Show Job Controls
Bid Cobra

CHEROKEE FM0177 (6397-06-001)

Items: 47

County: CHEROKEE
Length: N/A
Highway: FM0177
District: TYLER
Control Number: 6397-06-001
DBE Goal: N/A
Project: RMC - 639706001
Guaranty: N/A
Time: 50 W
Engineer's Estimate: $413,173.36
Date: 04/06/2022 (4 years ago)
Contract Number: N/A
Type: CROSS DRAINAGE STRUCTURE REPAIR
Mail/Deliver Bids To: N/A
PAUL SCHEIDER
TRAVIS SINGLETON
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (6)
E
Engineer's Estimate
$413,173.36
$399,000.33
Over/Under Est: -3.43% -$14,173.03
Over/Under Est: 0.17% $706.61
Amt Left: 3.73% $14,879.64
Over/Under Est: 4.06% $16,771.06
Amt Left: 7.76% $30,944.09
Delta: -3.88% -$16,064.45
Over/Under Est: 13.54% $55,929.25
Amt Left: 17.57% $70,102.28
Delta: -9.11% -$39,158.19
Over/Under Est: 24.47% $101,103.82
Amt Left: 28.89% $115,276.85
Delta: -9.63% -$45,174.57
Over/Under Est: 55.37% $228,757.34
Amt Left: 60.88% $242,930.37
Delta: -24.82% -$127,653.52

Bid Items & Bid Tabulations

47 Total 0 of 47
CHEROKEE  |  FM0177  |  TYLER  |  6397-06-001  |  04/06/2022  |  $413,173.36  |  RMC - 639706001  |  CROSS DRAINAGE STRUCT REPAIR  |  50 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
RED BARON BUILDING COMPANY, LLC
CROSS PLUS CONSTRUCTION, LLC
L. S. EQUIPMENT CO., INC.
TALBRAN ENTERPRISES LLC
EAST TEXAS BRIDGE, INC.
FNH CONSTRUCTION, LLC
PREPARING ROW(OPT1)
STA 2.000 $1,500.000 $500.000 $1,100.000 $5,700.000 $4,000.000 $10,000.000 $20,000.000
REMOVING CONC (RIPRAP)
SY 27.000 $40.000 $45.580 $8.800 $12.000 $150.000 $40.000 $50.000
REMOVING CONC (CURB AND GUTTER)
LF 31.500 $25.000 $22.000 $6.600 $9.000 $50.000 $20.000 $50.000
REMOVING CONC (MISC)
CY 37.000 $50.000 $60.000 $95.000 $61.000 $80.000 $200.000 $50.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 309.000 $32.000 $28.000 $22.000 $22.000 $50.000 $40.000 $50.000
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 1,147.000 $1.750 $1.250 $1.100 $3.250 $1.000 $2.500 $2.000
VEGETATIVE WATERING
MG 12.617 $18.000 $42.990 $110.000 $10.000 $1.000 $40.000 $100.000
CEM STABIL BKFL
CY 184.000 $225.000 $225.000 $179.000 $210.000 $400.000 $275.000 $300.000
CUT & RESTORING PAV
SY 84.000 $225.000 $250.000 $149.000 $123.750 $150.000 $125.000 $200.000
TRENCH EXCAVATION PROTECTION
LF 161.000 $35.000 $20.000 $22.000 $42.000 $1.000 $25.000 $10.000
TEMPORARY SPL SHORING
SF 380.000 $60.000 $30.000 $39.000 $46.000 $1.000 $60.000 $85.000
CL A CONC (COLLAR)
EA 7.000 $1,200.000 $800.000 $550.000 $800.000 $2,000.000 $2,000.000 $1,500.000
RIPRAP (CONC)(4 IN)
CY 8.000 $550.000 $500.000 $495.000 $650.000 $600.000 $800.000 $550.000
RIPRAP (CONC)(5 IN)
CY 12.000 $550.000 $550.000 $550.000 $725.000 $600.000 $800.000 $650.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 134.000 $250.000 $225.000 $385.000 $145.000 $220.000 $200.000 $250.000
CONC BOX CULV (8 FT X 4 FT)(EXTEND)
LF 8.000 $700.000 $1,000.000 $1,100.000 $865.000 $1,000.000 $1,100.000 $1,000.000
CONC BOX CULV (8 FT X 8 FT)(EXTEND)
LF 15.000 $800.000 $1,200.000 $1,435.000 $1,050.000 $1,200.000 $1,200.000 $2,000.000
RC PIPE (CL III)(24 IN)
LF 148.000 $112.000 $190.000 $77.000 $85.000 $180.000 $90.000 $105.000
RC PIPE (CL III)(30 IN)
LF 6.000 $160.000 $200.000 $165.000 $160.000 $220.000 $150.000 $150.000
RC PIPE (CL III)(36 IN)
LF 48.000 $165.000 $240.000 $184.000 $185.000 $290.000 $175.000 $200.000
RC PIPE (CL III)(48 IN)
LF 12.000 $200.000 $280.000 $440.000 $620.000 $320.000 $275.000 $450.000
JCT BOX (COMPL)(SPL1)
EA 1.000 $12,000.000 $7,500.000 $11,000.000 $6,650.000 $18,000.000 $13,500.000 $22,000.000
JCT BOX (COMPL)(SPL2)
EA 1.000 $12,000.000 $8,500.000 $13,020.000 $5,600.000 $18,000.000 $12,000.000 $20,000.000
INLET (CURB)(SPL)
EA 1.000 $1,500.000 $2,800.000 $2,660.000 $10,225.000 $2,000.000 $10,000.000 $15,000.000
HEADWALL (CH - FW - 0) (DIA= 24 IN)
EA 2.000 $5,800.000 $4,000.000 $6,600.000 $8,325.000 $13,000.000 $6,000.000 $3,850.000
HEADWALL (CH - FW - 0) (DIA= 36 IN)
EA 2.000 $6,500.000 $10,000.000 $8,250.000 $6,120.000 $13,000.000 $12,000.000 $4,500.000
HEADWALL (CH - FW - 15) (DIA= 24 IN)
EA 2.000 $6,000.000 $6,500.000 $7,700.000 $6,845.000 $13,000.000 $5,000.000 $4,500.000
HEADWALL (CH - FW - 45) (DIA= 48 IN)
EA 1.000 $7,000.000 $11,000.000 $12,100.000 $13,290.000 $13,000.000 $17,000.000 $20,000.000
WINGWALL (FW - S) (HW=9 FT)
EA 2.000 $21,000.000 $21,000.000 $13,500.000 $23,975.000 $13,000.000 $19,000.000 $35,000.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 1.000 $2,300.000 $3,500.000 $3,300.000 $2,285.000 $4,000.000 $3,000.000 $11,000.000
REMOV STR (WINGWALL)
EA 3.000 $1,000.000 $2,000.000 $1,300.000 $1,000.000 $500.000 $2,000.000 $2,500.000
REMOV STR (HEADWALL)
EA 6.000 $1,000.000 $1,000.000 $1,300.000 $1,000.000 $500.000 $1,500.000 $2,500.000
REMOV STR (PIPE)
LF 188.000 $35.000 $48.290 $16.500 $22.000 $10.000 $15.000 $30.000
MOBILIZATION
LS 1.000 $50,000.000 $30,000.000 $38,500.000 $43,000.000 $47,437.000 $50,000.000 $60,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $2,000.000 $1,500.000 $5,500.000 $6,400.000 $1.000 $8,000.000 $8,500.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 30.000 $30.000 $25.000 $1.100 $33.000 $1.000 $50.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 30.000 $12.000 $10.000 $1.100 $15.000 $1.000 $10.000 $15.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 210.000 $3.500 $2.000 $1.100 $3.500 $1.000 $5.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 210.000 $1.750 $1.000 $1.100 $1.000 $1.000 $2.000 $2.000
CONC CURB & GUTTER (TY II)
LF 20.000 $55.000 $45.000 $22.000 $28.000 $80.000 $60.000 $100.000
CHAIN LINK FENCE (INSTALL) (6')
LF 30.000 $25.000 $40.000 $33.000 $85.000 $60.000 $100.000 $100.000
CHAIN LINK FENCE (REMOVE)
LF 30.000 $5.000 $2.500 $1.100 $15.000 $20.000 $10.000 $20.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 15.000 $50.000 $35.000 $33.000 $45.000 $50.000 $100.000 $100.000
DITCH CLEANING AND RESHAPING (FOOT)
LF 300.000 $10.000 $5.000 $5.500 $26.000 $10.000 $10.000 $50.000
GROUTING
CF 4.000 $50.000 $50.000 $1.100 $1,000.000 $200.000 $500.000 $1,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 87.000 $100.000 $100.000 $137.500 $115.000 $1.000 $200.000 $150.000
TMA (STATIONARY)
DAY 30.000 $175.000 $100.000 $385.000 $265.000 $1.000 $300.000 $250.000
Totals: $413,173.356 $399,000.335 $413,879.970 $429,944.420 $469,102.617 $514,277.180 $641,930.700