ROSS SA ENTERPRISE LLC
HJC FARMS, INC.
ABOVE ALL CONTRACTING LLC
MOBILIZATION (CALLOUT)
EA 24.000 $2,500.000 $1.000 $1.000 $100.000 $1,000.000
TMA (STATIONARY)
DAY 48.000 $600.000 $1.000 $1,000.000 $2,000.000 $500.000
REPLACE RAIL ELEMENT (W-BEAM)
LF 4,800.000 $25.000 $18.000 $25.000 $27.000 $50.000
REPLACE RAIL ELEMENT (THRIE-BEAM)
LF 100.000 $40.000 $5.000 $1.000 $70.000 $100.000
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
EA 10.000 $200.000 $5.000 $100.000 $175.000 $3,500.000
REPLACE TIMBER POST W/O CONC FND
EA 500.000 $55.000 $1.000 $50.000 $50.000 $30.000
REPLACE STEEL POST W/O CONC FND
EA 500.000 $80.000 $1.000 $100.000 $100.000 $75.000
REPLACE STEEL POST W/ CONC FND
EA 500.000 $150.000 $1.000 $100.000 $100.000 $75.000
REALIGN POSTS
EA 200.000 $50.000 $100.000 $10.000 $10.000 $30.000
REM OBSOLETE GET & REPL W/ SGT
EA 24.000 $3,750.000 $7,000.000 $4,000.000 $4,125.000 $4,000.000
REPLACE BLOCKOUT
EA 200.000 $40.000 $200.000 $50.000 $17.000 $50.000
REPLACE SGT OBJECT MARKER
EA 20.000 $40.000 $100.000 $1.000 $30.000 $50.000
REPLACE DOWNSTREAM ANCHOR TERMINAL
EA 10.000 $1,500.000 $1,250.000 $1,500.000 $1,325.000 $2,500.000
Totals: $481,100.000 $331,022.000 $417,144.000 $480,000.000 $561,000.000