Show Job Controls
Bid Cobra

CHAMBERS FM1724 (6420-79-001)

Items: 39

County: CHAMBERS
Length: N/A
Highway: FM1724
District: BEAUMONT
Control Number: 6420-79-001
DBE Goal: N/A
Project: RMC - 642079001
Guaranty: N/A
Time: 60 W
Engineer's Estimate: $1,226,819.69
Date: 06/28/2023 (2 years ago)
Contract Number: N/A
Type: ASPHALT PAVEMENT WIDENING
Mail/Deliver Bids To: N/A
ROBERTO RODRIGUEZ
NYEMB NYEMB
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$1,226,819.69
$1,219,731.95
Over/Under Est: -0.58% -$7,087.74
Over/Under Est: 14.02% $171,953.06
Amt Left: 14.68% $179,040.80
Over/Under Est: 21.21% $260,247.26
Amt Left: 21.92% $267,335.00
Delta: -6.31% -$88,294.20
$1,689,000.00
Over/Under Est: 37.67% $462,180.31
Amt Left: 38.47% $469,268.05
Delta: -13.58% -$201,933.05
Subcontractor Percentage Amount
AMERICAN REMEDIATION OPTIONS, INC. 5.90% $76,332.04
PROFESSIONAL TRAFFIC CONTROL LLC 0.46% $5,951.31
Total: 6.36% $82,283.35

Bid Items & Bid Tabulations

39 Total 0 of 39
CHAMBERS  |  FM1724  |  BEAUMONT  |  6420-79-001  |  06/28/2023  |  $1,226,819.69  |  RMC - 642079001  |  ASPH PAVMT WIDENING  |  60 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
FORDE CONSTRUCTION COMPANY, INC.
ICON GC, LLC
SUBGRADE WIDENING (ORD COMP)
STA 71.000 $818.190 $375.000 $800.000 $1,250.000 $2,600.000
BACKFILL (TY A OR B)
STA 73.000 $291.220 $800.000 $350.000 $1,200.000 $793.000
BROADCAST SEED (TEMP) (WARM)
SY 6,459.000 $1.500 $0.350 $1.500 $1.000 $0.550
VEGETATIVE WATERING
MG 9.040 $91.000 $155.000 $300.000 $140.000 $11.330
PROOF ROLLING
HR 46.000 $144.640 $120.000 $25.000 $200.000 $105.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(7")
SY 313.000 $47.000 $86.000 $145.000 $139.000 $86.510
PLANE ASPH CONC PAV(0" TO 2")
SY 1,200.000 $9.100 $11.000 $16.500 $14.000 $14.000
PLANE ASPH CONC PAV (1")
SY 1,672.000 $2.500 $8.000 $18.600 $9.500 $4.000
RIPRAP (MOW STRIP)(4 IN)
CY 36.000 $650.000 $985.000 $1,200.000 $1,200.000 $725.000
MOBILIZATION
LS 1.000 $86,632.000 $118,000.000 $130,000.000 $75,000.000 $116,889.440
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $3,500.000 $1,000.000 $4,000.000 $25,000.000 $15,000.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 250.000 $7.000 $8.500 $15.000 $5.000 $9.200
BIODEG EROSN CONT LOGS (REMOVE)
LF 250.000 $1.750 $2.000 $5.000 $2.000 $4.950
DRIVEWAYS (ACP)
SY 486.000 $66.230 $37.000 $102.100 $86.000 $160.000
RUMBLE STRIPS (CENTERLINE)
LF 7,144.000 $0.850 $0.600 $1.000 $2.300 $1.290
MTL W-BEAM GD FEN (TIM POST)
LF 650.000 $45.000 $28.000 $32.000 $24.000 $61.330
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $1,050.000 $2,000.000 $2,200.000 $2,400.000 $1,545.000
REMOVE METAL BEAM GUARD FENCE
LF 650.000 $15.000 $2.750 $5.000 $2.400 $6.200
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $210.000 $276.000 $250.000 $300.000 $620.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,100.000 $3,000.000 $3,200.000 $4,300.000 $3,100.000
RELOCATE EXISTING MAILBOX
EA 6.000 $250.000 $385.000 $250.000 $300.000 $250.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 11.000 $841.000 $630.000 $650.000 $760.000 $925.000
REMOVE SM RD SN SUP&AM
EA 10.000 $134.000 $0.150 $99.000 $100.000 $300.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 15.000 $5.000 $27.000 $55.000 $12.000 $25.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 25.000 $40.000 $41.000 $35.000 $30.000 $300.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 654.000 $2.000 $0.850 $2.000 $5.000 $6.200
REF PROF PAV MRK TY I(W)6"(SLD)(090MIL)
LF 15,886.000 $1.050 $1.300 $1.000 $1.400 $1.000
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
LF 1,712.000 $0.790 $0.850 $2.000 $0.900 $0.670
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 2,538.000 $0.750 $0.850 $2.000 $0.900 $0.670
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 20.000 $20.000 $16.000 $40.000 $21.000 $16.000
REFL PAV MRKR TY II-A-A
EA 199.000 $5.000 $5.500 $6.350 $8.250 $6.000
JT / CRCK ROUT / SEAL(RUBBER - ASPHALT)
LF 15,886.000 $6.000 $5.000 $4.500 $3.500 $1.000
D-GR HMA TY-D PG64-22
TON 2,476.000 $167.000 $131.000 $165.000 $150.000 $190.000
TACK COAT
GAL 111.000 $9.600 $4.000 $4.000 $6.000 $7.500
SP MIXES SP-C SAC-A PG76-22
TON 2,461.000 $120.000 $150.000 $151.800 $160.000 $185.000
TACK COAT
GAL 1,525.000 $7.000 $4.000 $4.000 $6.000 $7.500
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 60.000 $100.000 $180.000 $100.000 $200.000 $111.000
TMA (STATIONARY)
DAY 60.000 $350.000 $365.000 $125.000 $200.000 $245.000
TMA (MOBILE OPERATION)
DAY 5.000 $600.000 $700.000 $125.000 $200.000 $2,000.000
Totals: $1,226,819.690 $1,219,731.950 $1,398,772.750 $1,487,066.950 $1,689,000.003