CHAMBERS SH 99 (3510-10-022)

Items: 158

County: CHAMBERS
Length: N/A
Highway: SH 99
District: BEAUMONT
Control Number: 3510-10-022
DBE Goal: N/A
Project: C 3510-10-22
Guaranty: N/A
Time: 285 WORKING DAYS
Engineer's Estimate: $15,984,607.84
Date: 06/02/2022 (4 years ago)
Contract Number: N/A
Type: CONSTRUCT BRIDGE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (8)
E
Engineer's Estimate
$15,984,607.84
1
$23,691,228.21
Over/Under Est: 48.21% $7,706,620.37
Over/Under Est: 53.71% $8,585,844.66
Amt Left: 3.71% $879,224.29
Over/Under Est: 58.86% $9,407,869.26
Amt Left: 7.18% $1,701,248.89
Delta: -3.35% -$822,024.60
Over/Under Est: 62.49% $9,988,879.44
Amt Left: 9.63% $2,282,259.07
Delta: -2.29% -$581,010.18
Over/Under Est: 66.68% $10,658,325.12
Amt Left: 12.46% $2,951,704.75
Delta: -2.58% -$669,445.68
Over/Under Est: 70.55% $11,277,477.24
Amt Left: 15.07% $3,570,856.87
Delta: -2.32% -$619,152.12
Over/Under Est: 77.99% $12,465,657.66
Amt Left: 20.09% $4,759,037.29
Delta: -4.36% -$1,188,180.42
Over/Under Est: 96.51% $15,426,623.48
Amt Left: 32.59% $7,720,003.11
Delta: -10.41% -$2,960,965.82
Subcontractor Percentage Amount
TEXAS STERLING CONSTRUCTION CO. 6.52% $1,553,565.59
ALLSTATE SIGNAL & CONSTRUCTION, LLC 3.74% $891,155.72
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 1.62% $386,008.63
GMJ PAVING CO. 1.26% $300,228.93
A&J REBAR LLC 0.85% $202,535.39
GOULD INDUSTRIES LLC 0.48% $114,372.93
VALLEY PLACERS, LLC 0.47% $111,990.16
WILLOW CITY SIGN & RAIL, INC. 0.44% $104,841.85
BATTERSON, LLP 0.38% $90,545.23
CPAVE, INC. 0.25% $59,569.23
SCOTT DERR PAINTING CO, LLC 0.24% $57,186.46
MTAM CORPORATION 0.09% $21,444.92
PRIMATE CONSTRUCTION, LP 0.08% $19,062.15
DUSTROL, INC. 0.07% $16,679.39
HIGHWAY PAVEMENT SPECIALTIES, INC. 0.06% $14,296.62
AGGREGATE TECHNOLOGIES, INC. 0.05% $11,913.85
Total: 16.60% $3,955,397.05

Bid Items & Bid Tabulations

158 Total 0 of 158
CHAMBERS  |  SH 99  |  BEAUMONT  |  3510-10-022  |  06/02/2022  |  $15,984,607.84  |  C 3510-10-22  |  CONSTRUCT BRIDGE  |  285 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
WEBBER, LLC
STERLING DELAWARE HOLDING COMPANY, INC.
HARPER BROTHERS CONSTRUCTION LLC
SER CONSTRUCTION PARTNERS, LLC
JAMES CONSTRUCTION GROUP, LLC
RAGLE CONSTRUCTION, INC.
GRANITE CONSTRUCTION COMPANY
TEXAS MATERIALS GROUP, INC.
PREPARING ROW
STA 57.030 $3,000.000 $41,541.690 $18,275.000 $4,250.000 $6,200.000 $23,815.000 $30,500.000 $8,700.000 $25,900.000
REMOVING CONC (PAV)
SY 3,702.300 $3.100 $13.000 $18.000 $15.000 $36.000 $21.900 $9.500 $25.000 $13.000
REMOVING STAB BASE AND ASPH PAV (6")
SY 4,624.400 $2.000 $4.500 $13.000 $7.500 $17.300 $4.810 $6.000 $15.000 $5.000
EXCAVATION (ROADWAY)
CY 5,797.000 $5.150 $3.200 $10.000 $12.500 $13.000 $13.700 $33.000 $4.470 $22.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 83,937.000 $8.300 $8.000 $19.000 $8.000 $23.400 $23.690 $12.000 $35.000 $31.000
EMBANK(FINAL)(DC)(TY E)(CSBE)
CY 14,144.000 $33.000 $52.000 $45.000 $60.000 $46.300 $51.560 $55.000 $75.000 $79.000
EMB(FNL)(DC)(TYE)(CSBE)(RWALL FND IMPR
CY 11,154.000 $43.000 $53.000 $48.000 $60.000 $46.400 $53.780 $55.000 $75.000 $86.000
EMB(FINAL)(DC)(TYE)(CSBE)(EMB FND IMPR)
CY 21,958.000 $43.000 $53.500 $48.000 $60.000 $51.300 $53.470 $55.000 $75.000 $88.000
BLOCK SODDING
SY 51,034.000 $2.700 $4.140 $4.150 $4.000 $4.400 $4.140 $3.000 $4.000 $4.200
STRAW OR HAY MULCH
SY 51,034.000 $0.200 $0.530 $0.550 $0.170 $0.560 $0.530 $0.100 $0.170 $0.180
DRILL SEED (TEMP)(WARM OR COOL)
SY 51,034.000 $0.130 $0.140 $0.150 $0.200 $0.150 $0.140 $0.100 $0.200 $0.210
FERTILIZER
AC 21.080 $715.000 $930.350 $931.000 $700.000 $990.000 $931.000 $930.000 $700.000 $715.000
VEGETATIVE WATERING
MG 2,528.000 $12.200 $30.160 $24.000 $25.000 $1.000 $30.160 $15.000 $37.840 $17.500
LIME TRT (EXST MATL) (6")
SY 30,398.500 $1.500 $1.700 $2.750 $1.000 $4.500 $3.370 $3.000 $3.660 $3.650
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 410.400 $160.000 $240.500 $230.000 $242.000 $245.000 $273.550 $190.000 $245.930 $300.000
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
SY 30,398.500 $5.700 $7.000 $18.500 $17.000 $15.400 $23.020 $15.000 $17.720 $20.800
ASPHALT STAB BASE (GR 2)(PG 70)
TON 569.000 $90.000 $75.000 $134.000 $117.500 $138.000 $132.760 $115.000 $118.690 $156.000
ASPHALT STAB BASE (GR 4)(PG 64)
TON 1,671.900 $77.000 $70.000 $128.000 $112.500 $117.000 $112.340 $110.000 $113.640 $169.000
SALV, HAUL & STKPL RCL ASH PV (12")
SY 1,034.000 $3.600 $6.000 $18.000 $10.000 $15.800 $5.280 $12.500 $20.000 $7.000
CONC PVMT (CONT REINF - CRCP) (12")
SY 28,148.500 $46.000 $52.000 $95.000 $105.000 $99.300 $107.440 $95.000 $96.090 $98.000
STRUCT EXCAV
CY 34,899.000 $8.000 $8.000 $12.000 $12.000 $12.600 $6.500 $10.000 $10.000 $14.500
CEM STABIL BKFL
CY 204.920 $40.000 $50.000 $52.000 $65.000 $42.500 $51.410 $75.000 $75.000 $56.000
CEMENT STAB BACKFILL (INLET OR MH)
CY 23.000 $40.000 $50.000 $52.000 $65.000 $42.500 $51.410 $100.000 $75.000 $56.000
TEMPORARY SPL SHORING
SF 1,076.000 $20.000 $2.000 $14.000 $2.000 $32.800 $11.210 $15.000 $17.150 $73.000
DRILL SHAFT (18 IN)
LF 200.000 $77.000 $45.000 $47.000 $80.000 $60.000 $52.610 $70.000 $75.000 $43.000
DRILL SHAFT (24 IN)
LF 56.000 $140.000 $190.000 $160.000 $165.000 $182.000 $159.910 $195.000 $200.000 $170.000
DRILL SHAFT (36 IN)
LF 1,112.000 $230.000 $153.000 $175.000 $370.000 $186.000 $177.640 $175.000 $250.000 $265.000
DRILL SHAFT (42 IN)
LF 360.000 $250.000 $320.000 $606.000 $500.000 $328.000 $274.320 $550.000 $365.000 $330.000
DRILL SHAFT (72 IN)
LF 2,810.000 $540.000 $620.000 $635.000 $1,370.000 $708.000 $652.050 $710.000 $1,000.000 $610.000
DRILL SHAFT (NON - REINFORCED) (12 IN)
LF 14.000 $73.000 $111.120 $112.000 $110.000 $133.000 $111.120 $111.120 $110.000 $128.000
DRILL SHAFT (SIGN MTS) (54 IN)
LF 28.000 $200.000 $649.320 $650.000 $990.000 $1,053.000 $649.320 $649.320 $659.210 $1,020.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 120.000 $253.510 $183.750 $185.000 $275.000 $292.000 $183.750 $183.750 $186.550 $282.000
CL A CONC (MISC)
CY 10.000 $630.000 $500.000 $1,035.000 $1,100.000 $1,030.000 $1,025.880 $1,500.000 $501.330 $1,514.000
CL C CONC (ABUT)
CY 100.800 $812.000 $1,200.000 $1,175.000 $1,200.000 $1,470.000 $1,201.300 $1,250.000 $1,062.350 $2,945.000
CL C CONC (COLUMN)
CY 715.400 $845.000 $1,400.000 $1,055.000 $1,625.000 $1,570.000 $1,834.580 $2,350.000 $1,214.750 $2,450.000
CL C CONC (FOOTING)
CY 39.200 $800.000 $900.000 $1,125.000 $1,475.000 $1,480.000 $1,554.720 $950.000 $1,099.900 $5,827.000
CL F CONC (CAP)
CY 846.000 $615.000 $1,075.000 $875.000 $1,175.000 $1,170.000 $901.070 $1,200.000 $1,221.550 $1,254.000
REINF CONC SLAB
SF 88,920.000 $12.000 $23.000 $20.000 $20.000 $25.800 $20.460 $20.000 $19.130 $21.800
RETAINING WALL (CAST - IN - PLACE)
SF 212.000 $60.000 $38.000 $78.000 $110.000 $157.000 $161.440 $100.000 $89.680 $129.000
RETAINING WALL (MSE) (WAVE SCHEME)
SF 43,274.000 $30.000 $50.000 $34.000 $50.000 $32.300 $33.630 $42.500 $30.850 $39.000
PRESTR CONC GIRDER (TX46)
LF 10,613.300 $100.000 $180.000 $191.000 $200.000 $240.000 $199.040 $195.000 $208.280 $200.000
RIPRAP (CONC)(4 IN)
CY 144.300 $386.000 $200.000 $410.000 $600.000 $500.000 $440.050 $550.000 $385.340 $780.000
RIPRAP (CONC)(5 IN)
CY 40.000 $425.000 $200.000 $420.000 $650.000 $500.000 $469.380 $530.000 $507.380 $990.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 156.800 $410.000 $230.000 $380.000 $650.000 $500.000 $446.310 $530.000 $387.460 $784.000
RIPRAP (MOW STRIP)(4 IN)
CY 173.000 $447.000 $240.000 $560.000 $650.000 $562.000 $603.110 $525.000 $589.710 $739.000
RAIL (TY SSTR)
LF 6,119.000 $47.000 $30.000 $58.000 $65.000 $56.000 $57.610 $55.000 $65.290 $71.000
RAIL (TY SSTR) (W/DRAIN SLOTS)
LF 2,300.000 $47.000 $30.000 $59.000 $70.000 $55.000 $58.820 $60.000 $77.510 $79.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 392.000 $105.500 $215.000 $160.000 $200.000 $149.000 $178.660 $170.000 $192.710 $244.000
RC PIPE (CL III)(18 IN)
LF 1,970.500 $72.000 $90.000 $75.000 $70.000 $79.200 $86.490 $70.000 $100.000 $100.000
RC PIPE (CL III)(24 IN)
LF 522.000 $75.000 $100.000 $91.000 $80.000 $93.400 $87.390 $85.000 $150.000 $119.000
INLET (COMPL)(TY AZR)
EA 14.000 $4,500.000 $5,900.000 $9,000.000 $11,150.000 $7,964.000 $11,276.750 $9,500.000 $12,000.000 $6,800.000
MANH (COMPL)(TY A)
EA 4.000 $4,500.000 $4,200.000 $6,000.000 $7,500.000 $6,288.000 $8,342.670 $7,000.000 $6,000.000 $4,750.000
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 1.000 $1,150.000 $960.000 $850.000 $1,575.000 $1,324.000 $1,298.220 $1,000.000 $2,000.000 $810.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 1.000 $1,150.000 $1,100.000 $900.000 $1,685.000 $1,457.000 $1,385.410 $1,050.000 $2,000.000 $890.000
SET (TY II) (18 IN) (RCP) (6: 1) (C)
EA 1.000 $1,150.000 $1,200.000 $930.000 $1,725.000 $1,820.000 $1,423.550 $1,200.000 $2,000.000 $930.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 4.000 $1,150.000 $1,200.000 $930.000 $1,675.000 $1,820.000 $2,052.550 $1,025.000 $2,000.000 $930.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 1.000 $1,400.000 $1,250.000 $925.000 $1,700.000 $1,823.000 $1,407.200 $1,500.000 $2,500.000 $938.000
MOBILIZATION
LS 1.000 $1,430,000.000 $2,369,122.850 $2,450,000.000 $75,000.000 $2,200,000.000 $2,600,000.000 $2,675,000.000 $2,685,000.000 $2,758,975.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 19.000 $6,600.000 $1,000.000 $2,540.000 $4,500.000 $2,014.000 $5,155.840 $12,000.000 $3,656.260 $3,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 80.000 $32.000 $35.920 $36.000 $35.920 $38.000 $35.920 $35.920 $50.000 $49.500
ROCK FILTER DAMS (REMOVE)
LF 80.000 $8.000 $11.880 $11.000 $11.880 $12.600 $11.880 $11.880 $12.000 $14.500
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 800.000 $27.000 $31.260 $32.000 $31.260 $33.200 $31.260 $31.260 $55.000 $32.000
CONSTRUCTION EXITS (REMOVE)
SY 800.000 $7.400 $7.550 $7.000 $7.550 $8.000 $7.550 $7.550 $10.000 $7.500
CONSTRUCTION PERIMETER FENCE
LF 534.000 $6.000 $6.190 $7.000 $6.000 $2.100 $10.000 $5.090 $10.000 $77.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 520.000 $2.400 $6.740 $9.000 $6.740 $7.200 $6.740 $6.740 $8.000 $5.250
TEMP SEDMT CONT FENCE (REMOVE)
LF 520.000 $0.700 $2.940 $3.000 $2.940 $3.100 $2.940 $2.940 $3.000 $1.030
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 825.000 $3.700 $4.640 $5.000 $4.640 $4.900 $4.640 $4.640 $4.640 $8.250
BIODEG EROSN CONT LOGS (REMOVE)
LF 825.000 $0.800 $1.860 $2.000 $1.860 $2.000 $1.860 $1.860 $1.860 $1.030
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 10,500.000 $41.000 $45.000 $55.000 $65.000 $33.700 $41.070 $75.000 $50.000 $78.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 660.000 $4.650 $3.000 $6.000 $12.500 $12.200 $3.260 $10.000 $10.000 $18.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 10,500.000 $8.500 $3.100 $12.000 $12.500 $8.900 $5.900 $10.000 $5.000 $12.750
TURNOUTS (ACP)
SY 160.000 $50.000 $65.000 $135.000 $127.050 $185.000 $214.890 $65.000 $65.660 $89.000
MTL W-BEAM GD FEN (TIM POST)
LF 902.000 $18.400 $29.000 $29.000 $29.000 $32.400 $29.000 $35.000 $29.000 $33.250
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 10.000 $1,750.000 $2,150.000 $2,150.000 $2,150.000 $2,312.000 $2,150.000 $1,000.000 $2,150.000 $2,450.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,250.000 $1,500.000 $1,500.000 $1,500.000 $1,800.000 $1,500.000 $1,500.000 $1,500.000 $1,900.000
GUARDRAIL END TREATMENT (INSTALL)
EA 10.000 $2,800.000 $3,100.000 $3,100.000 $3,100.000 $4,172.000 $3,100.000 $2,500.000 $3,100.000 $3,520.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 1.000 $3,100.000 $4,250.000 $4,250.000 $4,250.000 $5,581.000 $4,250.000 $2,500.000 $2,848.720 $1,700.000
CRASH CUSH ATTEN (REMOVE)
EA 8.000 $700.000 $1,200.000 $1,200.000 $1,200.000 $1,329.000 $1,200.000 $1,000.000 $1,649.750 $1,080.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 8.000 $22,000.000 $28,250.000 $28,250.000 $28,250.000 $36,800.000 $28,250.000 $28,000.000 $26,128.060 $22,000.000
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 4.000 $1,333.000 $1,147.000 $1,147.000 $1,060.000 $1,127.000 $1,147.000 $1,147.000 $1,164.470 $1,075.000
IN RD IL (TY SA) 50T-10 (400W EQ) LED
EA 12.000 $4,142.000 $4,304.000 $4,304.000 $5,540.000 $5,890.000 $4,304.000 $4,304.000 $4,369.540 $5,700.000
CONDT (PVC) (SCH 40) (2")
LF 2,355.000 $9.500 $15.750 $15.750 $10.000 $10.600 $15.750 $15.750 $15.990 $10.250
CONDT (PVC) (SCH 40) (3")
LF 1,770.000 $15.000 $22.300 $22.300 $16.000 $17.000 $22.300 $22.300 $22.640 $16.500
CONDT (PVC) (SCH 80) (2")
LF 11,160.000 $11.620 $13.090 $13.100 $12.500 $13.300 $13.090 $13.090 $13.290 $12.750
CONDT (PVC) (SCH 80) (2") (BORE)
LF 1,295.000 $25.850 $16.970 $17.000 $17.750 $18.900 $16.970 $16.970 $17.230 $18.000
CONDT (PVC) (SCH 80) (3")
LF 700.000 $12.050 $20.090 $20.100 $24.000 $25.500 $20.090 $20.090 $20.400 $24.500
CONDT (PVC) (SCH 80) (3") (BORE)
LF 740.000 $23.000 $22.740 $22.750 $30.000 $31.900 $22.740 $22.740 $23.090 $31.000
CONDT (RM) (3/4")
LF 415.000 $27.530 $20.050 $20.000 $20.000 $21.300 $20.050 $20.050 $20.360 $21.000
CONDT (RM) (2")
LF 585.000 $31.940 $25.560 $25.600 $38.000 $40.400 $25.560 $25.560 $25.950 $39.000
ELEC CONDR (NO.14) INSULATED
LF 580.000 $0.760 $1.070 $1.100 $1.100 $1.200 $1.070 $1.070 $1.090 $1.150
ELEC CONDR (NO.8) BARE
LF 12,285.000 $1.330 $1.340 $1.350 $1.800 $1.900 $1.340 $1.340 $1.360 $1.850
ELEC CONDR (NO.8) INSULATED
LF 24,570.000 $1.550 $2.500 $2.500 $1.850 $2.000 $2.500 $2.500 $2.540 $1.900
ELEC CONDR (NO.2) BARE
LF 1,435.000 $2.420 $3.350 $3.350 $3.900 $4.150 $3.350 $3.350 $3.400 $4.000
ELEC CONDR (NO.2) INSULATED
LF 4,650.000 $2.560 $3.790 $3.800 $4.000 $4.250 $3.790 $3.790 $3.850 $4.100
GROUND BOX TY A (122311)
EA 5.000 $750.000 $740.000 $740.000 $720.000 $765.000 $740.000 $740.000 $751.270 $728.000
GROUND BOX TY D (162922)W/APRON
EA 35.000 $1,200.000 $1,195.000 $1,195.000 $965.000 $1,026.000 $1,195.000 $1,195.000 $1,213.200 $985.000
ELC SRV TY A 240/480 060(SS)SS(E)GC(U)
EA 1.000 $6,787.620 $5,915.000 $5,915.000 $6,900.000 $7,335.000 $5,915.000 $5,915.000 $6,005.080 $7,000.000
ELC SRV TY D 120/240 200(NS)SS(N)SP(O)
EA 1.000 $6,500.000 $6,184.000 $6,184.000 $7,175.000 $7,628.000 $6,184.000 $6,184.000 $6,278.170 $7,250.000
ALUMINUM SIGNS (TY G)
SF 461.000 $31.000 $25.770 $25.800 $35.000 $37.200 $30.000 $25.770 $30.000 $35.500
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 196.000 $120.000 $21.000 $21.000 $21.000 $42.500 $21.000 $32.020 $21.000 $22.500
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $465.000 $480.000 $480.000 $480.000 $585.000 $480.000 $650.010 $480.000 $510.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 11.000 $690.000 $655.000 $655.000 $655.000 $691.000 $355.000 $912.780 $655.000 $528.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 4.000 $600.000 $835.000 $835.000 $835.000 $957.000 $835.000 $1,177.140 $835.000 $510.000
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 2.000 $1,400.000 $2,200.000 $2,200.000 $2,200.000 $1,276.000 $2,200.000 $2,425.390 $2,200.000 $630.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 2.000 $1,800.000 $1,533.830 $1,534.000 $2,625.000 $2,658.000 $2,625.000 $1,533.830 $2,625.000 $2,550.000
INSTALL LRSS (STRUCT STEEL)
LB 2,832.800 $5.000 $5.090 $5.500 $5.000 $8.100 $5.090 $5.090 $5.000 $8.000
INS OH SN SUP(30 FT CANT)(SPAN ONLY)
EA 4.000 $11,500.000 $17,871.000 $17,871.000 $15,500.000 $16,480.000 $17,871.000 $17,871.000 $18,143.150 $16,000.000
INS OH SN SUP(35 FT BAL TEE)
EA 1.000 $21,750.000 $44,617.000 $44,617.000 $60,000.000 $63,800.000 $44,617.000 $44,617.000 $45,296.450 $61,000.000
SIGN WALKWAY (36 IN) WITH HNDRL
LF 31.000 $250.000 $160.000 $160.000 $505.000 $537.000 $160.000 $160.000 $162.440 $520.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 64.000 $25.000 $25.000 $25.000 $25.000 $15.400 $25.000 $18.270 $25.000 $67.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 38.000 $25.000 $25.000 $25.000 $25.000 $15.400 $25.000 $16.310 $25.000 $86.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 18.000 $24.000 $32.000 $32.000 $32.000 $31.500 $32.000 $28.720 $32.000 $70.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 12.000 $28.000 $32.000 $32.000 $32.000 $32.150 $32.000 $32.650 $32.000 $107.000
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 24.000 $7.000 $10.000 $10.000 $10.000 $6.050 $10.000 $10.000 $5.000 $10.250
PAVEMENT SEALER (ARROW)
EA 2.000 $22.000 $50.000 $50.000 $25.000 $8.050 $50.000 $25.000 $15.000 $51.000
PAVEMENT SEALER (WORD)
EA 2.000 $220.000 $50.000 $50.000 $25.000 $12.500 $50.000 $25.000 $20.000 $51.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 2.000 $22.000 $255.000 $255.000 $354.160 $209.000 $255.000 $354.160 $40.000 $260.000
PREFAB PAV MRK TY C (W) (WORD)
EA 2.000 $22.000 $325.000 $325.000 $311.360 $258.000 $325.000 $311.360 $250.000 $330.000
REFL PAV MRKR TY II-C-R
EA 304.000 $7.000 $5.000 $5.000 $6.500 $4.450 $5.000 $6.500 $6.000 $5.100
TRAFFIC BUTTON TY I-A
EA 454.000 $4.000 $5.000 $5.000 $6.500 $10.600 $5.000 $6.500 $4.500 $5.100
TRAFFIC BUTTON TY I-C
EA 881.000 $4.000 $5.000 $5.000 $6.500 $6.400 $5.000 $6.500 $4.500 $5.100
TRAFFIC BUTTON TY W
EA 1,525.000 $3.500 $5.000 $5.000 $6.500 $3.400 $5.000 $6.500 $4.500 $5.100
TRAFFIC BUTTON TY Y
EA 1,361.000 $3.500 $5.000 $5.000 $6.500 $2.900 $5.000 $6.500 $4.500 $5.100
ELIM EXT PAV MRK & MRKS (4")
LF 36,571.000 $0.700 $0.600 $0.600 $0.400 $0.260 $0.600 $0.400 $0.350 $0.630
ELIM EXT PAV MRK & MRKS (24")
LF 24.000 $2.200 $3.500 $3.500 $2.500 $2.000 $3.500 $2.500 $2.250 $3.550
PAV SURF PREP FOR MRK (4")
LF 19,114.000 $0.020 $0.050 $0.050 $0.020 $0.020 $0.050 $0.020 $0.200 $0.060
PAV SURF PREP FOR MRK (6")
LF 35,122.000 $0.100 $0.080 $0.080 $0.030 $0.020 $0.080 $0.030 $0.250 $0.090
PAV SURF PREP FOR MRK (8")
LF 3,929.000 $0.100 $0.200 $0.200 $0.040 $0.040 $0.200 $0.040 $0.300 $0.220
PAV SURF PREP FOR MRK (12")
LF 1,140.000 $0.450 $0.500 $0.500 $0.060 $0.060 $0.500 $0.060 $0.600 $0.510
PAV SURF PREP FOR MRK (24")
LF 24.000 $0.450 $1.000 $1.000 $0.120 $0.130 $1.000 $0.120 $1.210 $1.050
PAV SURF PREP FOR MRK (ARROW)
EA 2.000 $14.000 $20.000 $20.000 $25.000 $4.300 $20.000 $25.000 $15.000 $20.500
PAV SURF PREP FOR MRK (WORD)
EA 2.000 $12.000 $20.000 $20.000 $25.000 $6.300 $20.000 $25.000 $15.000 $20.500
FULL - WIDTH MOWING
CYC 5.000 $1,800.000 $3,789.130 $2,000.000 $1,400.000 $2,300.000 $3,498.690 $500.000 $3,000.000 $2,550.000
LITTER REMOVAL
CYC 5.000 $1,200.000 $1,849.970 $800.000 $1,950.000 $1,650.000 $1,473.000 $500.000 $4,148.140 $2,075.000
WIDE FLANGE PAVEMENT TERMINALS
LF 161.680 $257.000 $400.000 $425.000 $900.000 $696.000 $498.280 $550.000 $558.630 $960.000
D-GR HMA TY-D PG70-22 (LEVEL-UP)
TON 114.000 $90.000 $185.000 $214.600 $187.500 $213.000 $133.560 $185.000 $189.390 $212.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 40.000 $40.000 $108.250 $31.700 $100.000 $96.400 $272.460 $200.000 $126.060 $200.000
FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER)
LF 990.000 $2.000 $2.080 $2.100 $2.850 $3.000 $2.080 $2.080 $2.110 $2.900
FIBER OPTIC CBL (SNGLE-MODE)(144 FIBER)
LF 2,835.000 $4.000 $4.150 $4.150 $4.250 $4.500 $4.150 $4.150 $4.210 $4.350
FO SPLICE ENCLOSURE (TYPE 1)
EA 3.000 $2,500.000 $1,805.000 $1,805.000 $2,350.000 $2,500.000 $1,805.000 $1,805.000 $1,832.490 $2,380.000
FIBER OPTIC FUSION SPLICE
EA 448.000 $94.210 $53.100 $53.000 $55.000 $58.500 $53.100 $53.100 $53.910 $56.000
FIBER OPTIC PATCH PANEL (12 POSITION)
EA 2.000 $3,500.000 $1,685.000 $1,685.000 $2,000.000 $2,126.000 $1,685.000 $1,685.000 $1,710.660 $2,050.000
REMOVE FIBER OPTIC CABLE
LF 200.000 $3.800 $10.000 $10.000 $0.500 $0.500 $10.000 $10.000 $10.150 $0.510
ITS GRND MNT CAB (TY 6) (CONF 2)
EA 2.000 $11,500.000 $9,774.000 $9,774.000 $10,995.000 $11,690.000 $9,774.000 $9,774.000 $9,922.850 $11,200.000
CONDUIT (PREPARE)
LF 2,835.000 $2.410 $2.650 $2.650 $0.500 $0.550 $2.650 $2.650 $2.690 $0.510
GROUND BOX (PREPARE)
EA 3.000 $400.000 $100.000 $100.000 $185.000 $197.000 $100.000 $100.000 $101.520 $188.000
MULTIPOLYMER PAV MRK (W)(6")(SLD)
LF 14,580.000 $1.500 $0.700 $0.700 $1.500 $0.450 $0.700 $1.500 $0.650 $0.720
MULTIPOLYMER PAV MRK (W)(6")(BRK)
LF 2,980.000 $1.500 $0.700 $0.700 $1.750 $0.550 $0.700 $1.750 $0.700 $0.720
MULTIPOLYMER PAV MRK (W)(8")(SLD)
LF 3,929.000 $2.000 $1.300 $1.300 $2.250 $0.900 $1.300 $2.250 $0.800 $1.350
MULTIPOLYMER PAV MRK (W)(12")(SLD)
LF 1,140.000 $4.000 $7.500 $7.500 $6.000 $3.000 $7.500 $6.000 $3.500 $7.600
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
LF 14,582.000 $1.500 $0.700 $0.700 $1.500 $0.450 $0.700 $1.500 $0.650 $0.720
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
LF 2,980.000 $1.500 $0.900 $0.900 $1.750 $0.650 $0.900 $1.750 $0.750 $0.920
TMA (STATIONARY)
DAY 2.000 $225.000 $541.250 $425.000 $650.000 $425.000 $831.860 $1,000.000 $903.570 $1,260.000
TMA (MOBILE OPERATION)
HR 60.000 $26.000 $108.250 $55.000 $75.000 $42.500 $134.240 $225.000 $125.680 $155.000
ITS GND BOX(PCAST) TY 1 (243648)W/APRN
EA 11.000 $4,000.000 $2,890.000 $2,890.000 $3,225.000 $3,429.000 $2,890.000 $2,890.000 $2,934.010 $3,275.000
ITS GND BOX(PCAST) TY 2 (366060)W/APRN
EA 3.000 $9,000.000 $3,565.000 $3,565.000 $6,900.000 $7,335.000 $3,565.000 $3,565.000 $3,619.290 $6,990.000
LIGHTING PROTECTION SYSTEM
EA 2.000 $11,500.000 $24,460.000 $24,460.000 $25,000.000 $26,600.000 $24,460.000 $24,460.000 $21,560.000 $25,500.000
REMOVE AND RELOCATE DMS SYSTEM
EA 1.000 $17,375.000 $10,250.000 $10,250.000 $10,500.000 $11,163.000 $10,250.000 $10,250.000 $10,406.090 $10,700.000
Totals: $15,984,607.840 $23,691,228.221 $24,570,452.505 $25,392,477.100 $25,973,487.280 $26,642,933.011 $27,262,085.082 $28,450,265.535 $31,411,231.325