Show Job Controls
Bid Cobra

CHAMBERS IH0010 (6449-59-001)

Items: 26

County: CHAMBERS
Length: N/A
Highway: IH0010
District: BEAUMONT
Control Number: 6449-59-001
DBE Goal: N/A
Project: BPM - 644959001
Guaranty: N/A
Time: 38 W
Engineer's Estimate: $435,610.00
Date: 11/02/2023 (2 years ago)
Contract Number: N/A
Type: BRIDGE PREVENTATIVE MAINTENANCE
Mail/Deliver Bids To: N/A
ROBERTO M RODRIGUEZ
NYEMB NYEMB
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (7)
E
Engineer's Estimate
$435,610.00
$381,541.00
Over/Under Est: -12.41% -$54,069.00
Over/Under Est: -5.1% -$22,200.00
Amt Left: 8.35% $31,869.00
Over/Under Est: -0.96% -$4,190.00
Amt Left: 13.07% $49,879.00
Delta: -4.36% -$18,010.00
Over/Under Est: 18.83% $82,005.00
Amt Left: 35.66% $136,074.00
Delta: -19.98% -$86,195.00
Over/Under Est: 29.53% $128,652.00
Amt Left: 47.89% $182,721.00
Delta: -9.01% -$46,647.00
Over/Under Est: 38.81% $169,065.00
Amt Left: 58.48% $223,134.00
Delta: -7.16% -$40,413.00
Over/Under Est: 51.88% $225,979.00
Amt Left: 73.4% $280,048.00
Delta: -9.41% -$56,914.00

Bid Items & Bid Tabulations

26 Total 0 of 26
CHAMBERS  |  IH0010  |  BEAUMONT  |  6449-59-001  |  11/02/2023  |  $435,610.00  |  BPM - 644959001  |  BRIDGE PREVENT MAINT  |  38 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
STRUCTURAL INTEGRITY GROUP LLC
GARRET SHIELDS INFRASTRUCTURE
MB WESTERN INDUSTRIAL CONTRACTING COMPANY
PATHFIELD INVESTMENTS LLC
ISI CONTRACTING, INC.
AAD CONTRACTING INC.
SELECT MAINTENANCE, L.L.C.
PREPARING ROW
STA 3.000 $750.000 $1,100.000 $5,000.000 $1,000.000 $5,000.000 $1,250.000 $1,500.000 $32,000.000
SPEC EXCAV WORK (HYD EXCAVATOR)
HR 16.000 $417.000 $285.000 $200.000 $200.000 $150.000 $400.000 $100.000 $250.000
CEM STABIL BKFL
CY 14.000 $235.000 $620.000 $200.000 $260.000 $500.000 $6,000.000 $220.000 $300.000
FLOWABLE BACKFILL
CY 53.000 $400.000 $450.000 $700.000 $450.000 $500.000 $750.000 $240.000 $550.000
CL C CONC (WINGWALLS)
CY 10.000 $2,500.000 $3,100.000 $2,000.000 $3,500.000 $1,000.000 $2,200.000 $1,100.000 $1,800.000
CONC STR REPAIR (EPOXY MORTAR)
SF 26.000 $1,000.000 $200.000 $300.000 $245.000 $210.000 $350.000 $150.000 $340.000
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 38.000 $500.000 $225.000 $200.000 $245.000 $240.000 $500.000 $200.000 $125.000
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 20.000 $600.000 $525.000 $200.000 $607.000 $300.000 $550.000 $300.000 $1,200.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 82.000 $130.000 $200.000 $250.000 $250.000 $250.000 $1,300.000 $190.000 $185.000
RIPRAP (STONE TY R)(DRY)(6 IN)
CY 12.000 $350.000 $500.000 $250.000 $550.000 $210.000 $550.000 $175.000 $450.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 32.000 $181.000 $500.000 $250.000 $300.000 $400.000 $550.000 $250.000 $362.000
CLEANING AND SEALING EXISTING JOINTS
LF 140.000 $16.000 $33.000 $50.000 $75.000 $90.000 $48.000 $55.000 $35.000
CLEANING AND SEALING JOINTS (CL 7)
LF 1,276.000 $99.000 $41.000 $60.000 $50.000 $90.000 $17.000 $75.000 $35.000
CLEAN & PAINT EXIST PILING (SYS II)
LS 2.000 $5,000.000 $22,300.000 $32,000.000 $19,440.000 $5,000.000 $8,900.000 $35,000.000 $28,000.000
REMOV STR (WINGWALL)
EA 1.000 $7,000.000 $3,100.000 $5,000.000 $2,500.000 $10,000.000 $3,400.000 $1,200.000 $1,500.000
REMOV STR (PIPE)
LF 25.000 $30.000 $250.000 $100.000 $36.000 $3,000.000 $105.000 $75.000 $120.000
MOBILIZATION
LS 1.000 $9,000.000 $64,700.000 $40,000.000 $90,000.000 $40,000.000 $15,000.000 $75,000.000 $66,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $11,250.000 $11,000.000 $5,000.000 $2,000.000 $5,000.000 $1,500.000 $7,000.000 $42,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 350.000 $6.000 $1.000 $5.000 $5.000 $5.000 $5.000 $4.000 $2.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 350.000 $2.200 $1.000 $1.000 $2.000 $3.000 $1.500 $1.000 $0.500
TREE REMOVAL (12" - 18" DIA)
EA 1.000 $400.000 $2,900.000 $1,000.000 $1,000.000 $500.000 $1,250.000 $400.000 $2,500.000
DITCH CLEANING AND RESHAPING (FOOT)
LF 275.000 $10.000 $26.000 $50.000 $20.000 $35.000 $24.000 $12.000 $75.000
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 36.000 $67.000 $61.000 $100.000 $130.000 $200.000 $225.000 $95.000 $35.000
SOIL DENS.AND RAISING CONC.SLABS(HDPF)
LB 8,500.000 $9.500 $3.050 $5.000 $7.000 $10.000 $4.000 $20.000 $5.500
PORTABLE CHANGEABLE MESSAGE SIGN
EA 9.000 $1,200.000 $1.000 $100.000 $1,000.000 $1,000.000 $3,000.000 $8,000.000 $6,000.000
TMA (STATIONARY)
DAY 35.000 $300.000 $1.000 $300.000 $100.000 $250.000 $2,500.000 $150.000 $350.000
Totals: $435,610.000 $381,541.000 $413,410.000 $431,420.000 $517,615.000 $564,262.000 $604,675.000 $661,589.000